(Created page with "Nov 7 2019 Report - Oct 28 - Nov 22 '''Director - Todd Satogata''' <br> Todd Satogata Previous two weeks (Oct 14 - Oct 25) - ADMIN 12 GeV PRAB paper planning...")
 
 
(3 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
Todd Satogata
 
Todd Satogata
  
   Previous two weeks (Oct 14 - Oct 25)
+
   Previous two weeks (Oct 28 - Nov 8)
      - ADMIN 12 GeV PRAB paper planning
 
      - ADMIN JLAAC review (Oct 22-24)
 
      - ADMIN FY20 AWP planning
 
      - ADMIN Xelera SBIR support planning
 
      - JLEIC/ER@CEBAF JLAAC dry runs and planning
 
      - JLEIC FOA quarterly report planning
 
      - ODU PHYS854 teaching (with Geoff Krafft)
 
      - OPS Walk Hall D line, run readiness evaluation
 
      - OPS Pre-brief half-day operator meeting (Oct 21)
 
      - VACATION Oct 14, half-day Oct 25
 
  Next two weeks (Oct 28 - Nov 8)
 
 
       - ADMIN 12 GeV PRAB paper planning
 
       - ADMIN 12 GeV PRAB paper planning
 
       - ADMIN FY20 AWP planning
 
       - ADMIN FY20 AWP planning
Line 23: Line 12:
 
       - JACOW Team Meeting travel preparation
 
       - JACOW Team Meeting travel preparation
 
       - IPAC'20 SPC/3 Meeting travel preparation
 
       - IPAC'20 SPC/3 Meeting travel preparation
 +
      - ODU PHYS854 teaching (with Geoff Krafft)
 +
  Next two weeks (Nov 11 - Nov 22)
 +
      - ADMIN 12 GeV PRAB paper planning/writing
 +
      - MGMT Continue annual appraisals, evaluations; AWP updates
 +
      - JLEIC R&D planning and organization, Michael Sullivan visit
 +
      - JACOW Team meeting preparations, IPAC'20 SPC/3 preparations
 +
      - OPS CEBAF startup support and planning
 
       - ODU PHYS854 teaching (with Geoff Krafft)
 
       - ODU PHYS854 teaching (with Geoff Krafft)
 +
 
   
 
   
  
Line 29: Line 26:
 
Alex Bogacz
 
Alex Bogacz
 
    
 
    
   Previous two weeks (Oct 14 - Oct 25)
+
   Previous two weeks (Oct 28 - Nov 8)  
      - Finishing a CDR chapter on the LHeC ERL design
 
      - PRAB paper review
 
      - Attending nuSTORM mtg at CERN
 
      - Attending Workshop on the LHeC, FCC-eh and PERLE, Chavannes-de-Bogis
 
  Next two weeks (Oct 28 - Nov 8)
 
 
       - Alternative lattice for the LHeC ERL
 
       - Alternative lattice for the LHeC ERL
 
       - Invention disclosures review
 
       - Invention disclosures review
 
       - Appraisals
 
       - Appraisals
 
       - Vac
 
       - Vac
 
+
  Next two weeks (Nov 11 - Nov 22)
 +
      - Vac
 +
      - SBIR proposal review
 +
      - Lattice work for nuSTORM
 +
      - Chapter on the LHeC ERL Optics (The LHeC Technical Design Report )
  
  
Line 46: Line 42:
 
Rui Li
 
Rui Li
 
    
 
    
   Previous two weeks (Oct 14 - Oct 25)
+
   Previous two weeks (Oct 28 - Nov 8)
      - Discuss/explore Hassinski solution and Robinson instability with Bob Warnock (SLAC) and Marco Venturini (LBL)
 
      - Participate in the ALS-U impedance meeting and discussions
 
      - Schedule/plan the next JLEIC impedance meeting and potential talks
 
      - Assist ALS-U people to teach JLAB/ODU people on broadband impedance modeling using CST
 
  Next two weeks (Oct 28 - Nov 8)  
 
 
       - Prepare and present JLEIC impedance studies at JLEIC R&D meeting
 
       - Prepare and present JLEIC impedance studies at JLEIC R&D meeting
       - Participate multi-lab (LBL/SLAC/APS/NSLS-II) monthly seminar on collective effects in electron storage rings (I'm asked
+
       - Participate multi-lab (LBL/SLAC/APS/NSLS-II) monthly seminar on collective effects in electron storage rings (I'm asked to present the
        to present the next monthly seminar on collective effects in JLEIC)
+
        next monthly seminar on collective effects in JLEIC)
 
