2017-02-03
Jump to navigation
Jump to search
Director - M. Spata
No report
Accelerator Physics - T. Satogata
Todd Satogata
Previous two weeks (Jan 23-Feb 3) - USPAS (through Sat Jan 28) - OPS: Hall D run setup, BTeam, optics support - IPAC18: SAB invitations - JLEIC: Collective effects, spreadsheet planning; R&D meet - JLEIC: Start participating in GHOST collaboration meetings - ADMIN: various meetings (Randy, EricT, start reviews) - ADMIN: Student SULI/REU recommendation letters Next two weeks (Feb 6-Feb 17) - JACoW: board of directors telecon - ADMIN: Annual review meetings, CASA group meet - OPS: Hall D run setup/support; BTeam org, beam studies; Optics Feb 7-14 - HALLD: GlueX collaboration meeting (Feb 16-18) - IPAC18: SPC invited talk proposals - JLEIC: 4/3 Gear changing simulations for GHOST paper - JLEIC: Longitudinal simulations, reading impedance papers
Alex Bogacz
Previous two weeks (Jan 23-Feb 3) - Publication survey report (APS publication committee) - Vacation (Jan 4-6) - OPS: Optics on call Jan 31-Feb 7 - PRAB article review Next two weeks (Feb 6-Feb 17) - PERLE: continue lattice re-design, Feb trip/presentation prep - OPS: Optics support, injector match evaluation
David Douglas
Previous two weeks (Jan 23-Feb 3) - JLEIC: Axially symmetric arc optics, tech note development for CCR optics requirements, including initial optimization - JLEIC: Evaluate impacts of emittance exchange, optics transport constraints. Appears underconstrained. - ADMIN: Chen-Ying Tsai recommendation letters Next two weeks (Feb 6-Feb 17) - JLEIC: Finish up emittance exchange, including example; document. - JLEIC: Continue work on CCR arc requirements tech note and arc design. - PERLE: Feb trip/presentation preparation (operations driven I&C)
Ed Nissen
Previous two weeks (Jan 23-Feb 3) - JLEIC: Finished draft of PRSTAB paper on beam-beam calculations, started iterating with Daniel Schulte at CERN - JLEIC: Start working on implementing gear changing script model for Guinea Pig for 4/3 gear changing evaluation - JLEIC: Prepare, present talk on beam-beam calculations at R&D meeting - JLEIC: Started discussions with Todd on Booster injection design Next two weeks (Feb 6-Feb 17) - JLEIC: Continue evaluating/planning Booster injection design - JLEIC: Continue implementing gear changing script model for Guinea Pig for 4/3 gear changing evaluation - JLEIC: Continue writing PRSTAB paper draft on beam-beam sims - Move more boxes into new house
Chris Tennant
Previous two weeks (Jan 23-Feb 3) - JLEIC: studies of a magnetized beam through a non-axisymmetric arc with CSR - JLEIC: simulations of compensating CSR with RF cavity in the CCR - JLEIC: simulations of ERL arc for 2 nC (rather than 420 pC) - JLEIC: summarize previous work done on merger designs for ERL Next two weeks (Feb 6-Feb 17) - JLEIC: more cooler work (direction of which will depend on action items generated at next cooler meeting) - JLEIC: simulate emittance measurements of multi-component beams
Randy Gamage
Previous two weeks (Jan 23-Feb 3) - USPAS: TA for Accelerator Physics course (Jan 15-28) - JLEIC: Develop BLonD simulations of debunch/rebunch with impedance - JLEIC: Continue writing outlines of initial dissertation chapters Next two weeks (Feb 6-Feb 17) - JLEIC: Continue BLonD simulations of debunch/rebunch with impedance - JLEIC: Longitudinal impedance reading
Accelerator R and D - Y. Zhang
Computational Physics - Y. Roblin
Diagnostic Development - K. Jordan