2017-Apr-28 Accel. Phys. Biweekly Report

From Administrative
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

   Previous two weeks (Apr 17-Apr 28)
     - PRAB article review (finish)
     - IPAC17: Light peer review of two articles
     - IPAC18: Start SPC committee abstract reviews, SPC/2 preparation
     - ADMIN: Leadership training (Apr 21)
     - JLEIC: Ion integration meeting, prep, and notes
     - JLEIC: Ramp design, development for Booster parameters
     - IPAC17: Student poster booklet layout/production
     - USPAS: director committee telecon, calls
     - OPS: BTeam (Apr 25) prep and notes
   Next two weeks (May 1-May 12)
     - IPAC18: SPC committee abstract reviews, SPC/2 preparation
     - JLEIC: Ramp design, development for Booster parameters
     - JLEIC: Ion integration, email exchange with ANL linac personnel
     - USPAS: director committee telecon (app deadline Thu May 4)
     - OPS: BTeam (May 2?) prep and notes
     - VACATION: May 5
     - IPAC17 TRAVEL: May 9-12

Alex Bogacz

   Previous two weeks (Apr 17-Apr 28)
     - IPAC paper prep (Booster optics, ER@CEBAF)
     - PRAB article review
     - ERL'17 and NuFact'17 SPC meetings
     - PERLE: prep and start mini start to end simulations
   Next two weeks (May 1-May 12)
     - IPAC paper completion and poster prep
     - PRAB publications standards presentation prep for IPAC meet
     - PERLE: start work on longitudinal matching

David Douglas

   Previous two weeks (Apr 17-Apr 28)
     - VACATION: Apr 19-25
     - JLEIC: Beam exchange kicker simulations, adding details and
       learning about details of kicker dynamics from Fay; sufficient
       complications ensue that full detail multiturn simulations are
       very likely required
     - ADMIN: Assembling references for Richard York re DIMAD/FEL
   Next two weeks (May 1-May 12)
     - JLEIC: Complete and write up reqs doc for CCR arcs
     - JLEIC: Write up ERL/CCR architecture reqs/tradeoffs
     - JLEIC: Work through/write up CCR LSC effects estimate
     - JLEIC: Write up "Life Hacks" for magnetized beam
     - Start work on broader technology note for high energy ecooling
     - Start work on current ERL state of art and low-risk extrapolations

Rui Li

   Previous two weeks (Apr 17-Apr 28)
     - IPAC18: Finish paper prep (JLEIC collective effects)
     - JLEIC: Re-do some ion ring calculations with modified parameters
     - IPAC18: Review previous transient CSR impedance work for paper prep
     - Evaluate impedance mode contributions to coupled bunch instabilities
     - Coordinate impedance mode contributions with Jiquan cavity design
   Next two weeks (May 1-May 12)
     - IPAC18: Write paper/poster on transient CSR impedance
     - IPAC18: Prepare poster for JLEIC collective effects
     - JLEIC: Attend meetings (cooler, R&D, etc)

Ed Nissen

   Previous two weeks (Apr 17-Apr 28)
     - IPAC18: paper/poster prep (Booster SC, beam-beam sims)
     - JLEIC: Improve fidelity of Booster injection/SC simulations
   Next two weeks (May 1-May 12)
     - IPAC18: Finish papers and prep posters for travel

Chris Tennant

   Previous two weeks (Apr 17-Apr 28)
     - Reading through Cheng-Ying's dissertation
     - ERL'17: Continue CSR talk prep (synthesize info from talks/papers)
     - JLEIC: S2E cooler work and simulations, code comparisons
   Next two weeks (May 1-May 12)
     - ERL'17: Begin papers
     - JLEIC: S2E cooler work and simulations (depends on front end sims)
     - Start planning for FFAG workshop talk on ERL longitudinal dynamics

Randy Gamage

   Previous two weeks (Apr 17-Apr 28)
     - JLEIC: Coasting beam instability calculations/simulations
     - Dissertation writing
   Next two weeks (May 1-May 12)
     - JLEIC: Finish coasting beam instability calculations/simulations
     - Dissertation writing