2017-02-17

From Administrative
Revision as of 10:18, 2 November 2017 by Anichols (talk | contribs) (Created page with " '''Accelerator Physics <br>''' Todd Satogata Previous two weeks (Feb 6-Feb 17) - JACoW: board of directors telecon - ADMIN: Annual review meetings, CASA group m...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.


Accelerator Physics

Todd Satogata

 Previous two weeks (Feb 6-Feb 17)
   - JACoW: board of directors telecon
   - ADMIN: Annual review meetings, CASA group meet
   - OPS: Hall D run setup/support; BTeam org, beam studies; Optics Feb 7-14
   - HALLD: GlueX collaboration meeting/talk (Feb 16-18)
   - IPAC18: SAB invitation management
   - JLEIC: Resurrect old gear changing simulations for GHOST collaboration
   - JLEIC: Reading impedance papers
 Next two weeks (Feb 20-Mar 3)
   - OPS: Hall D run setup/support; BTeam org, beam studies; Optics Feb 7-14
   - JLEIC: Work/meetings on ion bunch formation strategy
   - JLEIC: Collective effects, spreadsheet planning and nagging; R&D meet
   - JLEIC: reading impedance papers, start longitudinal simulations
   - JLEIC: Start 4/3 gear changing simulations for GHOST paper
   - IPAC18: Start organizing ideas for invited talk proposals (SPC task)

Alex Bogacz

 Previous two weeks (Feb 6-Feb 17)
   - OPS: Optics support, injector match evaluation
   - PERLE: lattice re-design, Feb trip/presentation prep
 Next two weeks (Feb 20-Mar 3)
   - PERLE:  Orsay kick-off meeting
   - PRAB article review
   - JLEIC: Booster meetings re injection/parameters

David Douglas

 Previous two weeks (Feb 6-Feb 17)
   - JLEIC: Finish up emittance exchange, including example; document;
     first pass appears unworkable
   - JLEIC: Continue work on CCR arc requirements tech note and arc design
   - ADMIN: Accelerator TRC review memo (later rendered irrelevant)
   - PERLE: Feb trip/presentation preparation (operations driven I&C)
 Next two weeks (Feb 20-Mar 3)
   - JLEIC: Write up of emittance exchange slides/tech note
   - JLEIC: Return to CCR arc requirements document, CCR architecture
     concepts document, and ERL/CCR beam exchange system requirements

Rui Li

 Previous two weeks (Feb 6-Feb 17)
   - Feb. 6-10: survey impedance budget studies, prepare and make
     presentation at the JLEIC R&D meeting
   - Feb. 13-18: understanding the state-of-art for the
     potential-well effect and the longitudinal single-bunch
     instability
 Next two weeks (Feb 20-Mar 3)
   - Feb. 20-26: understanding the logic and assumptions of ZAP, and
     see how its input can be related with the JLEIC
     database. Estimating JLEIC single bunch effects.
   - Feb. 27-Mar. 5: further understanding of the state-of-art for
     transverse single-bunch instabilities
   - Cheng-Ying needs more time to refine his thesis, so I expect to
     read and review it in a few weeks

Ed Nissen

 Previous two weeks (Feb 6-Feb 17)
   - JLEIC: Continue implementing gear changing script model for
     Guinea Pig for 4/3 gear changing evaluation
   - JLEIC: Continue evaluating/planning Booster injection design,
     literature search
   - ADMIN: Fighting with MFA (took a few days)
 Next two weeks (Feb 20-Mar 3)
   - JLEIC: Continue writing PRSTAB paper draft on beam-beam sims,
     iterate with Daniel Schulte at CERN
   - JLEIC: Continue implementing gear changing script model for
     Guinea Pig for 4/3 gear changing evaluation
   - JLEIC: Finish literature search, start documenting parameters
     for calculations and future simulations

Chris Tennant

 Previous two weeks (Feb 6-Feb 17)
   - JLEIC: analysis of CCR-like arc with collective effects (space
     charge, CSR, space charge + CSR) (it ain't good)
   - JLEIC: analysis of mitigation of CSR wake using RF cavity in
     circulator ring (still ain't good)
   - JLEIC: analysis of merger performance at 2 nC (it ain't good)
   - JLEIC: started combing through 2 years of
     notes/slides/TNs/results to summarize work done for the
     ERL-driven cooler concept (i.e. the previous baseline)
 Next two weeks (Feb 20-Mar 3)
   - JLEIC: continue work on aforementioned TN
   - JLEIC: simulate Slava's/Dave's emittance exchange (probably
     ain't good)

Randy Gamage

 Previous two weeks (Feb 6-Feb 17)
   - JLEIC: Continue BLonD simulations of debunch/rebunch with impedance
   - JLEIC: Longitudinal impedance reading
 Next two weeks (Feb 20-Mar 3)
   - JLEIC: Continue BLonD simulations of debunch/rebunch with impedance
   - JLEIC: Continue Longitudinal impedance reading, calculations
   - JLEIC: Continue writing outlines of initial dissertation chapters



Accelerator R and D - Y. Zhang



Computational Physics - Y. Roblin



Diagnostic Development - K. Jordan