2016-Jul-08 Biweekly Report

From Administrative
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

  Previous two weeks (June 27-July 8)
    - OPS: StayTreat (Jun 28-30) including talk prep/talk, BTeam
    - ER@CEBAF: continue next steps (optics coordination with BNL)
    - JLEIC: Document/planning ion injector integration team work
    - ODU/JLEIC: Start ODU presence Thursdays, Fall class prep start
    - REU: Continue work with REU student on emittance error analysis
    - ADMIN: Finish DOE BES proposal funding review
    - JACOW: InDiCo/SPMS project priorities to CERN, telecon
  Next two weeks (July 11-July 22)
    - OPS: BTeam, Hall D fast feedback deck update, RayTrace analysis coding
    - OPS: DarkLight kibitzing/support
    - ER@CEBAF: discuss BNL financial, magnet, labor, optics support
    - ER@CEBAF: prepare PAC presentation (for July 26)
    - JLEIC: Continue injector/interface configuration documentation
    - REU: Continue work with REU student, presentation/paper/poster prep
    - OPS: Start investigation of possible fast ion instability in C100s per StayTreat
    - ODU: Continue Fall PHYS 231 class prep
    - Vacation: July 13-15

Alex Bogacz

  Previous two weeks (June 27-July 8)
    - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
    - OPS: StayTreat (Jun 28-30)
    - LDRD: Develop/present proposal for Booster SC studies
    - ADMIN: Invention disclosures review
  Next two weeks (July 11-July 22)
    - JLEIC: Booster to Collider ring transfer line development, to JEDi
    - PERS: Medical leave (Jul 8-11)
    - ADMIN: Physical Review article review

David Douglas

  Previous two weeks (June 27-July 8)
    - DarkLight: Run preparations
    - JLEIC Cooler: Advise Chris on merger tracking
    - Cbeta: Advise on CSR, trim power supplies, costing
    - ER@CEBAF: meeting, kibitzing
    - Vacation: Jun 30-July 6
  Next two weeks (July 11-July 22)
    - DarkLight: Run preparations
    - ER@CEBAF: meeting, kibitzing
    - Project E: Study on EUV aperture requirements pushed back
       due to DarkLight, likely until post-Labor Day

Ed Nissen

  Previous two weeks (June 27-July 8)
    - OPS: StayTreat (Jun 28-30)
    - JLEIC Beam-Beam: Emit growth vs working point/rigidity studies
    - JLEIC: Synergia ramp-up for Booster SC, ramping simulations
    - JLEIC: Start cluster installation of Synergia (with Yves)
    - Vacation (July 1)
  Next two weeks (July 11-July 22)
    - JLEIC: Continue cluster installation of Synergia (with Yves)
    - JLEIC Beam-beam: Long-term Guinea pig simulations
    - JLEIC Beam-beam: Install COSY infinity to evaluate beam-beam phase space

Chris Tennant

  Previous two weeks (June 27-July 8)
    - JLEIC Cooler: Merger/tracking/S2E development
    - DarkLight: Support LED lattice finalization, checks
    - OPS: StayTreat (Jun 28-30)
    - ADMIN: GBBU simulation advice to Chen Xu of BNL
    - ER@CEBAF: meeting, kibitzing
  Next two weeks (July 11-July 22)
    - Project E: Return to aperture studies (pressure building)
    - DarkLight: Support lattice and engineering run preparations
    - ER@CEBAF: meeting, kibitzing

Randy Gamage

  Previous two weeks (June 27-July 8)
    - JLEIC: Continue bunch splitting simulations
    - JLEIC: Prep/review ODU student seminar (July 14)
  Next two weeks (July 11-July 22)
    - JLEIC: Prep/deliver ODU student seminar (July 14)
    - JLEIC: Writing outlines of initial dissertation chapters
    - JLEIC: Initial esme simulations of debunch/rebunch with impedance