Difference between revisions of "2015-06-26 Accelerator Physics Report"

From Administrative
Jump to navigation Jump to search
Line 1: Line 1:
 
CASA Accelerator Physics<br>
 
CASA Accelerator Physics<br>
Bi-Weekly Report - 06-12-2015 to 06-26-2015
+
Bi-Weekly Report - 06-12-2015 to 06-26-2015<br>
Submitted by: Todd Satogata
+
Submitted by: Todd Satogata<br>
 +
 
  
 
CEBAF / Operations<br>
 
CEBAF / Operations<br>

Revision as of 16:12, 20 July 2015

CASA Accelerator Physics
Bi-Weekly Report - 06-12-2015 to 06-26-2015
Submitted by: Todd Satogata


CEBAF / Operations

  • Optics analysis, preparation for StayTreat (TS)
  • Evaluate Hall D optics feedback status (TS)
  • Evaluate quad centering with data from test archiver (TS)
  • Administrate RSR, BTeam (TS)
  • UITF reengagement (AB)
  • Project E/Darklight
  • Continued halo, aperture analysis (DD, CT)
  • Document flat beam/magnetized beam transforms (DD)
  • Use Cheng-Ying's code for microbunching gain calculation for Project E (CT)


MEIC

  • Develop bunch splitting simulations, IPAC15 followup (TS, RG)
  • Continue nonlinear crabbing simulation planning, implementation (AC, TS)
  • Cooler re-engagement, lattice resurrection (DD, CT)
  • Lattice s2e setup, including magnetization (CT with input from DD)
  • Begin transverse parameter scans for cooler linac (CT)
  • Community service/training/other
  • Work on overdue NIM/PR reviews (DD)
  • Thesis writing (AC) ODU reengagement with NNSA proposal team (TS)


Travel/vacation

  • DD/CT: IEB Workshop 6/16-19 (Cornell)
  • AB: vacation 6/16-7/29 (note long vacation)
  • TS: vacation 6/16, 6/24-25
  • CT: vacation 6/29-7/3 (beyond two-week horizon but worth mentioning)