2017-04-14

From Administrative
Revision as of 10:02, 2 November 2017 by Anichols (talk | contribs) (Created page with "'''Director - M. Spata'''<br> No report ---- '''Accelerator Physics - T. Satogata'''<br> Todd Satogata Previous two weeks (Apr 3-Apr 14) - JLEIC: Collaboration Me...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Director - M. Spata
No report



Accelerator Physics - T. Satogata

Todd Satogata

  Previous two weeks (Apr 3-Apr 14)
    - JLEIC: Collaboration Meeting (Apr 3-5)
    - JLEIC: Side meetings (Ilya from Tech-X on spin tracking)
    - SCIDAC/ASCR proposal reviews, Rockville panel (Apr 6-7)
    - OPS: BTeam prep, meeting, Hall D difference orbit analysis
    - ODU: JMU seminar planning
    - USPAS: director committee telecon, calls
    - IPAC18: Invited abstract review, SPC/2 preparation
    - PRAB article review (start)
    - ADMIN: Laptop video card failure, repair in progress
    - VACATION: half Apr 12
  Next two weeks (Apr 17-Apr 28)
    - PRAB article review (finish)
    - ADMIN: Leadership training (Apr 21)
    - JLEIC: Ion integration, coordinate with ANL linac personnel
    - JLEIC: Ramp design, development for Booster parameters
    - IPAC17: Student poster booklet layout/production
    - IPAC18: SPC committee abstract reviews, SPC/2 preparation
    - USPAS: director committee telecon, calls

Alex Bogacz

  Previous two weeks (Apr 3-Apr 14)
    - JLEIC: Collaboration Meeting (Apr 3-5)
    - USPAS: Course development for Jan 2018 Practical Lattice Design
    - PERLE: Instrumentation and tuning
  Next two weeks (Apr 17-Apr 28)
    - IPAC paper prep (Booster optics, ER@CEBAF)
    - PRAB article review
    - ERL'17 and NuFact'17 SPC meetings
    - PERLE: prep mini start to end simulations

David Douglas

  Previous two weeks (Apr 3-Apr 14)
    - JLEIC: Collaboration Meeting (Apr 3-5)
    - PERLE: Write up tech note TN-17-014 on CSR estimates
    - JLEIC: Simulation, tech note draft on transfer kicker dynamics
  Next two weeks (Apr 17-Apr 28)
    - VACATION: Apr 19-25
    - JLEIC: Work through/write up CCR LSC effects estimate
    - JLEIC: Complete and write up reqs doc for CCR arcs
    - JLEIC: Write up "Life Hacks" for magnetized beam
    - JLEIC: Write up ERL/CCR architecture reqs/tradeoffs

Rui Li

  Previous two weeks (Apr 3-Apr 14)
    - JLEIC: Collaboration Meeting (Apr 3-5)
    - Start IPAC paper/poster prep (JLEIC collective effects)
    - Learning about fundamental RF mode/coupled bunch instability growth times
    - Discussions with Rimmer re LLRF impact on fundamental mode impedance
    - Review CSR results from Cheng-Ying and Dave on EEX beamline
  Next two weeks (Apr 17-Apr 28)
    - Finish IPAC paper/poster prep (JLEIC collective effects)
    - Evaluate impedance mode contributions to coupled bunch instabilities
    - Coordinate impedance mode contributions with Jiquan cavity design
    - Review transient CSR impedance to prep for second IPAC17 paper
    - Continue with JLEIC instability estimates

Ed Nissen

  Previous two weeks (Apr 3-Apr 14)
    - JLEIC: Collaboration Meeting (Apr 3-5)
    - JLEIC: Figured out issue with Booster emittance growth
    - JLEIC: Re-run simulations with better tunes for IPAC papers
    - Start IPAC paper prep (Booster SC, beam-beam sims)
  Next two weeks (Apr 17-Apr 28)
    - Finish IPAC paper/poster prep (Booster SC, beam-beam sims)
    - JLEIC: Improve fidelity of Booster injection/SC simulations

Chris Tennant

  Previous two weeks (Apr 3-Apr 14)
    - JLEIC: Collaboration Meeting (Apr 3-5)
    - PERLE: Simulations for CSR study
    - ERL'17: Start paper prep (entering DarkLight coauthors into SPMS)
  Next two weeks (Apr 17-Apr 28)
    - JLEIC: S2E cooler work and simulations
    - ERL'17: Continue paper prep (synthesize info from talks/papers)
    - PERLE: More simulations for CSR study?

Randy Gamage

  Previous two weeks (Apr 3-Apr 14)
    - JLEIC: Collaboration Meeting (Apr 3-5)
    - JLEIC: Coasting beam instability calculations/simulations
    - Dissertation writing
  Next two weeks (Apr 17-Apr 28)
    - JLEIC: Finish coasting beam instability calculations/simulations
    - Dissertation writing: Finish coasting beam chapter

Accelerator R and D - Y. Zhang



Computational Physics - Y. Roblin



Diagnostic Development - K. Jordan