https://wiki.jlab.org/casa-adminwiki/index.php?title=2017-Feb-03_Accel._Phys._Biweekly_Report&feed=atom&action=history
2017-Feb-03 Accel. Phys. Biweekly Report - Revision history
2024-03-28T17:54:00Z
Revision history for this page on the wiki
MediaWiki 1.35.7
https://wiki.jlab.org/casa-adminwiki/index.php?title=2017-Feb-03_Accel._Phys._Biweekly_Report&diff=383&oldid=prev
Anichols: Created page with "Todd Satogata Previous two weeks (Jan 23-Feb 3) - USPAS (through Sat Jan 28) - OPS: Hall D run setup, BTeam, optics support - IPAC18: SAB invitations -..."
2017-02-07T18:33:21Z
<p>Created page with "Todd Satogata Previous two weeks (Jan 23-Feb 3) - USPAS (through Sat Jan 28) - OPS: Hall D run setup, BTeam, optics support - IPAC18: SAB invitations -..."</p>
<p><b>New page</b></p><div>Todd Satogata<br />
Previous two weeks (Jan 23-Feb 3)<br />
- USPAS (through Sat Jan 28)<br />
- OPS: Hall D run setup, BTeam, optics support<br />
- IPAC18: SAB invitations<br />
- JLEIC: Collective effects, spreadsheet planning; R&D meet<br />
- JLEIC: Start participating in GHOST collaboration meetings<br />
- ADMIN: various meetings (Randy, EricT, start reviews)<br />
- ADMIN: Student SULI/REU recommendation letters<br />
Next two weeks (Feb 6-Feb 17)<br />
- JACoW: board of directors telecon<br />
- ADMIN: Annual review meetings, CASA group meet<br />
- OPS: Hall D run setup/support; BTeam org, beam studies; Optics Feb 7-14<br />
- HALLD: GlueX collaboration meeting (Feb 16-18)<br />
- IPAC18: SPC invited talk proposals<br />
- JLEIC: 4/3 Gear changing simulations for GHOST paper<br />
- JLEIC: Longitudinal simulations, reading impedance papers<br />
<br />
Alex Bogacz<br />
Previous two weeks (Jan 23-Feb 3)<br />
- Publication survey report (APS publication committee)<br />
- Vacation (Jan 4-6)<br />
- OPS: Optics on call Jan 31-Feb 7<br />
- PRAB article review<br />
Next two weeks (Feb 6-Feb 17)<br />
- PERLE: continue lattice re-design, Feb trip/presentation prep<br />
- OPS: Optics support, injector match evaluation<br />
<br />
David Douglas<br />
Previous two weeks (Jan 23-Feb 3)<br />
- JLEIC: Axially symmetric arc optics, tech note development<br />
for CCR optics requirements, including initial optimization<br />
- JLEIC: Evaluate impacts of emittance exchange, optics transport<br />
constraints. Appears underconstrained.<br />
- ADMIN: Chen-Ying Tsai recommendation letters<br />
Next two weeks (Feb 6-Feb 17)<br />
- JLEIC: Finish up emittance exchange, including example;<br />
document.<br />
- JLEIC: Continue work on CCR arc requirements tech note and<br />
arc design.<br />
- PERLE: Feb trip/presentation preparation (operations driven I&C)<br />
<br />
Ed Nissen<br />
Previous two weeks (Jan 23-Feb 3)<br />
- JLEIC: Finished draft of PRSTAB paper on beam-beam calculations,<br />
started iterating with Daniel Schulte at CERN<br />
- JLEIC: Start working on implementing gear changing script model for<br />
Guinea Pig for 4/3 gear changing evaluation<br />
- JLEIC: Prepare, present talk on beam-beam calculations at<br />
R&D meeting<br />
- JLEIC: Started discussions with Todd on Booster injection design<br />
Next two weeks (Feb 6-Feb 17)<br />
- JLEIC: Continue evaluating/planning Booster injection design<br />
- JLEIC: Continue implementing gear changing script model for<br />
Guinea Pig for 4/3 gear changing evaluation<br />
- JLEIC: Continue writing PRSTAB paper draft on beam-beam sims<br />
- Move more boxes into new house<br />
<br />
Chris Tennant<br />
Previous two weeks (Jan 23-Feb 3)<br />
- JLEIC: studies of a magnetized beam through a non-axisymmetric arc with CSR<br />
- JLEIC: simulations of compensating CSR with RF cavity in the CCR<br />
- JLEIC: simulations of ERL arc for 2 nC (rather than 420 pC)<br />
- JLEIC: summarize previous work done on merger designs for ERL<br />
Next two weeks (Feb 6-Feb 17)<br />
- JLEIC: more cooler work (direction of which will depend on action<br />
items generated at next cooler meeting)<br />
- JLEIC: simulate emittance measurements of multi-component beams<br />
<br />
Randy Gamage<br />
Previous two weeks (Jan 23-Feb 3)<br />
- USPAS: TA for Accelerator Physics course (Jan 15-28)<br />
- JLEIC: Develop BLonD simulations of debunch/rebunch with impedance<br />
- JLEIC: Continue writing outlines of initial dissertation chapters<br />
Next two weeks (Feb 6-Feb 17)<br />
- JLEIC: Continue BLonD simulations of debunch/rebunch with impedance<br />
- JLEIC: Longitudinal impedance reading</div>
Anichols