2017-10-16

From Administrative
Revision as of 10:12, 16 October 2017 by Anichols (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Director - M. Spata
No report



Accelerator Physics - T. Satogata
Todd Satogata

   Previous two weeks (Oct 2-Oct 13)
     - OPS: BTeam (Oct 3), start ATLis cleanup
     - OPS: 12 GeV beam parameter meeting, notes to Alex
     - JLEIC: Prepare talk for BNL collaboration meeting
     - IPAC18: SPMS support work
     - JACOW: Team Meeting travel planning, organization
     - JLEIC: Continue assembling documents, pCDR meetings/planning
     - HALLD: Help McCaughan prepare slides for GlueX collab meet talk (Oct 12)
     - JLEIC: Collaboration Meeting (Oct 9-13)
     - ADMIN: Initiate annual review process
     - SICK: Oct 5
   Next two weeks (Oct 16-Oct 27)
     - OPS: BTeam (Oct 17), ATLis cleanup, ORFP update review
     - ADMIN: Peer review NIM paper (overdue)
     - IPAC18: Editorial board support, SPMS support work
     - JACOW: Team Meeting travel planning, organization
     - JLEIC: Continue assembling documents, pCDR meetings/planning
     - JLEIC: Booster injection scheme work (with Ed)
     - ADMIN: Weekly meetings with students (Randy, Eric)
     - ADMIN: Continue annual review process

Alex Bogacz

   Previous two weeks (Oct 2-Oct 13)
     - NUFACT: Write, finish paper for NUFACT'17 proceedings
     - USPAS: Continue work on lectures for "Practical Accelerator Design"
     - VACATION: Oct 6-13
   Next two weeks (Oct 16-Oct 27)
     - ADMIN: Peer review PRAB paper, annual review process
     - OPS: 12 GeV beam parameter meeting, notes
     - PERLE: End to end simulation development

David Douglas

   Previous two weeks (Oct 2-Oct 13)
     - JLEIC: continue with tilted solenoid: generate transfer matrix
       (numerical differentiation); start comparing to conventional
       modeling
     - JLEIC: continue responding to any results Chris develops on the simple
       CCR arcs and writing up the simple arc
     - ADMIN: talks for collaboration meeting, Bonn, and Daresbury
     - JLEIC: Gave talk on cooler test beds for EIC collaboration meeting
   Next two weeks (Oct 16-Oct 27)
     - ADMIN: Bonn travel, annual review process
     - JLEIC: continue with tilted solenoid: generate transfer matrix
       (numerical differentiation); start comparing to conventional
       modeling
     - JLEIC: continue responding to any results Chris develops on the
       simple CCR arcs and writing up the simple arc
     - JLEIC: write up kicker estimates to provide "straight merger"
       support.

Rui Li

   Previous two weeks (Oct 2-Oct 13)
     - VACATION: Oct 2-3
     - JLEIC: Prepare slides on collective effects for EIC collab meet
     - JLEIC: Collaboration Meeting (Oct 9-13)
   Next two weeks (Oct 16-Oct 27)
     - ADMIN: read/edit manuscript for Cheng-Ying
     - JLEIC: Follow up on collaboration meeting collective effects
     - JLEIC: Start documenting collective effects in tech note

Ed Nissen

   Previous two weeks (Oct 2-Oct 13)
     - JLEIC: figure out the best way of combatting injection
       synchrobetatron coupling and hopefully get a good injection
       simulation going. Reading up on injection methods.
     - JLEIC: Listening in on EIC collaboration meeting
     - VACATION: Oct 9
   Next two weeks (Oct 16-Oct 27)
     - JLEIC: Finish injection literature search
     - JLEIC: Improve injection scheme, coordinate parameters with Todd
     - VACATION: Oct 20

Chris Tennant

   Previous two weeks (Oct 2-Oct 13)
     - PERLE: microbunching analysis for first full turn of PERLE
       (it's bad)
     - ADMIN: read/edit manuscript for Cheng-Ying
     - CSR: read and work through PRSTAB on CSR published several
       weeks ago
     - JLEIC: continue to understand discrepancy between Bmad and
       other codes
     - JLEIC: microbunching analysis for multiple turns in CCR - looks
       good
   Next two weeks (Oct 16-Oct 27)
     - JLEIC: (hopefully) model CCR arc in Bmad with CSR shielding
     - JLEIC: next steps for e-cooler...?

