2015-Aug-21 Accel. Phys. Biweekly Report
Jump to navigation
Jump to search
Todd Satogata
Previous two weeks (Aug 10-21) - CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam; fopt optics tuning development (w/Eric Thompson) - ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning - ADMIN: IPAC'15 proceedings finalization; COOL'15 program work - MEIC: Gear-changing summary report contribution; beam-beam model development - ODU/MEIC: Continue bunch-splitting simulations, education with Randy - ODU: NNSA funding proposal development (biweekly telecon) - VACATION: 8/10(pm), 8/12, 8/14(am) Next two weeks (Aug 24-Sep 4) - CEBAF: ORFP editing; BTeam; fopt optics tuning development (w/Eric Thompson); Hall D weekly meeting - ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning (BNL Sep 4-11) - ADMIN: JACoW documentation development (Board of Directors) - MEIC: Continue beam-beam model development - ODU/MEIC: Continue bunch-splitting simulations, education with Randy - ODU: NNSA funding proposal development (biweekly telecon) - FMLA: 08/28
Alex Bogacz
Previous two weeks (Aug 10-21) - NuFact15 (Aug 10-15) - Vacation (Aug 16-21) Next two weeks (Aug 24-Sep 4) - CEBAF: Check M56=0 lattices from Yves for fall run - ER@CEBAF: continue optics longitudinal match, extraction considerations
Dave Douglas
Previous two weeks (Aug 10-21) - MEIC: Wrote up magnetized beam matching note; arc to Chris for space charge simulations; DIMAD model developed to work out dechirp. - Project E: Thinking about compressors in new optics, kibitzing to ASML - ER@CEBAF: Meetings - Other: DOE FWP review for LK Len Next two weeks (Aug 24-Sep 4) - MEIC: Deliver magnetized beam matching note; finish DIMAD model for dechirp; start writing technote on magnetized arc transport design. - LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz chicane); start reconfiguring optis to integrate detector/isotope production. - Project E: Possibly start developing diagnostics lines pending guidance; trip planning for September. - ER@CEBAF: Meetings, start writing on motivation section - Other: PRL Review
Chris Tennant
Previous two weeks (Aug 10-21) - MEIC: magnetized beam transport/matching, including adaption to Tstep and incorporation of Douglas optics for space charge simulation - LERF: Continue FEL lattice to CED/LED with Michele Joyce/Theo - Bubble Chamber: 5D line to elegant, configured zigzag harp scans for 5 MeV region, shifts awaiting measurement opportunities. - ER@CEBAF: Meetings, measurements planning Next two weeks (Aug 24-Sep 4) - MEIC: Continued magnetized beam transport, start technote documentation - LERF: Check FEL lattice in LED - Project E: start evaluating momentum aperture of lattice, Touschek impact, compare to Rui's predictions - Bubble Chamber: run planning for September, guidance for tuning (e.g. small spot size on radiator)
Alex Castilla
Previous two weeks (Aug 10-21) - Dissertation writing - Continue preparations for MEPAS teaching in Nov Next two weeks (Aug 24-Sep 4) - Dissertation writing - Start preparations for MEPAS teaching in Nov
Randy Gamage
Previous two weeks (Aug 10-21) - MEIC: Longitudinal model development Next two weeks (Aug 24-Sep 4) - MEIC: Longitudinal model development