2016-Mar-04 Biweekly Report
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Todd Satogata
Previous two weeks (Feb 22-Mar 4) - Finalized review ODU/JLab paper on GHOST to prepare for publication - OPS: BTeam, tune team prep - OPS: Develop and implement new Hall D slow orbit lock configuration - OPS: Develop new Hall D IHA5C00 matching strategy to improve FFB phases - ADMIN: Follow up with bERLinPro contacts re account disposition - CBeta: collaboration paperwork development and strategizing - ER@CEBAF: biweekly meeting org, proposal writing - JACoW: Discussions with Shane Koscelniak (TRIUMF) re IPAC'18 - ADMIN: Ed Nissen visit, work planning - JLEIC: Simulation workload discussions/meetings Next two weeks (Mar 7-Mar 18) - OPS: BTeam, tune team prep - OPS: Implement new Hall D IHA5C00 matching strategy to improve FFB phases - ER@CEBAF: Francois Meot visit, discussions - OPS: Eric Thompson, continued fopt fits, documentation - JLEIC/ODU: Bunch splitting development with Randy - JLEIC: Investigate code requirements for gear changing simulations - JACoW: Finish COOL'15 talk processing, publish to JACoW; template work - CBeta: continue collaboration paperwork development
Alex Bogacz
Previous two weeks (Feb 22-Mar 4) - JLEIC: Ion Booster design - ER@CEBAF: Arc A chicane layout Next two weeks (Mar 7-Mar 18) - UITF: UITF modeling - JLEIC: Ion Booster chromaticity correction - PERS: Med leave
David Douglas
Previous two weeks (Feb 22-Mar 4) - DarkLight: matching development, flat beam transforms vs solenoids - CBeta: Risk assessment, collaboration paperwork development - Project E: Meetings, meetings, meetings - JLEIC Cooler: matching development with DarkLight, meetings - ER@CEBAF: one meeting, discussions of detailed dipole modeling Next two weeks (Mar 7-Mar 18) - DarkLight: Complete IR optics, start detailing correction systems - CBeta: start sensitivity assessment and support S2E - Project E: Provide feedback on Lattice 3.2 and a patent disclosure, more meetings - JLEIC Cooler: Prep for collaboration meeting - ER@CEBAF: meeting, push to reassess the longitudinal match and impact of field imperfections
Chris Tennant
Previous two weeks (Feb 22-Mar 4) - Project E: more halo map analysis (including head/tail particles) - Project E: more work on ubunching gain, evaluation of new code and limitations of numerical instability - Project E: evaluating elegant Touschek results vs simple numerical model - JLEIC Cooler: s2e with newest set of bunch parameters - JLEIC Cooler: Tstep troubleshooting - JLEIC Cooler: Prep for collaboration meeting Next two weeks (Mar 7-Mar 18) - Project E: complete Touschek analysis - Project E: await details of ASML/DOE meeting (CRADA?!) - JLEIC Cooler: continue s2e: beam quality at cooling solenoid? - JLEIC Cooler: refine model (matching input from Dave) - JLEIC Cooler: ubunching gain analysis on recirculation arc - Write erratum to TN-15-52 concerning (erroneous) emittance values reported when using qsUtility during fall 2015
Randy Gamage
Previous two weeks (Feb 22-Mar 4) - MEIC: esme model development, bunch split optimization - Start documenting results for thesis, IPAC'16 paper Next two weeks (Mar 7-Mar 18) - MEIC: esme model development, bunch split optimization - Continue documenting results for thesis, IPAC'16 paper