2016-Feb-22 Accel. Phys. Biweekly Report

From Administrative
Revision as of 15:23, 7 February 2017 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (Feb 1-15) - OPS: Hall D startup, transport measurements, FFB support, Optics on call - OPS: Harp scaling issues, emittance charact...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

 Previous two weeks (Feb 1-15)
   - OPS: Hall D startup, transport measurements, FFB support, Optics on call
   - OPS: Harp scaling issues, emittance characterization
   - ER@CEBAF: Francois Meot/Nick Tsoupas visit, discussions
   - JACoW: Board of Directors meeting
   - Accelerator Advisory Committee Review prep
   - GlueX/HallD Collaboration Meeting prep
   - Vacation Feb 10-15
 Next two weeks (Feb 16-Mar 1)
   - Accelerator Advisory Committee Review/Talk (Feb 17-18)
   - GlueX/HallD Collaboration Meeting/Talk (Feb 18-20)
   - ER@CEBAF: biweekly meeting org, proposal writing
   - OPS: BTeam, tune team prep, Hall D optics fitting/tuning, nA BPM calibration
   - JLEIC: Simulation workload discussions with Yves
   - JACoW: Finish COOL'15 talk processing, publish to JACoW; template work
   - Finalize review ODU/JLab paper on GHOST to prepare for publication
   - JLEIC/ODU: Bunch splitting development with Randy
   - OPS: Eric Thompson, education on functional minimization for fopt fits

Alex Bogacz

 Previous two weeks (Feb 1-15)
   - JLEIC: Develop new Booster lattice with imaginary gamma-T
   - OPS: Optics on call
   - Vacation Jan 25-Feb 4
 Next two weeks (Feb 16-Mar 1)
   - JLEIC: Optimize booster lattice: chromatic compensation, occupancy
   - ER@CEBAF: Iterate chicane layout (with Chase Dubbe)
   - Review JINST article

David Douglas

 Previous two weeks (Feb 1-15)
   - CBETA: travelled to Cornell to discuss C-Beta, gave seminar on ERLs
   - JLEIC: continue sorting out magnetized beam dynamics in cooling solenoid
   - JLEIC: collaborate on re-optimization of design specifications
   - DarkLight: revise DarkLight simulations to eliminate incorrectly
     included solenoid fringe field effects
   - Project E: meetings; complete sensitivity & halo generation study
 Next two weeks (Feb 16-Mar 1)
   - JLEIC: continue sorting out magnetized beam dynamics in cooling solenoid
   - CBETA: Cornell visit followup
   - ER@CEBAF telecon/kibitzing
   - Project E: informal support for commissioning
   - Project E: analysis of quad perturbation hypersensitivity
     observed in halo maps
   - Complete NSF proposal with MSU/ODU

Chris Tennant

 Previous two weeks (Feb 1-15)
   Project E: BBU analysis using HOM data for 6-cell (vs 5-cell) cavity
   Project E: geometric analysis for the UV line of the JLab FEL (to compare with
      results for lattice 3.0)
   Project E: halo map analysis (revisiting) for lattice 3.0
   Project E: simulate Touschek scattering in elegant
   Project E: troubleshooting/benchmarking new version of Cheng-Ying's Vlasov solver
   Project E: simulating phase transfer measurement in lattice 3.0
   Cooler: linac acceptance studies using the appropriate (i.e. large) beam
 Next two weeks (Feb 16-Mar 1)
   Project E: microbunching gain analysis for lattice 2.1 (using new version of
      Cheng-Ying's code)
   Project E: analyze/understand Touschek scattering data from elegant
      and write up conclusions from aforementioned analysis
   Cooler: S2E simulations using several different drift emittances

Randy Gamage

 Previous three weeks (Jan 4-25)
   - MEIC: esme model development, bunch split optimization
 Next two weeks (Jan 25-Feb 5)
   - MEIC: esme model development, bunch split optimization