2017-Mar-17 Accel. Phys. Biweekly Report

From Administrative
Revision as of 09:41, 1 May 2017 by Anichols (talk | contribs) (Created page with " Todd Satogata Previous two weeks (Mar 6-Mar 17) - OPS: BTeam org, beam studies planning, Hall C KPP support - ODU: Review PhD theses for Kirsten Deitrick, Ahm...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Todd Satogata

   Previous two weeks (Mar 6-Mar 17)
     - OPS: BTeam org, beam studies planning, Hall C KPP support
     - ODU: Review PhD theses for Kirsten Deitrick, Ahmad Sheikhzadah
     - JLEIC: Continue work/meetings on ion bunch formation strategy
     - JLEIC: Start writing ramp calculator code to evaluate/plot synchrotron ramps
     - JLEIC: Collective effects, spreadsheet planning and nagging; R&D meet
     - JLEIC: Finish impedance theory work, start longitudinal simulations
     - JLEIC: Evaluate evol beam-beam code, present at biweekly simulation meet
     - IPAC18: Start organizing ideas for invited talk proposals (SPC task)
     - ADMIN: Eric Thompson meetings, research input
     - ADMIN: Prepping for Elon documentary student visit Mar 20-22
     - JACOW: COOL'15 proceedings published on JACoW website Mar 9
   Next two weeks (Mar 20-Mar 31)
     - ADMIN: Elon documentary student visit Mar 20-22
     - ODU: PhD defenses for Kirsten Deitrick (Mar 21), Ahmad Sheikhzadah (Mar 28)
     - IPAC18: Organize/submit ideas for invited talk proposals (deadline Mar 31)
     - IPAC18: Review/clean up invited talk proposals for committee evaluation
     - JLEIC: Develop/document ion bunch formation strategy
     - JLEIC: Collective effects, spreadsheet planning and nagging; R&D meet
     - JLEIC: Start 4/3 gear changing simulations for GHOST paper, evol beam-beam sims
     - JLEIC: Prep talks for Apr 3-5 collaboration meeting
     - ADMIN: Eric Thompson meetings, research input

Alex Bogacz

   Previous two weeks (Mar 6-Mar 17)
     - PRL article review
     - PERLE: Iterate mini-PERLE design with longer magnets (per CERN)
     - JLEIC: Booster input to Todd re injection/parameters
     - ADMIN: Invention dicsclosures review, TRC meeting
   Next two weeks (Mar 20-Mar 31)
     - PERLE: Optics optimization with longer magnets, larger footprint
     - USPAS: Practical lattice design course development
     - ADMIN: SPC meetings (ERL'17, NuFact'17)
     - JLEIC: Incidental design meetings

David Douglas

   Previous two weeks (Mar 6-Mar 17)
     - Finished write-up of transverse/longitudinal EmEx (JLAB-TN-17-008)
     - Reviewed numerous proposals as part of US/Japan Panel Review
       (Gaithersburg, 3/6)
     - Provided input to Shawn Frierson on LERF operational procedures
     - Did markup on forthcoming JLAB-TN on ERL-based single-pass
       cooler (Tennant, Douglas, Benson, & Hannon)
     - Did markup on Project E journal article in preparation
       (Akkermanns, Setija, (ASML), Di Mitri (FERMI@Elletra), &
       Douglas)
     - Cooked up a way to double CEBAF momentum acceptance; draft TN
       attached (waiting on co-author review before releasing)
     - Laid out/evaluated solution for CCR/ERL beam exchange system
       (1st iterate 75% complete; still have to do ERL-to-exchange
       transport match)
   Next two weeks (Mar 20-Mar 31)
     - Complete beam exchange and write up
     - Write up ERL/CCR architecture requirements/trades
     - Write up "Life Hacks" for magnetized beam
     - Complete and write up requirements document for CCR arcs
     - Start work on CCR design

Rui Li

   Previous two weeks (Mar 6-Mar 17)
     - JLEIC: Continue estimation of single-bunch instability effects
     - JLEIC: Start estimation of coupled-bunch instability effects based
       on collected parameters
     - ADMIN: Continue reading, commenting on Cheng-Ying's dissertation
     - ADMIN: Prep for Mar 20-21 travel to Va Tech for Chang-Ying's defense
   Next two weeks (Mar 20-Mar 31)
     - ADMIN: PhD Defense for Cheng-Ying (Mon-Tue at Virginia Tech)
     - JLEIC: Prepare slides and present status on instability estimates
       for R&D meeting
     - JLEIC: Update impedance parameters/estimations from engineering input
     - JLEIC: Prep talk for Apr 3-5 collaboration meeting

Ed Nissen

   Previous two weeks (Mar 6-Mar 17)
     - JLEIC: Collider, Guinea pig beam-beam simulations for cross-code comparison
     - JLEIC: Booster, Work on trying to get injection simulation working in
       Synergia
     - JLEIC: Booster, Start running space charge simulations using new
       parameter set from Todd; shift to sims at midpoint and extraction
       to make progress
   Next two weeks (Mar 20-Mar 31)
     - JLEIC: Continue space charge simulations with new parameter set,
       continuing middle and high energy and fixing injection parameter sets
     - JLEIC: Start documenting beam-beam and space charge simulation work

Chris Tennant

   Previous two weeks (Mar 6-Mar 17)
     - JLEIC Cooler: S2E analysis complete for single-pass ERL cooler
     - Organize and write tech note of results thus far (JLAB-TN-17-009)
   Next two weeks (Mar 20-Mar 31)
     - JLEIC Cooler: Translate Dave Douglas's emittance exchange to elegant and
       begin pushing particles
     - JLEIC Cooler: Start circulator cooler ring (CCR) simulation
       efforts (details to be determined in next meeting)
     - ADMIN: Begin ERL17 outline / organize thoughts

Randy Gamage

   Previous two weeks (Mar 6-Mar 17)
     - JLEIC: Continue BLonD simulations of debunch/rebunch with impedance
     - JLEIC: Continue Longitudinal impedance reading, calculations
     - JLEIC: Continue writing outlines of initial dissertation chapters
   Next two weeks (Mar 20-Mar 31)
     - JLEIC: Continue writing outlines of initial dissertation chapters,
       impedance calculations and theory
     - JLEIC: Figure out BLonD simulation bug (non-periodicity) and
       simulate coasting beam uwave instability, compare to theory