2017-10-02

From Administrative
Revision as of 10:03, 11 October 2017 by Anichols (talk | contribs) (Created page with " '''Director (M. Spata)''' No Report ---- '''Accelerator Physics (T. Satogata)''' Todd Satogata Previous two weeks (Sep 18-Sep 29) - ADMIN: Appraisal training (Sep...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Director (M. Spata) No Report



Accelerator Physics (T. Satogata) Todd Satogata

   Previous two weeks (Sep 18-Sep 29)
     - ADMIN: Appraisal training (Sep 19)
     - OPS: BTeam (Sep 19), ATLis cleanup, troubleshooting guide, RSR accounting
     - IPAC18: invited program finalization, registration opening
     - JLEIC: Continue assembling documents, pCDR meetings/planning
     - JLEIC: Continued esme simulations for coasting beam instability evaluation
     - ODU: USPAS January 2018 class coordination (registration opening)
     - ADMIN: Write recommendation letter for Eric Thompson Fulbright
       application
     - ODU: JMU seminar prep/trip (Sep 29)
   Next two weeks (Oct 2-Oct 13)
     - PERS: Wish Mike a Happy Birthday (Oct 2)
     - OPS: BTeam (Oct 3), ATLis cleanup, ORFP update review
     - OPS: 12 GeV beam parameter meeting
     - JLEIC: Prepare talk for BNL collaboration meeting
     - ADMIN: Peer review NIM paper
     - IPAC18: Editorial board meet (Oct 5), SPMS support work
     - JACOW: Team Meeting travel planning, organization
     - JLEIC: Continue assembling documents, pCDR meetings/planning
     - HALLD: Help McCaughan prepare slides for GlueX collab meet talk (Oct 12)
     - JLEIC: Collaboration Meeting (Oct 9-13)

Alex Bogacz

   Previous two weeks (Sep 18-Sep 29)
     - NUFACT: NUFACT'17, talk on "Muon Acceleration for Neutrino Factory and Beyond"
     - IPAC18: Continue APS scientific publication board org for light peer review
     - ADMIN: Invention disclosure review, TRC work
   Next two weeks (Oct 2-Oct 13)
     - ADMIN: Peer review PRAB paper
     - NUFACT: Write, finish paper for NUFACT'17 proceedings
     - USPAS: Continue work on lectures for "Practical Accelerator Design"

David Douglas

   Previous two weeks (Sep 18-Sep 29)
     - JLEIC: More work beating on tilted solenoid, comparison to DIMAD
     - JLEIC: Work on talk for EIC collaboration meeting
     - JLEIC: respond to any results Chris develops on the simple CCR
       arcs (and started write up the simple arc)
     - JLEIC: Work with Chris to understand Bmad quadrupole model
     - ADMIN: Neil symposium (Sep 27)
   Next two weeks (Oct 2-Oct 13)
     - JLEIC: continue with tilted solenoid: generate transfer matrix
       (numerical differentiation); start comparing to conventional
       modeling
     - JLEIC: continue responding to any results Chris develops on the simple
       CCR arcs and writing up the simple arc
     - ADMIN: talks for collaboration meeting, Bonn, and Daresbury

Rui Li

   Previous two weeks (Sep 18-Sep 29)
     - JLEIC: prepare slides summarizing my understanding of
       electron cloud in JLEIC and present at R&D meeting
     - JLEIC: start to work on slides summarizing JLEIC collective
       effects for the upcoming collaboration meeting in BNL
     - ADMIN: continue to work on matters for the thesis award
       committee (deadline is 9/16)
     - ADMIN: Write recommendation letter for Eric Thompson Fulbright
       application
     - VACATION: Sep 22
     - ADMIN: Neil symposium (Sep 27)
   Next two weeks (Oct 2-Oct 13)
     - VACATION: Oct 2-3
     - JLEIC: Prepare slides on collective effects for EIC collab meet
     - JLEIC: Collaboration Meeting (Oct 9-13)

Ed Nissen

   Previous two weeks (Sep 18-Sep 29)
     - JLEIC: chasing down issues around injection problems in the
       booster, and we determined that there may be dispersion in
       sections that are not dispersive.
     - ADMIN: Neil symposium (Sep 27)
   Next two weeks (Oct 2-Oct 13)
     - JLEIC: figure out the best way of combatting injection
       synchrobetatron coupling and hopefully get a good injection
       simulation going.
     - VACATION: Oct 9

Chris Tennant

   Previous two weeks (Sep 18-Sep 29)
     - JLEIC: trying to benchmark Bmad for a single quad (elegant and DIMAD
       agree but use the same phase space coordinates while Bmad does
       not; tried (with Dave's help and a 30+ year old TN he wrote) to
       do the appropriate transformations. Still not making sense)
     - PERLE: learning/trouble-shooting Cheng-Ying's code for use with
       acceleration (to model S2E PERLE lattice)
     - JLEIC: summarizing results from analysis of CCR "simple arc"
       (microbunching is under control, one pass through arc is okay,
       10 passes through a ring comprised of arc and we're doomed -
       CSR longitudinal wake induced energy spread growth/distortion
       and CSR-generated emittance growth)
     - ADMIN: Neil symposium (Sep 27)
   Next two weeks (Oct 2-Oct 13)
     - CRADA signed? (a talk at the symposium raised the possibility
       of renewed interest in FEL for Navy and/or lithography in 2025
       time frame - woot!)
     - JLEIC: resolve Bmad issue and proceed to play with CSR/CSR
       shielding capabilities (benchmarking with elegant if possible)
     - PERLE: proceed with PERL analysis - really need some results
       for multiple turns. Suspect they are doomed too.

Randy Gamage

   Previous two weeks (Sep 18-Sep 29)
     - Dissertation writing: Continue coasting beam chapter, tech note
   Next two weeks (Oct 2-Oct 13)
     - Dissertation writing: Hopefully coasting beam chapter, tech note