2015-07-24 Diagnostic Development Biweekly Report

From Administrative
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

CASA Diagnostic Development
Biweekly Report: 07/11/15 - 07/24/15
Submitted by: Pavel Evtushenko


M. Tiefenback

  • finished the paper review
  • participated in the second meeting on CEBAF 5-pass ERL, received an assignment for diagnostic and measurement integration for this exploratory task
  • continuing engagement with turning the multi-pass steering procedure into an operational tool
  • continuing engagement with hot-wire anemometer mass-flow meter
  • has spent about a day reviewing the ops stay-treat materials and the questions Arne is asking, trying to offer a useful analysis of what was good or not and what should be repeated or altered
  • About 2.5 days of personal leave time the past week


P. Evtushenko

  • prepared talk for the S&T review and presented it at the dry run
  • has completed plan of finishing the early career grant work;
  • this includes al tasks, personal required for the work, procurement and labor plan
  • works on various ongoing aspects of the early career grant
  • large fraction of it - discussions with potential manufacturers of system components
  • reviewed several revisions of the setup at 1C12 for transverse beam profile measurements
  • with a combination of SR and OTR; the last revision is declared final
  • reviewed and made several revisions of Hall-C "24-inch BPM" - converging to final design


K. Jordan

  • Travel