2017-Feb-03 Accel. Phys. Biweekly Report

From Administrative
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Todd Satogata

  Previous two weeks (Jan 23-Feb 3)
    - USPAS (through Sat Jan 28)
    - OPS: Hall D run setup, BTeam, optics support
    - IPAC18: SAB invitations
    - JLEIC: Collective effects, spreadsheet planning; R&D meet
    - JLEIC: Start participating in GHOST collaboration meetings
    - ADMIN: various meetings (Randy, EricT, start reviews)
    - ADMIN: Student SULI/REU recommendation letters
  Next two weeks (Feb 6-Feb 17)
    - JACoW: board of directors telecon
    - ADMIN: Annual review meetings, CASA group meet
    - OPS: Hall D run setup/support; BTeam org, beam studies; Optics Feb 7-14
    - HALLD: GlueX collaboration meeting (Feb 16-18)
    - IPAC18: SPC invited talk proposals
    - JLEIC: 4/3 Gear changing simulations for GHOST paper
    - JLEIC: Longitudinal simulations, reading impedance papers

Alex Bogacz

  Previous two weeks (Jan 23-Feb 3)
    - Publication survey report (APS publication committee)
    - Vacation (Jan 4-6)
    - OPS: Optics on call Jan 31-Feb 7
    - PRAB article review
  Next two weeks (Feb 6-Feb 17)
    - PERLE: continue lattice re-design, Feb trip/presentation prep
    - OPS: Optics support, injector match evaluation

David Douglas

  Previous two weeks (Jan 23-Feb 3)
    - JLEIC: Axially symmetric arc optics, tech note development
      for CCR optics requirements, including initial optimization
    - JLEIC: Evaluate impacts of emittance exchange, optics transport
      constraints. Appears underconstrained.
    - ADMIN: Chen-Ying Tsai recommendation letters
  Next two weeks (Feb 6-Feb 17)
    - JLEIC: Finish up emittance exchange, including example;
      document.
    - JLEIC: Continue work on CCR arc requirements tech note and
      arc design.
    - PERLE: Feb trip/presentation preparation (operations driven I&C)

Ed Nissen

  Previous two weeks (Jan 23-Feb 3)
   - JLEIC: Finished draft of PRSTAB paper on beam-beam calculations,
            started iterating with Daniel Schulte at CERN
   - JLEIC: Start working on implementing gear changing script model for
            Guinea Pig for 4/3 gear changing evaluation
   - JLEIC: Prepare, present talk on beam-beam calculations at
            R&D meeting
   - JLEIC: Started discussions with Todd on Booster injection design
  Next two weeks (Feb 6-Feb 17)
   - JLEIC: Continue evaluating/planning Booster injection design
   - JLEIC: Continue implementing gear changing script model for
            Guinea Pig for 4/3 gear changing evaluation
   - JLEIC: Continue writing PRSTAB paper draft on beam-beam sims
   - Move more boxes into new house

Chris Tennant

  Previous two weeks (Jan 23-Feb 3)
    - JLEIC: studies of a magnetized beam through a non-axisymmetric arc with CSR
    - JLEIC: simulations of compensating CSR with RF cavity in the CCR
    - JLEIC: simulations of ERL arc for 2 nC (rather than 420 pC)
    - JLEIC: summarize previous work done on merger designs for ERL
  Next two weeks (Feb 6-Feb 17)
    - JLEIC: more cooler work (direction of which will depend on action
      items generated at next cooler meeting)
    - JLEIC: simulate emittance measurements of multi-component beams

Randy Gamage

  Previous two weeks (Jan 23-Feb 3)
    - USPAS: TA for Accelerator Physics course (Jan 15-28)
    - JLEIC: Develop BLonD simulations of debunch/rebunch with impedance
    - JLEIC: Continue writing outlines of initial dissertation chapters
  Next two weeks (Feb 6-Feb 17)
    - JLEIC: Continue BLonD simulations of debunch/rebunch with impedance
    - JLEIC: Longitudinal impedance reading