2018-07-06

From Administrative
Revision as of 09:36, 9 July 2018 by Anichols (talk | contribs) (Created page with "'''Director - M. Spata <br>''' ''No report.'' Accelerator Division Office. ---- '''Accelerator Physics - T. Satogata (Interim CASA Department Head)'''<br> Todd Satogata...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Director - M. Spata
No report. Accelerator Division Office.



Accelerator Physics - T. Satogata (Interim CASA Department Head)
Todd Satogata

  Previous two weeks (June 25-July 6)
     - JLEIC: pCDR writing, template, EIC lunch, impedance/HE/R&D meetings
     - JLEIC: Peter McIntyre meeting (Jun 26)
     - JLEIC: Summer student work on Booster simulations, training
     - JACoW: JBoD telecon (Jun 29), post/review meeting minutes
     - ADMIN: Leadership/group meetings, staffing input and planning
     - ADMIN: Director Ops review (Jun 26-28)
     - ODU: Continue Randy advising, dissertation draft finalization
  Next two weeks (July 9-July 20)
     - ADMIN: Leadership/group meetings, staffing input and planning
     - ADMIN: Audrey move transition, Li-Shi meeting (Jul 16)
     - JLEIC: pCDR writing, template, EIC lunch, impedance/HE/R&D meetings
     - JLEIC: Complete Booster vacuum tech note calculations
     - JLEIC: Summer student work on Booster simulations, training
     - IPAC18: Finalize proceedings, IPAC'18 delegate survey report
     - JACoW: Publishing script updates, fix PDF index of PAC'95
     - ODU: Randy PhD defense (Jul 12)

Alex Bogacz

   Previous two weeks (June 25-July 6)
     - PERLE: Attend PERLE collaboration meeting (Jun 26, Orsay)
     - PERLE: Attend LHeC/FCCeh/PERLE workshop (Jun 27-29, Orsay)
     - PERLE: Present two talks at above meetings
     - ADMIN: Attend ARIES Muon Collider Workshop (Jul 1-3, Padova)
     - ADMIN: Present two talks at ARIES Muon Collider Workshop
   Next two weeks (July 9-July 20)
     - VACATION: Jul 9-Jul 13
     - ADMIN: Phys Rev Accel Beams paper review

Rui Li

   Previous two weeks (June 25-July 6)
     - JLEIC: Presented the LCBI for Frank's new HOM coupler design at
       the impedance meeting.
     - JLEIC: Assessment of the behavior of collective effects in
       higher current regime of e-beam (E>10GeV), in responding to
       Yuhong's question for the high-energy JLEIC.
     - JLEIC: Collected the e-ring new parameters from Fanglei,
       Vasiliy will later send me new parameters for the p-ring. These
       may change the behavior of LCBI which is very sensitive to
       parameters.
     - JLEIC: Calculated growth time for the transverse coupled bunch
       instability (TCBI) for Frank's new HOM design using ZAP, and
       see no improvement of the growth rate for the new HOM coupler
       design from that of the old one.
     - JLEIC: Working on the Mathematica calculation of TCBI, so as to
       identify the HOM resonance that gives dominant contribution to
       growth rate, so the RF people can work on mitigation of these
       HOM.
   Next two weeks (July 9-July 20)
     - JLEIC: Finish my part of the ICFA newsletter writing
     - JLEIC: Continue to finish the Mathematica calculation of TCBI
       and its comparison with ZAP
     - JLEIC: Summarize the LCBI and TCBI results for exchange with
       the RF people
     - JLEIC: Estimate the resistive wall impedance in JLEIC e-ring
       and ion ring

Edy Nissen

   Previous two weeks (June 25-July 6)
     - JLEIC: Answered LDRD questions posed by reviewers
     - JLEIC: Created presentation slides for LDRD review
     - JLEIC: Determined that the acceleration anomaly in synergia is
       caused by space charge, not bucket shape changes or higher order
       nonlinear dispersions.
     - JLEIC: Gave LDRD Presentation
     - VACATION: June 25, July 2-3
   Next two weeks (July 9-July 20)
     - JLEIC: Work on booster working point simulations to eliminate
       the acceleration anomaly
     - JLEIC: Work with summer student on injection modeling for the
       booster

Chris Tennant

   Previous two weeks (June 25-July 6)
     - VACATION: July 5-6
     - JLEIC: working through issues with cooler to get a consistent S2E
     - JLEIC: re-tune ERL arc to accept longer bunch from injector
     - JLEIC: mBI analysis of cooler "Simple Arc"
     - PERLE: wrap up PERLE TN
   Next two weeks (July 9-July 20)
     - VACATION:  July 16-19
     - JLEIC: seek counsel for path forward with S2E
     - JLEIC: pCDR writing