2016-Mar-04 Biweekly Report

From Administrative
Revision as of 11:51, 11 March 2016 by Anichols (talk | contribs) (Created page with "Todd Satogata Previous two weeks (Feb 22-Mar 4) - Finalized review ODU/JLab paper on GHOST to prepare for publication - OPS: BTeam, tune team prep - OPS: Dev...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

  Previous two weeks (Feb 22-Mar 4)
    - Finalized review ODU/JLab paper on GHOST to prepare for publication
    - OPS: BTeam, tune team prep
    - OPS: Develop and implement new Hall D slow orbit lock configuration
    - OPS: Develop new Hall D IHA5C00 matching strategy to improve FFB phases
    - ADMIN: Follow up with bERLinPro contacts re account disposition
    - CBeta: collaboration paperwork development and strategizing
    - ER@CEBAF: biweekly meeting org, proposal writing
    - JACoW: Discussions with Shane Koscelniak (TRIUMF) re IPAC'18
    - ADMIN: Ed Nissen visit, work planning
    - JLEIC: Simulation workload discussions/meetings
  Next two weeks (Mar 7-Mar 18)
    - OPS: BTeam, tune team prep
    - OPS: Implement new Hall D IHA5C00 matching strategy to improve FFB phases
    - ER@CEBAF: Francois Meot visit, discussions
    - OPS: Eric Thompson, continued fopt fits, documentation
    - JLEIC/ODU: Bunch splitting development with Randy
    - JLEIC: Investigate code requirements for gear changing simulations
    - JACoW: Finish COOL'15 talk processing, publish to JACoW; template work
    - CBeta: continue collaboration paperwork development

Alex Bogacz

  Previous two weeks (Feb 22-Mar 4)
    - JLEIC: Ion Booster design
    - ER@CEBAF: Arc A chicane layout
  Next two weeks (Mar 7-Mar 18)
    - UITF: UITF modeling
    - JLEIC: Ion Booster chromaticity correction
    - PERS: Med leave

David Douglas

  Previous two weeks (Feb 22-Mar 4)
    - DarkLight: matching development, flat beam transforms vs solenoids
    - CBeta: Risk assessment, collaboration paperwork development
    - Project E: Meetings, meetings, meetings
    - JLEIC Cooler: matching development with DarkLight, meetings
    - ER@CEBAF: one meeting, discussions of detailed dipole modeling
  Next two weeks (Mar 7-Mar 18)
    - DarkLight: Complete IR optics, start detailing correction systems
    - CBeta: start sensitivity assessment and support S2E
    - Project E: Provide feedback on Lattice 3.2 and a patent disclosure,
      more meetings
    - JLEIC Cooler: Prep for collaboration meeting
    - ER@CEBAF: meeting, push to reassess the longitudinal match and
      impact of field imperfections

Chris Tennant

  Previous two weeks (Feb 22-Mar 4)
    - Project E: more halo map analysis (including head/tail particles)
    - Project E: more work on ubunching gain, evaluation of new code and
      limitations of numerical instability
    - Project E: evaluating elegant Touschek results vs simple numerical
      model
    - JLEIC Cooler: s2e with newest set of bunch parameters
    - JLEIC Cooler: Tstep troubleshooting
    - JLEIC Cooler: Prep for collaboration meeting
  Next two weeks (Mar 7-Mar 18)
    - Project E: complete Touschek analysis
    - Project E: await details of ASML/DOE meeting (CRADA?!)
    - JLEIC Cooler: continue s2e: beam quality at cooling solenoid?
    - JLEIC Cooler: refine model (matching input from Dave)
    - JLEIC Cooler: ubunching gain analysis on recirculation arc
    - Write erratum to TN-15-52 concerning (erroneous) emittance
      values reported when using qsUtility during fall 2015

Randy Gamage

  Previous two weeks (Feb 22-Mar 4)
    - MEIC: esme model development, bunch split optimization
    - Start documenting results for thesis, IPAC'16 paper
  Next two weeks (Mar 7-Mar 18)
    - MEIC: esme model development, bunch split optimization
    - Continue documenting results for thesis, IPAC'16 paper