Todd Satogata
Previous two weeks (Aug 21-Sep 4) - CEBAF: StayTreat summary; BTeam/Model; fopt optics tuning (with Eric Thompson); ORFP editing; RSR planning - ER@CEBAF: BBU model development (w/Yue Hao); trip planning - ADMIN: COOL'15 program work; AWP development - MEIC: Coding for longitudinal simulations, ESME installation/learning - ADMIN: JACoW documentation development (Board of Directors) - ODU/MEIC: Continue bunch-splitting simulations, education with Randy - ODU: Finish NNSA funding proposal development (biweekly telecon) - VACATION: Aug 28 Next two weeks (Sep 4-Sep 18) - ER@CEBAF: BNL trip (Sep 4-11) - CEBAF: finish ORFP editing; BTeam/Model; Eric Thompson meetings - MEIC: Continue beam-beam, longitudinal model development - ODU/MEIC: Continue bunch-splitting simulations, education with Randy
Alex Bogacz
Previous two weeks (Aug 21-Sep 4) - Post-meeting followup from NuFact'15, Muon Acceleration paper for workshop - Finished paper "Recent Developments in the LHeC ERL Design and Beam Dynamics Studies" with Dario Pellegrini, submitted to PRST:AB Next two weeks (Sep 4-Sep 18) - JINST paper on "Fundamental Aspects of Muon Beam Acceleration" - Editing JINST chapter "Muon Decay Rings for Short and Long Baseline Neutrino Experiments" - Reviewing PRL paper - MEIC: Work on presentation for MEIC collaboration meeting in early Oct - ER@CEBAF: continue optics longitudinal match, extraction considerations
Dave Douglas
Previous two weeks (Aug 21-Sep 4) - Published magnetized beam matching note/example TN - LERF: Assembling DIMAD deck for IR ERL; investigating ITAR/dual-use impact - ADMIN: Finished PRL review; Finished DOE FWP review - MEIC: Further analysis of CSR emittance growth compensation; example cooler ERL arc to Chris for simulations/space charge evaluation - MEIC: Wrote up magnetized beam matching note; arc to Chris for space charge simulations; DIMAD model developed to work out dechirp. - Project E: Thinking about compressors in new optics, kibitzing to ASML - VACATION: Sep 2-8 Next two weeks (Sep 4-Sep 18) - VACATION: Sep 2-8 - MEIC: Space charge simulation followup, iterating transport optics - Project E: Thinking about compressors in new optics, kibitzing to ASML; trip planning, Eindhoven Sep 21-Oct 3 - ER@CEBAF: Start writing on motivation section
Chris Tennant
Previous two weeks (Aug 21-Sep 4) - Project E: elegant investigations re momentum aperture; BBU simulations and threshold determination for 2-pass up/down new design - MEIC: Continued magnetized beam transport, start technote documentation - LERF: Continue IR lattice to CED/LED with Michele Joyce/Theo - Bubble Chamber: 5D line to elegant, configured zigzag harp scans for 5 MeV region, shifts awaiting measurement opportunities. - ER@CEBAF: Meetings, measurements planning Next two weeks (Sep 4-Sep 18) - Project E: evaluate momentum aperture; continue BBU simulations - MEIC: Continued magnetized beam transport, adding space charge through arcs; continue technote documentation - LERF: Continue IR lattice to CED/LED with Michele Joyce/Theo; start developing training - Bubble Chamber: shifts and analysis - ER@CEBAF: Meetings, measurements planning
Alex Castilla
Previous two weeks (Aug 21-Sep 4) - Dissertation writing Next two weeks (Sep 4-Sep 18) - Dissertation writing - Preparations for MEPAS teaching in Nov
Randy Gamage
Previous two weeks (Aug 21-Sep 4) - MEIC: Longitudinal model development Next two weeks (Sep 4-Sep 18) - MEIC: Longitudinal model development