2016-Jul-08 Biweekly Report

From Administrative
Revision as of 15:48, 19 July 2016 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (June 27-July 8) - OPS: StayTreat (Jun 28-30) including talk prep/talk, BTeam - ER@CEBAF: continue next steps (optics coordinatio...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Todd Satogata

  Previous two weeks (June 27-July 8)
    - OPS: StayTreat (Jun 28-30) including talk prep/talk, BTeam
    - ER@CEBAF: continue next steps (optics coordination with BNL)
    - JLEIC: Document/planning ion injector integration team work
    - ODU/JLEIC: Start ODU presence Thursdays, Fall class prep start
    - REU: Continue work with REU student on emittance error analysis
    - ADMIN: Finish DOE BES proposal funding review
    - JACOW: InDiCo/SPMS project priorities to CERN, telecon
  Next two weeks (July 11-July 22)
    - OPS: BTeam, Hall D fast feedback deck update, RayTrace analysis coding
    - OPS: DarkLight kibitzing/support
    - ER@CEBAF: discuss BNL financial, magnet, labor, optics support
    - ER@CEBAF: prepare PAC presentation (for July 26)
    - JLEIC: Continue injector/interface configuration documentation
    - REU: Continue work with REU student, presentation/paper/poster prep
    - OPS: Start investigation of possible fast ion instability in C100s per StayTreat
    - ODU: Continue Fall PHYS 231 class prep
    - Vacation: July 13-15

Alex Bogacz

  Previous two weeks (June 27-July 8)
    - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
    - OPS: StayTreat (Jun 28-30)
    - LDRD: Develop/present proposal for Booster SC studies
    - ADMIN: Invention disclosures review
  Next two weeks (July 11-July 22)
    - JLEIC: Booster to Collider ring transfer line development, to JEDi
    - PERS: Medical leave (Jul 8-11)
    - ADMIN: Physical Review article review

David Douglas

  Previous two weeks (June 27-July 8)
    - DarkLight: Run preparations
    - JLEIC Cooler: Advise Chris on merger tracking
    - Cbeta: Advise on CSR, trim power supplies, costing
    - ER@CEBAF: meeting, kibitzing
    - Vacation: Jun 30-July 6
  Next two weeks (July 11-July 22)
    - DarkLight: Run preparations
    - ER@CEBAF: meeting, kibitzing
    - Project E: Study on EUV aperture requirements pushed back
       due to DarkLight, likely until post-Labor Day

Ed Nissen

  Previous two weeks (June 27-July 8)
    - OPS: StayTreat (Jun 28-30)
    - JLEIC Beam-Beam: Emit growth vs working point/rigidity studies
    - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
    - JLEIC: Start cluster installation of Synergia (with Yves)
    - Vacation (July 1)
  Next two weeks (July 11-July 22)
    - JLEIC: Continue cluster installation of Synergia (with Yves)
    - JLEIC Beam-beam: Long-term Guinea pig simulations
    - JLEIC Beam-beam: Install COSY infinity to evaluate beam-beam phase space

Chris Tennant

  Previous two weeks (June 27-July 8)
    - JLEIC Cooler: Merger/tracking/S2E development
    - DarkLight: Support LED lattice finalization, checks
    - OPS: StayTreat (Jun 28-30)
    - ADMIN: GBBU simulation advice to Chen Xu of BNL
    - ER@CEBAF: meeting, kibitzing
  Next two weeks (July 11-July 22)
    - Project E: Return to aperture studies (pressure building)
    - DarkLight: Support lattice and engineering run preparations
    - ER@CEBAF: meeting, kibitzing

Randy Gamage

  Previous two weeks (June 27-July 8)
    - JLEIC: Continue bunch splitting simulations
    - JLEIC: Prep/review ODU student seminar (July 14)
  Next two weeks (July 11-July 22)
    - JLEIC: Prep/deliver ODU student seminar (July 14)
    - JLEIC: Writing outlines of initial dissertation chapters
    - JLEIC: Initial esme simulations of debunch/rebunch with impedance