2015-Sep-04 Biweekly Report

From Administrative
Revision as of 16:12, 19 July 2016 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (Aug 21-Sep 4) - CEBAF: StayTreat summary; BTeam/Model; fopt optics tuning (with Eric Thompson); ORFP editing; RSR planning...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

  Previous two weeks (Aug 21-Sep 4)
    - CEBAF: StayTreat summary; BTeam/Model; fopt optics tuning (with Eric Thompson);
      ORFP editing; RSR planning
    - ER@CEBAF: BBU model development (w/Yue Hao); trip planning
    - ADMIN: COOL'15 program work; AWP development
    - MEIC: Coding for longitudinal simulations, ESME installation/learning
    - ADMIN: JACoW documentation development (Board of Directors)
    - ODU/MEIC: Continue bunch-splitting simulations, education with Randy
    - ODU: Finish NNSA funding proposal development (biweekly telecon)
    - VACATION: Aug 28
  Next two weeks (Sep 4-Sep 18)
    - ER@CEBAF: BNL trip (Sep 4-11)
    - CEBAF: finish ORFP editing; BTeam/Model; Eric Thompson meetings
    - MEIC: Continue beam-beam, longitudinal model development
    - ODU/MEIC: Continue bunch-splitting simulations, education with Randy

Alex Bogacz

  Previous two weeks (Aug 21-Sep 4)
    - Post-meeting followup from NuFact'15, Muon Acceleration paper for workshop
    - Finished paper "Recent Developments in the LHeC ERL Design and Beam
      Dynamics Studies" with Dario Pellegrini, submitted to PRST:AB
  Next two weeks (Sep 4-Sep 18)
    - JINST paper on "Fundamental Aspects of Muon Beam Acceleration"
    - Editing JINST chapter "Muon Decay Rings for Short and Long Baseline
      Neutrino Experiments"
    - Reviewing PRL paper
    - MEIC: Work on presentation for MEIC collaboration meeting in early Oct
    - ER@CEBAF: continue optics longitudinal match, extraction considerations

Dave Douglas

  Previous two weeks (Aug 21-Sep 4)
    - Published magnetized beam matching note/example TN
    - LERF: Assembling DIMAD deck for IR ERL; investigating ITAR/dual-use impact
    - ADMIN: Finished PRL review; Finished DOE FWP review
    - MEIC: Further analysis of CSR emittance growth compensation; example cooler
      ERL arc to Chris for simulations/space charge evaluation
    - MEIC: Wrote up magnetized beam matching note; arc to Chris for space
      charge simulations; DIMAD model developed to work out dechirp.
    - Project E: Thinking about compressors in new optics, kibitzing to ASML
    - VACATION: Sep 2-8
  Next two weeks (Sep 4-Sep 18)
    - VACATION: Sep 2-8
    - MEIC: Space charge simulation followup, iterating transport optics
    - Project E: Thinking about compressors in new optics, kibitzing to ASML;
      trip planning, Eindhoven Sep 21-Oct 3
    - ER@CEBAF: Start writing on motivation section

Chris Tennant

  Previous two weeks (Aug 21-Sep 4)
    - Project E: elegant investigations re momentum aperture; BBU simulations
      and threshold determination for 2-pass up/down new design
    - MEIC: Continued magnetized beam transport, start technote documentation
    - LERF: Continue IR lattice to CED/LED with Michele Joyce/Theo
    - Bubble Chamber: 5D line to elegant, configured zigzag harp scans for
      5 MeV region, shifts awaiting measurement opportunities.
    - ER@CEBAF: Meetings, measurements planning
  Next two weeks (Sep 4-Sep 18)
    - Project E: evaluate momentum aperture; continue BBU simulations
    - MEIC: Continued magnetized beam transport, adding space charge through arcs;
      continue technote documentation
    - LERF: Continue IR lattice to CED/LED with Michele Joyce/Theo; start
      developing training
    - Bubble Chamber: shifts and analysis
    - ER@CEBAF: Meetings, measurements planning

Alex Castilla

  Previous two weeks (Aug 21-Sep 4)
    - Dissertation writing
  Next two weeks (Sep 4-Sep 18)
    - Dissertation writing
    - Preparations for MEPAS teaching in Nov

Randy Gamage

  Previous two weeks (Aug 21-Sep 4)
    - MEIC: Longitudinal model development
  Next two weeks (Sep 4-Sep 18)
    - MEIC: Longitudinal model development