       - Continue my collaboration with ALS-U and SLAC on impedance and instability
 
       - Continue my collaboration with ALS-U and SLAC on impedance and instability
 +
      - Literature study on feedback systems for coupled-bunch instability
 +
      - Discuss with Frank Marhauser and Mark Wiseman on impedance progresses, and plan for the next JLEIC imepedance meeting
 +
  Next two weeks (Nov 11 - Nov 22)
 +
      - Organize JLEIC impedance meeting on 11/11
 
       - Finish writing up the technote on spectra for uneven bunch fill
 
       - Finish writing up the technote on spectra for uneven bunch fill
 +
      - Continue my collaboration with ALS-U and SLAC on impedance and instability
 +
      - Continue understanding of the feedback systems for coupled bunch instability
 +
      - Prepare and give presentation on "Collective Effects in Electron-Ion Colliders" for the inter-lab (SLAC/LBL/APS/NSLS-II/JLAB) tele-
 +
        seminar (focused on collective effects) on 11/22
 +
  
  
Line 64: Line 64:
 
Edy Nissen
 
Edy Nissen
 
    
 
    
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
       - Did some work with the LEB, trying to see if I can get more space in the lattice
+
       - Finished my proposal for the DESIREE experiment and submitted it, I have received confirmation that it is now with the review committee
       - Mostly coordinated with the people at DESIREE for the measurements they made for me on October 21, and 22.
+
      - Finished the decoupling system in the HEB now that a solenoid has been added
       - Analyzed the data they sent me and worked to finalize the proposal for beam time which is due the 31st.
+
       - Wrote up a tech note about the current design of the HEB
     Next two weeks (Oct 28 - Nov 8)
+
       - Am currently working on a description of the DESIREE experiment and the details gained from it
       - I will submit the proposal
+
     Next two weeks (Nov 11 - Nov 22)
      - Determine priorities for my work in the next two weeks.
+
       - I will be on extended medical leave
  
 
   
 
   
Line 77: Line 77:
 
Chris Tennant
 
Chris Tennant
 
    
 
    
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
       - Accelerator Advisory Committee meeting (slide preparation/dry-run/talk)
+
       - Division seminar prep
       - Employee self-evaluations
+
       - CEBAF PRAB manuscript work (verifying data with DT Manager)
       - Wrote draft of ML section for CEBAF PRAB paper
+
       - ML to model CEBAF pathlength (meet with Dennis T)
       - Preparing slides for Accelerator Seminar (11/14)
+
       - Autonomous robot meeting
       - Participated in initial telecon about using ML for magnetized beams (with ANL, SLAC)
+
       - Work with Gunn Tae on magnetized beam modeling
       - Start outline, initial sections for draft of SRF classifier paper (to be submitted for peer-review later in the year)
+
       - "Problem of the Quarter" for AI Lunch Series
     Next two weeks (Oct 28 - Nov 8)
+
      - BNL CeC meeting and slide prep for PI meeting in DC
       - Finish Accelerator Seminar talk
+
     Next two weeks (Nov 11 - Nov 22)
      - Continue work on SRF classifier paper
+
       - BNL CeC (telecon starting up again)
      - CeC effort starting up in earnest again (?)
+
      - JLEIC CCR (next approach)
       - JLEIC cooler effort ramping up again
+
       - Fine-tune ML models for SRF fault classifier in anticipation of fall run
 +
 
  
  
Line 97: Line 98:
 
Yuhong Zhang
 
Yuhong Zhang
  
   Previous two weeks (Oct 14 - Oct 25)
+
   Previous two weeks (Oct 28 - Nov 8)
       -
+
       - Attend the Accelerator R&D PI Exchange Meeting
   Next two weeks (Oct 28 - Nov 8)
+
   Next two weeks (Nov 11 - Nov 22)
       - Attend the Accelerator R&D PI Exchange Meeting
+
       -  
  
  
Line 123: Line 124:
 
Fanglei Lin
 
Fanglei Lin
  
   Previous two weeks (Oct 14 - Oct 25)
+
   Previous two weeks (Oct 28 - Nov 8)
         - Worked on the storage ring cooler project, and provided a quarterly report
+
         - Worked on the storage ring cooler project, and reported the progress in the storage ring cooler meeting
         - Revisiting electron top-off injection scheme for JLEIC
+
         - Revisited the electron top-off injection scheme for JLEIC
         - Miscellaneous: attended JLEIC R&D meeting, discussed introducing computation of DK depolarization rate using Zgoubi
+
         - Miscellaneous: attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler meeting, attended JLEIC R&D
          with Radiasoft collages, attended JLEIC general meeting, finished employee appraisal.  
+
          meeting, discussed introducing computation of DK depolarization rate using Zgoubi with Radiasoft colleagues, attended JLEIC detector
   Next two weeks (Oct 28 - Nov 8)
+
          meeting.  
         - Work on updating the interaction region design
+
   Next two weeks (Nov 11 - Nov 22)
 +
         - Evaluate the IR design for various electron energies
 
         - Work on the storage ring cooler project
 
         - Work on the storage ring cooler project
 +
        - Work on teaching material for a USPAS class
  
  
Line 138: Line 141:
 
Bhawin Dhital
 
Bhawin Dhital
 
    
 
    
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
 
       - Working on longitudinal dynamics and stability in two energy storage ring cooler.
 
