https://wiki.jlab.org/casa-adminwiki/index.php?title=2015-Aug-21_Accel._Phys._Biweekly_Report&feed=atom&action=history
2015-Aug-21 Accel. Phys. Biweekly Report - Revision history
2024-03-29T02:08:51Z
Revision history for this page on the wiki
MediaWiki 1.35.7
https://wiki.jlab.org/casa-adminwiki/index.php?title=2015-Aug-21_Accel._Phys._Biweekly_Report&diff=411&oldid=prev
Anichols: Created page with "Todd Satogata Previous two weeks (Aug 10-21) - CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam; fopt optics tuning development (w/Eric T..."
2017-02-07T19:18:51Z
<p>Created page with "Todd Satogata Previous two weeks (Aug 10-21) - CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam; fopt optics tuning development (w/Eric T..."</p>
<p><b>New page</b></p><div>Todd Satogata<br />
<br />
Previous two weeks (Aug 10-21)<br />
- CEBAF: Hall D FFB evaluation; BPM data analysis (w/Alexandre Deur); BTeam;<br />
fopt optics tuning development (w/Eric Thompson)<br />
- ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip planning<br />
- ADMIN: IPAC'15 proceedings finalization; COOL'15 program work<br />
- MEIC: Gear-changing summary report contribution; beam-beam model development<br />
- ODU/MEIC: Continue bunch-splitting simulations, education with Randy<br />
- ODU: NNSA funding proposal development (biweekly telecon)<br />
- VACATION: 8/10(pm), 8/12, 8/14(am)<br />
Next two weeks (Aug 24-Sep 4)<br />
- CEBAF: ORFP editing; BTeam; fopt optics tuning development (w/Eric<br />
Thompson); Hall D weekly meeting<br />
- ER@CEBAF: biweekly meeting; BBU model development (w/Yue Hao); trip<br />
planning (BNL Sep 4-11)<br />
- ADMIN: JACoW documentation development (Board of Directors)<br />
- MEIC: Continue beam-beam model development<br />
- ODU/MEIC: Continue bunch-splitting simulations, education with Randy<br />
- ODU: NNSA funding proposal development (biweekly telecon)<br />
- FMLA: 08/28<br />
<br />
Alex Bogacz<br />
<br />
Previous two weeks (Aug 10-21)<br />
- NuFact15 (Aug 10-15)<br />
- Vacation (Aug 16-21)<br />
Next two weeks (Aug 24-Sep 4)<br />
- CEBAF: Check M56=0 lattices from Yves for fall run<br />
- ER@CEBAF: continue optics longitudinal match, extraction considerations<br />
<br />
Dave Douglas<br />
<br />
Previous two weeks (Aug 10-21)<br />
- MEIC: Wrote up magnetized beam matching note; arc to Chris for space<br />
charge simulations; DIMAD model developed to work out dechirp.<br />
- Project E: Thinking about compressors in new optics, kibitzing to ASML<br />
- ER@CEBAF: Meetings<br />
- Other: DOE FWP review for LK Len<br />
Next two weeks (Aug 24-Sep 4)<br />
- MEIC: Deliver magnetized beam matching note; finish DIMAD model for<br />
dechirp; start writing technote on magnetized arc transport design.<br />
- LERF: Clean up DIMAD deck for IR region (remove W55 wiggler and THz<br />
chicane); start reconfiguring optis to integrate detector/isotope<br />
production.<br />
- Project E: Possibly start developing diagnostics lines pending<br />
guidance; trip planning for September.<br />
- ER@CEBAF: Meetings, start writing on motivation section<br />
- Other: PRL Review<br />
<br />
Chris Tennant<br />
<br />
Previous two weeks (Aug 10-21)<br />
- MEIC: magnetized beam transport/matching, including adaption to Tstep and<br />
incorporation of Douglas optics for space charge simulation<br />
- LERF: Continue FEL lattice to CED/LED with Michele Joyce/Theo<br />
- Bubble Chamber: 5D line to elegant, configured zigzag harp scans for<br />
5 MeV region, shifts awaiting measurement opportunities.<br />
- ER@CEBAF: Meetings, measurements planning<br />
Next two weeks (Aug 24-Sep 4)<br />
- MEIC: Continued magnetized beam transport, start technote documentation<br />
- LERF: Check FEL lattice in LED<br />
- Project E: start evaluating momentum aperture of lattice, Touschek impact,<br />
compare to Rui's predictions<br />
- Bubble Chamber: run planning for September, guidance for tuning (e.g.<br />
small spot size on radiator)<br />
<br />
Alex Castilla<br />
<br />
Previous two weeks (Aug 10-21)<br />
- Dissertation writing<br />
- Continue preparations for MEPAS teaching in Nov<br />
Next two weeks (Aug 24-Sep 4)<br />
- Dissertation writing<br />
- Start preparations for MEPAS teaching in Nov<br />
<br />
Randy Gamage<br />
<br />
Previous two weeks (Aug 10-21)<br />
- MEIC: Longitudinal model development<br />
Next two weeks (Aug 24-Sep 4)<br />
- MEIC: Longitudinal model development</div>
Anichols