2015-Sep-18 Accel. Phys. Biweekly Report

From Administrative
Revision as of 15:20, 7 February 2017 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (Sep 4-Sep 18) - ER@CEBAF: BNL trip (Sep 4-11), biweekly meeting org - COOL15: Organizing abstracts, poster session - ODU/MEIC:...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

 Previous two weeks (Sep 4-Sep 18)
   - ER@CEBAF: BNL trip (Sep 4-11), biweekly meeting org
   - COOL15: Organizing abstracts, poster session
   - ODU/MEIC: Continue bunch-splitting simulations, education with Randy
   - JACOW: IPAC'17 advice, team meeting organization
   - OPS: Eric Thompson Java/eclipse compiler resolution, elegant optics training
   - OPS: ORFP edits near finalized; BTeam/Model meeting; prep for Ops training
   - ADMIN: Group meeting, AWP development
 Next two weeks (Sep 18-Oct 2)
   - OPS: Ops training, run planning, RSR AWP administration
   - OPS: HallD FFB meeting, beam transport evaluation planning
   - OPS: Preparations for Hall D collaboration meeting Oct 8-10
   - COOL15: Final preparations, workshop participation/editing/support
   - ODU/MEIC: Continue bunch-splitting simulations, education with Randy
   - MEIC: Preparations for Collaboration meeting Oct 5-7
   - ER@CEBAF: Document BNL visit, meeting notes, coordinate optics work
   - JACoW: Preparations for Board of Directors Telecon Oct 9

Alex Bogacz

 Previous two weeks (Sep 4-Sep 18)
   - 'Muon Acceleration' paper for JINST
   - Editing chapter on 'Long and short baseline neutrino decay rings' JINST
   - Multi-pass optics  for ER@CEBAF
 Next two weeks (Sep 18-Oct 2)
   - Optimizing MEIC Ion booster lattice
   - Transverse matching for ER@CEBAF
   - Path-length delay chicanes for ER@CEBAF

Dave Douglas

 Previous two weeks (Sep 4-Sep 18)
   - VACATION: Sep 2-8
   - MEIC: Space charge simulation followup, iterating transport optics
   - MEIC/Project E: Thinking about compressors in new optics (emittance compensated
     high energy compressors), kibitzing to ASML; trip planning
   - LERF: Working through Darklight decks
 Next two weeks (Sep 18-Oct 2)
   - Project E: Eindhoven trip Sep 21-Oct 3

Chris Tennant

 Previous two weeks (Sep 4-Sep 18)
   - OPS: Bubble chamber 0L02 twiss as function of energy, generating
     elegant model, lookup table of optics vs beam energy; qualitatively
     self-consistent
   - MEIC/Project E: Learned how to generate momentum aperture for machine
     with elegant (with M. Borland input)
   - MEIC: Lots of time puzzling over magnetized beam tracking results
     in elegant/Tstep. Working towards cathode through cooling solenoid
     simulation in elegant (no space charge)
 Next two weeks (Sep 18-Oct 2)
   - Compute momentum aperture for newest lattice from ASML.
   - Continue with cooler simulations - try to make progress in advance of COOL15.
   - VACATION: 9/28-10/9.

Alex Castilla

 Previous two weeks (Sep 4-Sep 18)
   - Dissertation writing
   - Preparations for MEPAS teaching in Nov
 Next two weeks (Sep 18-Oct 2)
   - Dissertation writing
   - Preparations for MEPAS teaching in Nov

Randy Gamage

 Previous two weeks (Sep 4-Sep 18)
   - MEIC: Longitudinal model development
 Next two weeks (Sep 18-Oct 2)
   - MEIC: Longitudinal model development, starting bunch merge/split simulations