Difference between revisions of "2015-08-21 Accelerator Physics Biweekly Report"

From Administrative
Jump to navigation Jump to search
Line 32: Line 32:
  
 
Alex Bogacz
 
Alex Bogacz
 +
<ul>
 
Previous two weeks (Aug 10-21)
 
Previous two weeks (Aug 10-21)
NuFact15 (Aug 10-15)
+
</ul>
Vacation (Aug 16-21)
+
<ul>
 +
<li>NuFact15 (Aug 10-15)
 +
<li>Vacation (Aug 16-21)
 +
</ul>
 +
<ul>
 
Next two weeks (Aug 24-Sep 4)
 
Next two weeks (Aug 24-Sep 4)
CEBAF: Check M56=0 lattices from Yves for fall run
+
</ul>
ER@CEBAF: continue optics longitudinal match, extraction considerations
+
<li>CEBAF: Check M56=0 lattices from Yves for fall run
 +
<li>ER@CEBAF: continue optics longitudinal match, extraction considerations
  
 
Dave Douglas
 
Dave Douglas

Revision as of 13:46, 24 August 2015

CASA Accelerator Physics
Biweekly Report: 08/08/15 - 08/21/15
Sbmitted by: Todd Satogata


Todd Satogata

    Previous two weeks (Aug 10-21)
  • CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam; fopt optics tuning development (w/Eric Thompson)
  • ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning
  • ADMIN: IPAC'15 proceedings finalization; COOL'15 program work
  • MEIC: Gear-changing summary report contribution; beam-beam model development
  • ODU/MEIC: Continue bunch-splitting simulations, education with Randy
  • ODU: NNSA funding proposal development (biweekly telecon)
  • VACATION: 8/10(pm), 8/12, 8/14(am)
    Next two weeks (Aug 24-Sep 4)
  • CEBAF: ORFP editing; BTeam; fopt optics tuning development (w/Eric Thompson); Hall D weekly meeting
  • ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning (BNL Sep 4-11)
  • ADMIN: JACoW documentation development (Board of Directors)
  • MEIC: Continue beam-beam model development
  • ODU/MEIC: Continue bunch-splitting simulations, education with Randy
  • ODU: NNSA funding proposal development (biweekly telecon)
  • FMLA: 08/28


Alex Bogacz

    Previous two weeks (Aug 10-21)
  • NuFact15 (Aug 10-15)
  • Vacation (Aug 16-21)
    Next two weeks (Aug 24-Sep 4)
  • CEBAF: Check M56=0 lattices from Yves for fall run
  • ER@CEBAF: continue optics longitudinal match, extraction considerations Dave Douglas Previous two weeks (Aug 10-21) MEIC: Wrote up magnetized beam matching note; arc to Chris for space charge simulations; DIMAD model developed to work out dechirp. Project E: Thinking about compressors in new optics, kibitzing to ASML ER@CEBAF: Meetings Other: DOE FWP review for LK Len Next two weeks (Aug 24-Sep 4) MEIC: Deliver magnetized beam matching note; finish DIMAD model for dechirp; start writing technote on magnetized arc transport design. LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz chicane); start reconfiguring optis to integrate detector/isotope production. Project E: Possibly start developing diagnostics lines pending guidance; trip planning for September. ER@CEBAF: Meetings, start writing on motivation section Other: PRL Review Chris Tennant Previous two weeks (Aug 10-21) MEIC: magnetized beam transport/matching, including adaption to Tstep and incorporation of Douglas optics for space charge simulation LERF: Continue FEL lattice to CED/LED with Michele Joyce/Theo Bubble Chamber: 5D line to elegant, configured zigzag harp scans for 5 MeV region, shifts awaiting measurement opportunities. ER@CEBAF: Meetings, measurements planning Next two weeks (Aug 24-Sep 4) MEIC: Continued magnetized beam transport, start technote documentation LERF: Check FEL lattice in LED Project E: start evaluating momentum aperture of lattice, Touschek impact, compare to Rui's predictions Bubble Chamber: run planning for September, guidance for tuning (e.g. small spot size on radiator) Alex Castilla Previous two weeks (Aug 10-21) Dissertation writing Continue preparations for MEPAS teaching in Nov Next two weeks (Aug 24-Sep 4) Dissertation writing Start preparations for MEPAS teaching in Nov Randy Gamage Previous two weeks (Aug 10-21) MEIC: Longitudinal model development Next two weeks (Aug 24-Sep 4) MEIC: Longitudinal model development CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam; fopt optics tuning development (w/Eric Thompson) ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning ADMIN: IPAC'15 proceedings finalization; COOL'15 program work MEIC: Gear-changing summary report contribution; beam-beam model development ODU/MEIC: Continue bunch-splitting simulations, education with Randy ODU: NNSA funding proposal development (biweekly telecon) VACATION: 8/10(pm), 8/12, 8/14(am) Next two weeks (Aug 24-Sep 4) CEBAF: ORFP editing; BTeam; fopt optics tuning development (w/Eric Thompson); Hall D weekly meeting ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning (BNL Sep 4-11) ADMIN: JACoW documentation development (Board of Directors) MEIC: Continue beam-beam model development ODU/MEIC: Continue bunch-splitting simulations, education with Randy ODU: NNSA funding proposal development (biweekly telecon) FMLA: 08/28 Alex Bogacz Previous two weeks (Aug 10-21) NuFact15 (Aug 10-15) Vacation (Aug 16-21) Next two weeks (Aug 24-Sep 4) CEBAF: Check M56=0 lattices from Yves for fall run ER@CEBAF: continue optics longitudinal match, extraction considerations Dave Douglas Previous two weeks (Aug 10-21) MEIC: Wrote up magnetized beam matching note; arc to Chris for space charge simulations; DIMAD model developed to work out dechirp. Project E: Thinking about compressors in new optics, kibitzing to ASML ER@CEBAF: Meetings Other: DOE FWP review for LK Len Next two weeks (Aug 24-Sep 4) MEIC: Deliver magnetized beam matching note; finish DIMAD model for dechirp; start writing technote on magnetized arc transport design. LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz chicane); start reconfiguring optis to integrate detector/isotope production. Project E: Possibly start developing diagnostics lines pending guidance; trip planning for September. ER@CEBAF: Meetings, start writing on motivation section Other: PRL Review Chris Tennant Previous two weeks (Aug 10-21) MEIC: magnetized beam transport/matching, including adaption to Tstep and incorporation of Douglas optics for space charge simulation LERF: Continue FEL lattice to CED/LED with Michele Joyce/Theo Bubble Chamber: 5D line to elegant, configured zigzag harp scans for 5 MeV region, shifts awaiting measurement opportunities. ER@CEBAF: Meetings, measurements planning Next two weeks (Aug 24-Sep 4) MEIC: Continued magnetized beam transport, start technote documentation LERF: Check FEL lattice in LED Project E: start evaluating momentum aperture of lattice, Touschek impact, compare to Rui's predictions Bubble Chamber: run planning for September, guidance for tuning (e.g. small spot size on radiator) Alex Castilla Previous two weeks (Aug 10-21) Dissertation writing Continue preparations for MEPAS teaching in Nov Next two weeks (Aug 24-Sep 4) Dissertation writing Start preparations for MEPAS teaching in Nov Randy Gamage Previous two weeks (Aug 10-21) MEIC: Longitudinal model development Next two weeks (Aug 24-Sep 4) MEIC: Longitudinal model development