2015-Jun-15 Comp. Phys. Biweekly Report

From Administrative
Revision as of 15:15, 20 July 2016 by Anichols (talk | contribs) (Created page with "Yves Roblin *Worked on sidereal variation proposal to produce slides. *PQB work regarding what we install in Hall A (with M. Pitt et al) *Parallelizing the Fast multipole sche...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Yves Roblin

  • Worked on sidereal variation proposal to produce slides.
  • PQB work regarding what we install in Hall A (with M. Pitt et al)
  • Parallelizing the Fast multipole scheme for cooling calculations. Started investigating whether PADAs (http://padas.ices.utexas.edu/software/ ) would be adequate for our needs (Yves, He)
  • CSR LDRD:
    • producing a labor profile for COB june 17 for Fulvia.
    • Fay Hannon has a preliminary estimate of the "option A" injector. We are going to discuss it next meeting.


He

  • Working on bunched cooling LDRD
  • River Huang is now full time on the SLAC field emission problem in waveguides.