Difference between revisions of "2019-05-01-LeadershipReports"

From Administrative
Jump to: navigation, search
 
Line 104: Line 104:
  
 
   Previous two weeks (May 13 - May 24)
 
   Previous two weeks (May 13 - May 24)
       - Completed IPAC2019-poster and submitted paper.
+
       -  
      - "CASA BeamBeam"
+
      - Revised, optimized and accelerated “Crab Kick” of “CASA BeamBeam” codes by using the High Performance Python Compiler,
+
        Numba. Based on JIT(Just in Time), Numba translates part of our “Crab Kick” Python functions to optimized machine code
+
        at runtime using the industry-standard LLVM compiler library.
+
      - Performance of “Crab kicking”
+
      - Simulations have been down for the JLEIC parameters again. For example, for the case CM Energy 21.9GeV, comparing with
+
        previous job, the “Numba” based “Crab Kick” codes can save 1/5 time than the old code for 4000 turn in a collider ring.
+
      - 3 Particles Spin Tracking
+
      - For Snakes 0o, 3 particles spin tracking was carried out again via revised “CASA BeamBeam”.
+
 
   Next two weeks (May 27 - June 7)
 
   Next two weeks (May 27 - June 7)
       - pyFMM will be under investigation.
+
       -  
      - Continue spin tracking study.
+
  
  

Latest revision as of 09:29, 28 May 2019

May 1, 2019 Report - Apr 29 - May 24

Director - Todd Satogata

  Previous two weeks (Apr 29 - May 10)
     - 
  Next two weeks (May 13 - May 24)
     - 

Alex Bogacz

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 

Rui Li

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     -  

Ed Nissen

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 

Chris Tennant

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 



Accelerator R & D - Yuhong Zhang

Fanglei Lin

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 



Vasiliy Morozov

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 
 


Amy Sy

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 



Yuhong Zhang

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 




Computational Physics - Yves Roblin
Yves Roblin

   CEBAF
     - 
    JLEIC:   
     -    
   OTHER
     - 


He Zhang

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 


River Zhang

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 



Diagnostic Development - Kevin Jordan

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     - 


Joe Gubeli

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     -  


Michael Tiefenback

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     -  



LERF - Steve Benson

  Previous two weeks (May 13 - May 24)
     - 
  Next two weeks (May 27 - June 7)
     -