2018-05-11

From Administrative
Revision as of 09:38, 14 May 2018 by Anichols (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Director - M. Spata
No report. Acting Accelerator Division Head.



Accelerator Physics - T. Satogata
Todd Satogata

  Previous two weeks (Apr 31-May 11)
     - IPAC18: Scientific secretariat work (student program, light peer review)
     - JLEIC: pCDR writing, template, EIC lunch, visitors (Peggs,
  Next two weeks (May 14-May 25)
     - JLEIC: pCDR writing, template, EIC lunch, impedance and R&D meetings
     - JLEIC: P&C Meeting (May 21)
     - ODU: Continue Randy advising, presentation to committee (May 24)
     - ADMIN: Leadership/group meetings, staffing input and planning
     - ADMIN: Prepare for summer student arrivals
     - IPAC18: Complete proceedings, light peer review, delegate survey
     - OPS: BTeam meetings, Hall D optics analysis

Alex Bogacz

   Previous two weeks (Apr 31-May 11)
     - IPAC18: Apr 31-May 4 (light peer review)
     - VACATION: May 7-11
   Next two weeks (May 14-May 25)
     - IPAC18: Light peer review development
     - PERLE process followup

Rui Li

   Previous two weeks (Apr 31-May 11)
     - IPAC18: Apr 31-May 4 (delegate)
     - IPAC18: CSR meeting with experts in field, path forward in field
       for theory, simulation, and experiment
     - JLEIC: Clean up IPAC papers, start pCDR documentation
     - JLEIC: Prepare for impedance meeting
   Next two weeks (May 14-May 25)
     - JLEIC: Impedance meeting (May 14)
     - JLEIC: Work on pCDR writeup
     - VACATION: (May 17-18)

Ed Nissen

   Previous two weeks (Apr 31-May 11)
     - JLEIC: Finalize IPAC paper
     - JLEIC: Reading up on octupole detuning, set up madx optimization
     - JLEIC: initial draft writing for pCDR
   Next two weeks (May 14-May 25)
     - JLEIC: Finish draft writing for pCDR
     - JLEIC: Continue booster nonlinear optimization work

Chris Tennant

   Previous two weeks (Apr 31-May 11)
     - IPAC18: Apr 31-May 4 (delegate)
     - IPAC18: Finish IPAC papers and documentw rok
   Next two weeks (May 14-May 25)
     - ADMIN: Migrate laptops (to Dave's old one)
     - JLEIC: translate DIMAD ERL-to-CCR transport to elegant
       to build up full S2E of cooler
     - PERLE: Continued CSR analysis



Accelerator R & D - Y. Zhang



Computational Physicss - Y. Roblin



Diagnostic Development - K. Jordan



LERF - S. Benson
April 30-May 11

  • Worked on preparing the LERF for the isotope visit
  • Hosted Cooler ring meeting May 9th (no quorum for the meeting on the 2nd) and wrote up minutes
  • Prepared and presented talk for IOTA/FAST workshop and held discussions with NIU grad students about the FOA work.
  • Started putting together AWP for FOA proposal
  • Hosted visit from Steve Peggs for CBETA discussions

May 14-25

  • Arrange for collaboration with HZDR for Elbe II facility.
  • Complete AWP for FOA proposal
  • Derive draft budget for isotope production
  • Revise LOD to match new ASE document.
  • Continue cleaning up the LERF for isotope visit.
  • Attend teleconference with DOE for isotope project.