Randy Gamage

   Previous two weeks (Oct 2-Oct 13)
     - Dissertation writing: Continue coasting beam chapter, tech note
   Next two weeks (Oct 16-Oct 27)
     - Dissertation writing: Hopefully coasting beam chapter, tech note



Accelerator R and D - Y. Zhang

Fanglei Lin

  • Continued optimization of detector region optics in the electron collider ring.
  • Prepared the presentation and attended EIC collaboration meeting at BNL.
  • Miscellaneous: attended CASA group meeting, attended the JLEIC R&D meeting, attended JLEIC parameter coordination meeting.


Vasiliy Morozov

  • Preparation for and participation in the EIC collaboration meeting: talks on polarization dynamics and interaction region design.
  • Geometry tagging LDRD: preparation and submission of a project data sheet.
  • Planning design and R&D activities.

Activities planned in the upcoming two weeks:

  • Preparation of a 45 min talk for the 2017 Accelerator R&D PI Exchange Meeting.
  • Preparation of a presentation for the ICFA Mini-Workshop on Dynamic Apertures of Circular Accelerators.
  • Preparation and submission of the final report on the 2017 LDRD geometry tagging project.
  • Presentation on the beam polarization design at a Wednesday detector meeting.
  • Planning collaboration with SLAC and BNL.


Amy Sy

  • Started preparing draft documentation for JLEIC ion source requirements. Met with Matt Poelker and others to discuss a path forward for the atomic beam polarized ion source SBIR with Muons, Inc. Will likely revise the SBIR proposal to focus on a D- ion source for JLEIC/as a polarimeter in CEBAF.
  • Data analysis for Geometry Tagging LDRD: continued generating plots of nuclear thickness and yield as a function of relative rigidity and A of nuclear remnant for detected particles through the ion downstream final focus triplet. Began plotting similar plots for the second data set using density-weighted distance data.
  • Attended the EIC Collaboration Meeting at BNL.


Yuhong Zhang

  • Attended EIC collaboration meeting at BNL, prepared/gave a talk
  • Completed a revision of staged cooling scheme



Computational Physics - Y. Roblin
No report



Diagnostic Development - K. Jordan

Kevin Jordan

  • Submitted requisition for $371k worth of waveguide for LERF project
  • Continued updating wiki
  • Waveguide review posted to https://wiki.jlab.org/lerf/index.php/Reviews
  • Working to finish Safety Assessment document, update schedule
  • Cryomodule shuffle has begun, first is to secure the vacuum on the 3 modules w/clean tent


Joe Gubeli

  • This week I finished up the LCLS-II waveguide layout. We had a review that went well. A list of the WG components were made and you generated a purchase requisition.
  • A little time was spent on cleaning up Lab 2.
  • Had a conservation with Bryce to talk about the upcoming experiment.


Mike Tiefenback

  • Working on JPos17 contributions plus I am reviewing the antiparallel acceleration mode with Wojtsekhowski. There may be options available to reduce exposure to C100 radiation damage.
  • Still trying to begin mass flow conversation, configure SLM expansion proposal for Arc 10, and get a start on characterizing/demonstrating optical resolution experimentally, prior to diagnostic installation. *Plus X-ray direct imaging.



LERF - S. Benson
October 2-13

  • Prepared presentation for EIC collaboration meeting
  • Attended EIC collaboration meeting.

October 16-27

  • Finish writing up papers for COOL17 and JPos17
  • Prepare presentation for EINN meeting
  • Finish Research plan for Cooler ring.