2017-01-06

From Administrative
Revision as of 10:23, 2 November 2017 by Anichols (talk | contribs) (Created page with "'''Director - M. Spata <br>''' No report ---- '''Accelerator Physics - T. Satogata <br>''' Todd Satogata Previous two weeks (Jan 3-6) - USPAS: Class preparation...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Director - M. Spata

No report



Accelerator Physics - T. Satogata

Todd Satogata

 Previous two weeks (Jan 3-6)
   - USPAS: Class preparation
   - OPS: Daily meetings, spring run preparation
   - IPAC18: SPC1 meeting prep
   - ER@CEBAF: Seminar prep
   - ADMIN: ODU/Adelphi REU recommendation letters
   - ADMIN: student meetings (Randy, EricT)
 Next two weeks (Jan 9-Jan 20)
   - ADMIN: Meet with Rui, establish expectations/reporting
   - ADMIN: Distribute normalized annual reviews to group
   - IPAC18: SPC1 meetings (Jan 10-12)
   - ODU: Randy annual research presentation (Jan 11)
   - OPS: Daily meetings, spring run preparation, BTeam/ATLis prep
   - ADMIN: student meetings (Randy, EricT)
   - USPAS: Teaching (Jan 15-28)

Alex Bogacz

 Previous two weeks (Jan 3-6)
   - Publication survey analysis (APS publication committee)
   - JLEIC: Transfer of Booster lattice to Ed
   - Vacation (Jan 4-6)
 Next two weeks (Jan 9-Jan 20)
   - PERLE : continue lattice design, Feb trip prep
   - JINST article review
   - Invention disclosure reviews

David Douglas

 Previous two weeks (Jan 3-6)
   - JLEIC: CCR arc option evaluation
   - JLEIC: Devise/refine solutions for arcs with local axial
     symmetry, dispersion suppression, and isochronicity (and
     working to shorten an initial design)
 Next two weeks (Jan 9-Jan 20)
   - JLEIC: Write up CCR arc option evaluation tech note
   - JLEIC: Work with Chris on longitudinal beam dynamics
     of EUV FEL-type arcs and magnetized beam transport

Ed Nissen

 Previous two weeks (Jan 3-6)
  - JLEIC: Continue writing PRSTAB paper draft on beam-beam sims
  - JLEIC: Start evaluating/planning Booster lattice from Alex
 Next two weeks (Jan 9-Jan 20)
  - JLEIC: Continue evaluating/planning Booster lattice
  - JLEIC: Review recent PRST:AB on booster injection space charge compensation
  - JLEIC: Continue writing PRSTAB paper draft on beam-beam sims

Chris Tennant

 Previous two weeks (Jan 3-6)
   - DarkLight: Finished TN on emittance analysis
   - JLEIC: Translate Dave DIMAD ERL cooler recovery arc to elegant
   - JLEIC: Transport simulations of magnetized beam in EUV FEL-type arc
 Next two weeks (Jan 9-Jan 20)
   - JLEIC: Tracking studies for new CCR baseline through arc
     (axisymmetric and non-axisymmetric)
   - JLEIC: Investigation of measuring emittance in multi-component
     beams (also applicable to DarkLight TN analysis)
   - LERF: Start evaluating injector simulations for NASA irradiation project

Randy Gamage

 Previous two weeks (Jan 3-6)
   - JLEIC: Continue writing outlines of initial dissertation chapters
   - JLEIC: Continue esme simulations of debunch/rebunch with impedance
   - Start preparations for USPAS TA-ship
 Next two weeks (Jan 9-Jan 20)
   - Annual report presentation to committee (Jan 11)
   - USPAS: TA for Todd/Cedric course (Jan 15-28)



Accelerator R and D - Y. Zhang



Computational Physics - Y. Roblin



Diagnostic Development - K. Jordan