2017-03-17

From Administrative
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Director - M. Spata
No report



Accelerator Physics - T. Satogata

Todd Satogata

  Previous two weeks (Mar 6-Mar 17)
    - OPS: BTeam org, beam studies planning, Hall C KPP support
    - ODU: Review PhD theses for Kirsten Deitrick, Ahmad Sheikhzadah
    - JLEIC: Continue work/meetings on ion bunch formation strategy
    - JLEIC: Start writing ramp calculator code to evaluate/plot synchrotron ramps
    - JLEIC: Collective effects, spreadsheet planning and nagging; R&D meet
    - JLEIC: Finish impedance theory work, start longitudinal simulations
    - JLEIC: Evaluate evol beam-beam code, present at biweekly simulation meet
    - IPAC18: Start organizing ideas for invited talk proposals (SPC task)
    - ADMIN: Eric Thompson meetings, research input
    - ADMIN: Prepping for Elon documentary student visit Mar 20-22
    - JACOW: COOL'15 proceedings published on JACoW website Mar 9
  Next two weeks (Mar 20-Mar 31)
    - ADMIN: Elon documentary student visit Mar 20-22
    - ODU: PhD defenses for Kirsten Deitrick (Mar 21), Ahmad Sheikhzadah (Mar 28)
    - IPAC18: Organize/submit ideas for invited talk proposals (deadline Mar 31)
    - IPAC18: Review/clean up invited talk proposals for committee evaluation
    - JLEIC: Develop/document ion bunch formation strategy
    - JLEIC: Collective effects, spreadsheet planning and nagging; R&D meet
    - JLEIC: Start 4/3 gear changing simulations for GHOST paper, evol beam-beam sims
    - JLEIC: Prep talks for Apr 3-5 collaboration meeting
    - ADMIN: Eric Thompson meetings, research input

Alex Bogacz

  Previous two weeks (Mar 6-Mar 17)
    - PRL article review
    - PERLE: Iterate mini-PERLE design with longer magnets (per CERN)
    - JLEIC: Booster input to Todd re injection/parameters
    - ADMIN: Invention dicsclosures review, TRC meeting
  Next two weeks (Mar 20-Mar 31)
    - PERLE: Optics optimization with longer magnets, larger footprint
    - USPAS: Practical lattice design course development
    - ADMIN: SPC meetings (ERL'17, NuFact'17)
    - JLEIC: Incidental design meetings

David Douglas

  Previous two weeks (Mar 6-Mar 17)
    - Finished write-up of transverse/longitudinal EmEx (JLAB-TN-17-008)
    - Reviewed numerous proposals as part of US/Japan Panel Review
      (Gaithersburg, 3/6)
    - Provided input to Shawn Frierson on LERF operational procedures
    - Did markup on forthcoming JLAB-TN on ERL-based single-pass
      cooler (Tennant, Douglas, Benson, & Hannon)
    - Did markup on Project E journal article in preparation
      (Akkermanns, Setija, (ASML), Di Mitri (FERMI@Elletra), &
      Douglas)
    - Cooked up a way to double CEBAF momentum acceptance; draft TN
      attached (waiting on co-author review before releasing)
    - Laid out/evaluated solution for CCR/ERL beam exchange system
      (1st iterate 75% complete; still have to do ERL-to-exchange
      transport match)
  Next two weeks (Mar 20-Mar 31)
    - Complete beam exchange and write up
    - Write up ERL/CCR architecture requirements/trades
    - Write up "Life Hacks" for magnetized beam
    - Complete and write up requirements document for CCR arcs
    - Start work on CCR design

Rui Li

  Previous two weeks (Mar 6-Mar 17)
    - JLEIC: Continue estimation of single-bunch instability effects
    - JLEIC: Start estimation of coupled-bunch instability effects based
      on collected parameters
    - ADMIN: Continue reading, commenting on Cheng-Ying's dissertation
    - ADMIN: Prep for Mar 20-21 travel to Va Tech for Chang-Ying's defense
  Next two weeks (Mar 20-Mar 31)
    - ADMIN: PhD Defense for Cheng-Ying (Mon-Tue at Virginia Tech)
    - JLEIC: Prepare slides and present status on instability estimates
      for R&D meeting
    - JLEIC: Update impedance parameters/estimations from engineering input
    - JLEIC: Prep talk for Apr 3-5 collaboration meeting

Ed Nissen

  Previous two weeks (Mar 6-Mar 17)
    - JLEIC: Collider, Guinea pig beam-beam simulations for cross-code comparison
    - JLEIC: Booster, Work on trying to get injection simulation working in
      Synergia
    - JLEIC: Booster, Start running space charge simulations using new
      parameter set from Todd; shift to sims at midpoint and extraction
      to make progress
  Next two weeks (Mar 20-Mar 31)
    - JLEIC: Continue space charge simulations with new parameter set,
      continuing middle and high energy and fixing injection parameter sets
    - JLEIC: Start documenting beam-beam and space charge simulation work

Chris Tennant

  Previous two weeks (Mar 6-Mar 17)
    - JLEIC Cooler: S2E analysis complete for single-pass ERL cooler
    - Organize and write tech note of results thus far (JLAB-TN-17-009)
  Next two weeks (Mar 20-Mar 31)
    - JLEIC Cooler: Translate Dave Douglas's emittance exchange to elegant and
      begin pushing particles
    - JLEIC Cooler: Start circulator cooler ring (CCR) simulation
      efforts (details to be determined in next meeting)
    - ADMIN: Begin ERL17 outline / organize thoughts

Randy Gamage

  Previous two weeks (Mar 6-Mar 17)
    - JLEIC: Continue BLonD simulations of debunch/rebunch with impedance
    - JLEIC: Continue Longitudinal impedance reading, calculations
    - JLEIC: Continue writing outlines of initial dissertation chapters
  Next two weeks (Mar 20-Mar 31)
    - JLEIC: Continue writing outlines of initial dissertation chapters,
      impedance calculations and theory
    - JLEIC: Figure out BLonD simulation bug (non-periodicity) and
      simulate coasting beam uwave instability, compare to theory



Accelerator R and D - Y. Zhang



Computational Physics - Y. Roblin



Diagnostic Development - K. Jordan