Difference between revisions of "2015-06-12 Accelerator Physics Report"

From Administrative
Jump to navigation Jump to search
Line 45: Line 45:
 
<li>Thesis writing (AC)
 
<li>Thesis writing (AC)
 
</ul>
 
</ul>
 +
  
 
Travel/vacation<br>
 
Travel/vacation<br>

Revision as of 16:07, 20 July 2015

CASA Accelerator Physics
Bi-Weeklly Report - due 06-12-2015
Submitted by: Todd Satogata


Here is the biweekly report from Physics. I use initials for group members as usual: AB=Alex Bogacz, DD=Dave Douglas, CT=Chris Tennant, AC=Alex Castilla, RG=Randy Gamage, TS=Todd Satogata. A lot of group time is involved in the ERL and IEB workshops in this period. I'll chat with Yves separately about whether more work is needed from Chris on the CSR experiment LDRD over the next month.

Previous two weeks (May 29-Jun 12) CEBAF / Operations

  • LOC meetings/planning for mid-July StayTreat (TS)
  • Administrate RSR, BTeam (TS)
  • Finished/circulated emittance contributed talk paper (TS)
  • UITF reengagement (AB)


Project E/Darklight

  • Darklight collaboration meeting 6/4-5 (DD,CT)
  • Lattice hypersensitivity to alpha evaluation (DD, CT)
  • Calculated flat beam/magnetized beam transforms (DD)
  • Aperture studies for Project E lattice (CT)


MEIC

  • Calculations of coasting beam stability needs (TS)
  • Develop bunch splitting simulations, IPAC15 followup (RG, TS)
  • Nonlinear crabbing simulation planning (AC, TS)
  • Synergia compilation for Booster injection sims (TS, AB)
  • Lattice s2e setup (CT)


LDRD

  • No progress (microbunching info from CT in hands of Rui/Yves)
  • Community service/training/other
  • Prepare LHeC talk for ERL workshop (AB)
  • Summer lecture series: intro to accelerators, 6/9 (TS)
  • IPAC15 proceedings finalization (TS)
  • JACoW annual team meeting planning (TS)
  • Thesis writing (AC)


Travel/vacation

  • DD: vacation 5/29-6/3
  • TS: partial FMLA 6/5-8
  • CT/AB: ERL Workshop 6/8-12 (BNL/Stony Brook)