2016-Nov-26 Accel. Phys. Biweekly Report
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Todd Satogata
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - ODU PHYS 231 class prep/teaching (MW half-days; midterm 3 grading) - BTeam/model team prep/participation - JLEIC R&D talk preparation - ODU/JLEIC Randy Gamage mentoring (CERN Blond code) - Thanksgiving break Next two weeks (Nov 27-Dec 10) - ODU PHYS 231 class prep/teaching (MW half-days) - JLEIC R&D talk preparation and travel (Nov 28-Dec 1) - BTeam/model team prep/participation, CEBAF ops support with Hall D? - ODU/JLEIC Randy Gamage mentoring (CERN Blond code) - IPAC17 abstract coordination/submission (Due Fri Dec 2) - CLAS12 review (Dec 6-7) - ODU: Alex Castilla PhD defense (Dec 8) - ER@CEBAF: Restart biweekly meetings - IPAC18 SPC1: Meeting prep - Various recommendation letters - ADMIN: Rui Li joining group
Alex Bogacz
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - SBIR proposal review - Development of coupled beta rotator, continued - APS: Prep survey of publication standards - CEBAF optics support Next two weeks (Nov 27-Dec 10) - PRST:AB paper review - APS: Prep/deliver/analyze survey of publication standards - JLEIC: Final pass on JLEIC Booster lattice
David Douglas
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - Tech note: magnetized beam transformations with symmetries to better understand insertions for CCRs and ERLs - SBIR proposal review - Completed cardiac rehab class! Next two weeks (Nov 27-Dec 10) - JLEIC: Continuing cooling insertion design - JLEIC: Evaluate Derbenev proposal on longitudinal/transverse emittance exchange in cooling system (Derbenev proposal) - JLEIC: Continue cooler ERL/CCR architecture (have idea for present baseline)
Ed Nissen
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - JLEIC: Continuation of collider beam-beam simulations (with gaps, fixed bug that was suppressing growth rates) - JLEIC: Continuation of booster injection space charge simulations Next two weeks (Nov 27-Dec 10) - JLEIC: Continuation of collider beam-beam simulations (alternating offsets and stopband evaluation) - JLEIC: Continuation of booster injection space charge simulations - JLEIC: Start draft of analytic beam-beam items from CERN/JLEIC work - IPAC17: Prep and submit abstracts (based on withdrawn NAPAC'16 versions)
Chris Tennant
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - Emittance error analysis for DarkLight, with Monte Carlo Next two weeks (Nov 27-Dec 10) - Finish up DarkLight emittance analysis, start writing TN - Prepare slides for diagnostic PIT meeting (Beaminizer ideas/needs) - JLEIC: Cooler development (extending/refinining end to end sims)
Randy Gamage
Previous two weeks (Nov 13-Nov 26, including Thanksgiving) - JLEIC: Continue writing outlines of initial dissertation chapters - JLEIC: Continue esme simulations of debunch/rebunch with impedance - JLEIC: Continue GA simulations of bunch splitting optimization Next two weeks (Nov 27-Dec 10) - JLEIC: Continue writing outlines of initial dissertation chapters - JLEIC: Continue esme simulations of debunch/rebunch with impedance - Schedule annual report presentation to committee - Start preparations for USPAS TA-ship