2015-10-24 to 2015-11-06 Computational Physics Biweekly Report

From Administrative
Revision as of 16:42, 12 November 2015 by Anichols (talk | contribs) (Created page with "Yves: +working on Optics for CEBAF restart - optics for 6 pass run - optics for gradient calibration - debugging CED scripts used to load optics (with AHLA) + pr...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Yves:

+working on Optics for CEBAF restart
  - optics for 6 pass run
  - optics for gradient calibration
  - debugging CED  scripts used to load optics (with AHLA)
+ prepared and then gave a seminar at ODU on
  "computational beam physics challenges for MEIC"
+ submitted a proposal to DOE for NET2025 with Amber Boehlen

+ conducted interviews for position 11602. Offer has been made as of last Friday.


He:

Working on cooling LDRD