2016-Jun-13 Biweekly Report

From Administrative
Revision as of 16:04, 19 July 2016 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (May 30-June 10) - ER@CEBAF: proposal writing - OPS: BTeam, RAR writing, RSR meetings, beam studies organization - REU: Star...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

  Previous two weeks (May 30-June 10)
    - ER@CEBAF: proposal writing
    - OPS: BTeam, RAR writing, RSR meetings, beam studies organization
    - REU: Start work with REU student Deepsana Shahi (Adelphi)
    - JLEIC: Parameters meeting organization
    - JACOW: Assist IPAC'17/HB'16 with SPMS problems
    - ADMIN: Prep/deliver summer lecture (Introduction to Accelerators)
  Next two weeks (June 13-24)
    - OPS: Optics on call, BTeam, RAR writing, beam studies organization
    - OPS: StayTreat talk draft preparations
    - OPS: TAC Hall D LOI reviews/comments to TAC members
    - REU: Continue work with REU student Deepsana Shahi (Adelphi)
    - ER@CEBAF: organize next steps (optics coordination with BNL)

Alex Bogacz

  Previous two weeks (May 30-June 10)
    - ER@CEBAF: write section for proposal
    - JLEIC: Booster studies planning, meeting, coordination
    - USPAS: Lecture and homework preparations
  Next two weeks (June 13-24)
    - USPAS: Teaching at Colorado USPAS with Geoff Krafft

David Douglas

  Previous two weeks (May 30-June 10)
    - Cbeta: travel and design review preparations
    - DarkLight: Optics deck to Chris for LED-ification
    - MSU BES proposal: Wrap up and deliver
  Next two weeks (June 13-24)
    - Cbeta: Review participation
    - Darklight: Continued preparation for summer runs, coordination
      with LED/ops, write TN on optics design
    - JLEIC cooler: Finish TNs on magnetized beam transport

Ed Nissen

  Previous two weeks (May 30-June 10)
    - JLEIC Beam-Beam: Improve tracking, physical results for low
      energy beams
    - JLEIC: Finished initial look at space charge in booster
  Next two weeks (June 13-24)
    - JLEIC Beam-Beam: Working towards middle energy set
    - JLEIC Beam-Beam: Parameterization of beam-beam growth in energy

Chris Tennant

  Previous two weeks (May 30-June 10)
    - Project E: Work on ubunching gain analysis and troubleshooting
    - OPS: Work with Yves to understand orbit correction in elegant
    - LERF: Translate DarkLight dimad deck to elegant for LED import
  Next two weeks (June 13-24)
    - JLEIC Cooler: Working on further start to end tracking, corrections
    - ADMIN: Reading up on MARIE for August light source workshop

Randy Gamage

  Previous two weeks (May 30-June 10)
    - JLEIC: esme model development, bunch split optimization
    - Continue documenting results for thesis, IPAC'16 paper
    - USPAS: homework preparations
  Next two weeks (June 13-24)
    - USPAS: TA for Alex / Geoff in Colorado USPAS