2017-10-16
Jump to navigation
Jump to search
Director - M. Spata
No Report
Accelerator Physics - T. Satogata
Todd Satogata
Previous two weeks (Oct 2-Oct 13) - OPS: BTeam (Oct 3), start ATLis cleanup - OPS: 12 GeV beam parameter meeting, notes to Alex - JLEIC: Prepare talk for BNL collaboration meeting - IPAC18: SPMS support work - JACOW: Team Meeting travel planning, organization - JLEIC: Continue assembling documents, pCDR meetings/planning - HALLD: Help McCaughan prepare slides for GlueX collab meet talk (Oct 12) - JLEIC: Collaboration Meeting (Oct 9-13) - ADMIN: Initiate annual review process - SICK: Oct 5 Next two weeks (Oct 16-Oct 27) - OPS: BTeam (Oct 17), ATLis cleanup, ORFP update review - ADMIN: Peer review NIM paper (overdue) - IPAC18: Editorial board support, SPMS support work - JACOW: Team Meeting travel planning, organization - JLEIC: Continue assembling documents, pCDR meetings/planning - JLEIC: Booster injection scheme work (with Ed) - ADMIN: Weekly meetings with students (Randy, Eric) - ADMIN: Continue annual review process
Alex Bogacz
Previous two weeks (Oct 2-Oct 13) - NUFACT: Write, finish paper for NUFACT'17 proceedings - USPAS: Continue work on lectures for "Practical Accelerator Design" - VACATION: Oct 6-13 Next two weeks (Oct 16-Oct 27) - ADMIN: Peer review PRAB paper, annual review process - OPS: 12 GeV beam parameter meeting, notes - PERLE: End to end simulation development
David Douglas
Previous two weeks (Oct 2-Oct 13) - JLEIC: continue with tilted solenoid: generate transfer matrix (numerical differentiation); start comparing to conventional modeling - JLEIC: continue responding to any results Chris develops on the simple CCR arcs and writing up the simple arc - ADMIN: talks for collaboration meeting, Bonn, and Daresbury - JLEIC: Gave talk on cooler test beds for EIC collaboration meeting Next two weeks (Oct 16-Oct 27) - ADMIN: Bonn travel, annual review process - JLEIC: continue with tilted solenoid: generate transfer matrix (numerical differentiation); start comparing to conventional modeling - JLEIC: continue responding to any results Chris develops on the simple CCR arcs and writing up the simple arc - JLEIC: write up kicker estimates to provide "straight merger" support.
Rui Li
Previous two weeks (Oct 2-Oct 13) - VACATION: Oct 2-3 - JLEIC: Prepare slides on collective effects for EIC collab meet - JLEIC: Collaboration Meeting (Oct 9-13) Next two weeks (Oct 16-Oct 27) - ADMIN: read/edit manuscript for Cheng-Ying - JLEIC: Follow up on collaboration meeting collective effects - JLEIC: Start documenting collective effects in tech note
Ed Nissen
Previous two weeks (Oct 2-Oct 13) - JLEIC: figure out the best way of combatting injection synchrobetatron coupling and hopefully get a good injection simulation going. Reading up on injection methods. - JLEIC: Listening in on EIC collaboration meeting - VACATION: Oct 9 Next two weeks (Oct 16-Oct 27) - JLEIC: Finish injection literature search - JLEIC: Improve injection scheme, coordinate parameters with Todd - VACATION: Oct 20
Chris Tennant
Previous two weeks (Oct 2-Oct 13) - PERLE: microbunching analysis for first full turn of PERLE (it's bad) - ADMIN: read/edit manuscript for Cheng-Ying - CSR: read and work through PRSTAB on CSR published several weeks ago - JLEIC: continue to understand discrepancy between Bmad and other codes - JLEIC: microbunching analysis for multiple turns in CCR - looks good Next two weeks (Oct 16-Oct 27) - JLEIC: (hopefully) model CCR arc in Bmad with CSR shielding - JLEIC: next steps for e-cooler...?
Randy Gamage
Previous two weeks (Oct 2-Oct 13) - Dissertation writing: Continue coasting beam chapter, tech note Next two weeks (Oct 16-Oct 27) - Dissertation writing: Hopefully coasting beam chapter, tech note