2016-Jul-08 Accel. Phys. Biweekly Report

From Administrative
Revision as of 14:31, 7 February 2017 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (June 27-July 8) - OPS: StayTreat (Jun 28-30) including talk prep/talk, BTeam - ER@CEBAF: continue next steps (optics coordination...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Todd Satogata

 Previous two weeks (June 27-July 8)
   - OPS: StayTreat (Jun 28-30) including talk prep/talk, BTeam
   - ER@CEBAF: continue next steps (optics coordination with BNL)
   - JLEIC: Document/planning ion injector integration team work
   - ODU/JLEIC: Start ODU presence Thursdays, Fall class prep start
   - REU: Continue work with REU student on emittance error analysis
   - ADMIN: Finish DOE BES proposal funding review
   - JACOW: InDiCo/SPMS project priorities to CERN, telecon
 Next two weeks (July 11-July 22)
   - OPS: BTeam, Hall D fast feedback deck update, RayTrace analysis coding
   - OPS: DarkLight kibitzing/support
   - ER@CEBAF: discuss BNL financial, magnet, labor, optics support
   - ER@CEBAF: prepare PAC presentation (for July 26)
   - JLEIC: Continue injector/interface configuration documentation
   - REU: Continue work with REU student, presentation/paper/poster prep
   - OPS: Start investigation of possible fast ion instability in C100s per StayTreat
   - ODU: Continue Fall PHYS 231 class prep
   - Vacation: July 13-15

Alex Bogacz

 Previous two weeks (June 27-July 8)
   - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
   - OPS: StayTreat (Jun 28-30)
   - LDRD: Develop/present proposal for Booster SC studies
   - ADMIN: Invention disclosures review
 Next two weeks (July 11-July 22)
   - JLEIC: Booster to Collider ring transfer line development, to JEDi
   - PERS: Medical leave (Jul 8-11)
   - ADMIN: Physical Review article review

David Douglas

 Previous two weeks (June 27-July 8)
   - DarkLight: Run preparations
   - JLEIC Cooler: Advise Chris on merger tracking
   - Cbeta: Advise on CSR, trim power supplies, costing
   - ER@CEBAF: meeting, kibitzing
   - Vacation: Jun 30-July 6
 Next two weeks (July 11-July 22)
   - DarkLight: Run preparations
   - ER@CEBAF: meeting, kibitzing
   - Project E: Study on EUV aperture requirements pushed back
      due to DarkLight, likely until post-Labor Day

Ed Nissen

 Previous two weeks (June 27-July 8)
   - OPS: StayTreat (Jun 28-30)
   - JLEIC Beam-Beam: Emit growth vs working point/rigidity studies
   - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
   - JLEIC: Start cluster installation of Synergia (with Yves)
   - Vacation (July 1)
 Next two weeks (July 11-July 22)
   - JLEIC: Continue cluster installation of Synergia (with Yves)
   - JLEIC Beam-beam: Long-term Guinea pig simulations
   - JLEIC Beam-beam: Install COSY infinity to evaluate beam-beam phase space

Chris Tennant

 Previous two weeks (June 27-July 8)
   - JLEIC Cooler: Merger/tracking/S2E development
   - DarkLight: Support LED lattice finalization, checks
   - OPS: StayTreat (Jun 28-30)
   - ADMIN: GBBU simulation advice to Chen Xu of BNL
   - ER@CEBAF: meeting, kibitzing
 Next two weeks (July 11-July 22)
   - Project E: Return to aperture studies (pressure building)
   - DarkLight: Support lattice and engineering run preparations
   - ER@CEBAF: meeting, kibitzing

Randy Gamage

 Previous two weeks (June 27-July 8)
   - JLEIC: Continue bunch splitting simulations
   - JLEIC: Prep/review ODU student seminar (July 14)
 Next two weeks (July 11-July 22)
   - JLEIC: Prep/deliver ODU student seminar (July 14)
   - JLEIC: Writing outlines of initial dissertation chapters
   - JLEIC: Initial esme simulations of debunch/rebunch with impedance