2017-Mar-03 Diagnostic Development Biweekly Report

From Administrative
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Kevin:

  • I worked on CRADAs trying to get $ in house
  • Started the review of SBIR titled CNT wires for HEP...
  • Also data acquisition for the IMP project & visa application
  • a few days leave to attend the AVS meeting in San Diego


Joe G:

  • Telecentric imager. Figured out why this imager didn’t work when we installed it in CEBAF. I&C had though that the voltage output of the illuminator was 24V. It is instead 12V. We will need about 42mA for a nice bright image with the larger 2-3/4CF viewport. This imager is really designed for this type of viewport and I believe we will need to wait till after this run so we can change out the viewport.
  • Non-telecentric imager. Works well with either viewport. Did find that the camera that we had used for radiation damage test appears to be radiation damaged.
  • GTS LDRDS. Kevin repaired the BNNT foil and we installed the fork assembly in the chamber. I’ll work on adding the other flanges to the chamber today.


Mike T:

  • I took one morning of leave on 28 Feb
  • I spent most of my past two weeks doing the following things, in approximately decreasing order of effort:
    • Finishing and transmitting the requirements for the dogleg calculator algorithms to Dennis Turner
    • Examining use cases for the dogleg calculator to ensure that operator-driven features were appropriate
    • Initiating discussions with Eugene Chudakov and Richard Jones about a prospective gamma harp for Hall D
    • Formulating test plans to demo the dogleg calculator functions G and diagnose optics issues in 2R
    • Continuing consultation with Brandi on Hall B procedures and dead-reckoning steering for CLAS12
    • Discussions with visitor Timothy Maxwell from SLAC on beam diagnostics, puzzles and solutions
    • Preparation for late March presentation to CLAS12 Collaboration Meeting