2016-Oct-28 Accel. Phys. Biweekly Report
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Todd Satogata
Previous two weeks (Oct 14-Oct 28) - ODU PHYS 231 class prep/teaching/grading (MW half-days) - OPS: BTeam/model team prep/participation - OPS: Optics on call, beam studies support, emittance survey - JLEIC R&D item preparation (coordinate injectors) - ADMIN: Annual review processing - AWP RSRBPH estimates development/documentation - JACoW Team Meeting planning/prep, technical support Next two weeks (Oct 31-Nov 11) - ODU PHYS 231 class prep/teaching (MW half-days) - BTeam/model team prep/participation - JLEIC ion linac lattice continued development - JLEIC R&D item preparation (Mon Oct 31) - ODU/JLEIC Randy Gamage mentoring (CERN Blond code) - JACoW Team meeting prep - TRAVEL: JACoW Team Meeting (Vancouver Nov 4-11)
Alex Bogacz
Previous two weeks (Oct 14-Oct 28) - JLEIC R&D item preparation (Booster space charge) - OPS: Optics on call, beam studies support - Collaborate on TechX research proposal "Collective effects in ERLs" Next two weeks (Oct 31-Nov 11) - Review Phys Rev Letter on "twisted photons" - JLEIC Booster: IMPACT-TD code testing (code from SLAC/JiQiang) - Development of coupled beta rotator - JLEIC R&D item preparation if needed
David Douglas
Previous two weeks (Oct 14-Oct 28) - Vacation (Oct 10-21) - Finish writing up helicity flip design work (delivered Oct 10) - JLEIC R&D item preparation (CCR test design) - CCR arc design thinking (FFAG arcs? Do they preserve beam quality?) - Developing ring/ERL collider tech note with Bogdan - OPS: assist with LERF tour Next two weeks (Oct 31-Nov 11) - Write overview document of magnetized beam transport, LANL correspondence - Continued cooler transport development
Ed Nissen
Previous two weeks (Oct 14-Oct 28) - OPS: Program Deputy (Started Oct 19) - JLEIC: Continuation of booster injection space charge simulations Next two weeks (Oct 31-Nov 11) - OPS: Program Deputy (Ending Nov 2) - JLEIC: Continuation of booster injection space charge simulations - JLEIC: Continuation of collider beam-beam simulations
Chris Tennant
Previous two weeks (Oct 14-Oct 28) - Catch up on outstanding training - Continue analyzing emittance data from DarkLight run - Lots of time spent extracting beam sizes from beamanizer - Continue collaboration with Auralee (CSU student) to train neural network Next two weeks (Oct 31-Nov 11) - Continue writing up DarkLight emittance analysis for TN - Refine data for Auralee neural network training
Randy Gamage
Previous two weeks (Oct 14-Oct 28) - JLEIC: Continue writing outlines of initial dissertation chapters - JLEIC: Correspond with CERN re blond code, install, initial testing - JLEIC: Continue GA simulations of bunch splitting optimization Next two weeks (Oct 31-Nov 11) - JLEIC: Continue writing outlines of initial dissertation chapters - JLEIC: Continue esme/blond simulations of debunch/rebunch with impedance - JLEIC: Continue GA simulations of bunch splitting optimization