2016-Mar-21 Accel. Phys. Biweekly Report
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Todd Satogata
Previous two weeks (Mar 7-Mar 18) - OPS: BTeam, tune team prep - OPS: Implement new Hall D IHA5C00 matching strategy to improve FFB phases - UITF operations review - ER@CEBAF: Francois Meot visit, discussions - OPS: Eric Thompson, continued fopt fits, documentation - JLEIC/ODU: Bunch splitting development with Randy - CBeta: continue collaboration paperwork development Next two weeks (Mar 18-Apr 1) - ADMIN: Personnel interviews - JLEIC: Collaboration meeting - ER@CEBAF: Proposal writing - OPS: Eric Thompson, continued fopt fits, documentation - JLEIC: Investigate code requirements for gear changing simulations - JLEIC/ODU: Bunch splitting development with Randy - CBeta: collaboration paperwork, meet with Bruce Dunham - JACoW: Finish COOL'15 talk processing, publish to JACoW; template work
Alex Bogacz
Previous two weeks (Feb 22-Mar 4) - JLEIC: Ion Booster design - ER@CEBAF: Arc A chicane layout Previous two weeks (Mar 7-Mar 18) - UITF: UITF modeling, review prep, review - JLEIC: Ion Booster chromaticity correction - PERS: Med leave Next two weeks (Mar 18-Apr 1) - JLEIC: Collaboration meeting - UITF: review followup - Muons: Start prepping IPAC'16 neutrino factory paper
David Douglas
Previous two weeks (Mar 7-Mar 18) - DarkLight: Complete IR optics, start detailing correction systems - CBeta: start sensitivity assessment and support S2E - Project E: Provide feedback on Lattice 3.2 and patent disclosure - JLEIC Cooler: Prep for collaboration meeting - ER@CEBAF: meeting, push to reassess the longitudinal match and impact of field imperfections Next two weeks (Mar 18-Apr 1) - DarkLight: Really complete IR optics, continue detailing correction systems - Project E: Meetings, meetings, meetings - CBeta: continued sensitivity assessment, feedback to design - JLEIC Cooler: Collaboration meeting and talk prep
Chris Tennant
Previous two weeks (Mar 7-Mar 18) - Project E: complete Touschek analysis - Project E: await details of ASML/DOE meeting (CRADA?!) - JLEIC Cooler: continue s2e: beam quality at cooling solenoid - JLEIC Cooler: refine model (matching input from Dave) - JLEIC Cooler: ubunching gain analysis on recirculation arc Next two weeks (Mar 18-Apr 1) - Project E: document Touschek analysis - JLEIC Cooler: continue s2e: alternative cooling methods - JLEIC Cooler: Collaboration meeting and talk prep - Write erratum to TN-15-52 concerning (erroneous) emittance values reported when using qsUtility during fall 2015
Randy Gamage
Previous two weeks (Mar 7-Mar 18) - MEIC: esme model development, bunch split optimization - Continue documenting results for thesis, IPAC'16 paper Next two weeks (Mar 18-Apr 1) - MEIC: esme model development, bunch split optimization - Continue documenting results for thesis, IPAC'16 paper - Start investigation of genetic algorithm merge optimization