       - Working on longitudinal dynamics and stability in two energy storage ring cooler.
       - Working on simulation to get the longer bunch length in the cooling section.
+
       - Working with new lattice. Dr Fanglei Lin has designed new optics for two energy storage ring cooler.
       - Introducing harmonic cavity and bunching cavity in two energy ring to get the longer bunch length in the cooling
+
       - Single and many particles tracking.
        section. Bunching cavity provides the focusing.
+
       - Understanding of bunching cavity phase and the stability based on particle tracking.
       - Results shows that we should go with shorter bunch length ≈ 1 cm.
+
     Next two weeks (Nov 11 - Nov 22)
     Next two weeks (Oct 28 - Nov 8)
+
       - Optimization of parameters in two energy storage ring design.
       - Will  be  working  on  longitudinal  dynamics  and  stability  in two energy storage ring.
+
       - Single and many particles tracking using new lattice.
       - Making clear presentation based on calculation and simulations for future plan.
+
       - Energy spread and bucket height simulation based on bunching cavity voltage.
      - Meeting with Dr Krafft for more discussion.
+
       - Preparing a talk for Nov 22 Friday "High innovative cooler meeting".
       - Should go with chirping and de-chirping along with other scheme in two energy ring.
 
       - Working with new lattice for two energy storage ring.(Dr Fanglei Lin has de-signed the new lattice).
 
  
  
Line 155: Line 156:
 
Vasiliy Morozov
 
Vasiliy Morozov
  
     Previous two weeks (Oct 14 - Nov 8)
+
     Previous two weeks (Oct 28 - Nov 8)
       - Optimization of the IBS rate in the ion collider ring -IR design: modeling of the detector region in GEMC and GEANT4 -Preparation for and attendance of the EIC
+
      - Attended EINN'19 and gave a presentation on the JLEIC and eRHIC designs
        collaboration meeting   
+
      - Attended the PI exchange meeting and presented the status of the transparent spin test project
     Next two weeks (Oct 14 - Oct 25)
+
      - Preparation for a trip to CERN to work on analysis of the SPS crab cavity test data
       - Attending APS DNP meeting
+
       - Optimization of the IBS rate in the JLEIC ion collider ring, meeting with V. Lebedev
       - Preparation for JLAAC meeting
+
      - Exploration of the chromaticity compensation options and magnet requirements in an IBS optimized ion collider ring lattice
       - Preparation for EINN meeting
+
     Next two weeks (Nov 11 - Nov 22)
 +
       - Work at CERN on the crab cavity test data analysis
 +
      - Continue exploration of the chromaticity compensation options and magnet requirements in an IBS optimized ion collider ring lattice
 +
       - Spin tracking for the transparent spin experiment
 +
       - Preparation for the EICUG Yellow Reports - Kick-off Meeting
  
  
Line 169: Line 174:
 
Amy Sy
 
Amy Sy
  
     Previous two weeks (Oct 14 - Oct 25):
+
     Previous two weeks (Oct 28 - Nov 8):
       - DOE pre-review teleconference for planning for LBNF/DUNE review.
+
       - Participation in the DOE independent project review of LBNF/DUNE. Chaired the subcommittee reviewing the Beamline WBS.
 +
      - Completed final report for LBNF/DUNE review.
 +
      - Continued work on heavy ion stripping chicane design in TRACK, particularly looking at longitudinal dynamics of stripped lead ions after
 +
        traversing a four dipole chicane.
 +
    Next two weeks (Nov 11 - Nov 22)
 +
      - Continued work on linac optimization for reduced transverse emittance.
 
       - Continued work on heavy ion stripping chicane design in TRACK and PyORBIT.
 
       - Continued work on heavy ion stripping chicane design in TRACK and PyORBIT.
       - Continued work on TRACK vs PyORBIT comparison for linac simulations. Compared longitudinal phase behavior at the
+
       - Continued work on TRACK vs PyORBIT comparison for linac simulations.
        transition between QWR and HWR sections in TRACK to the PyORBIT case, and will need to create a JLEIC-specific module
+
       - Preparation of abstracts for IPAC20.
        to properly evaluate this parameter, rather than relying on the SNS linac bunch module that is currently being used.
+
 
        Currently refining the RF cavity parameters in PyORBIT to better match the TRACK simulations, including working with
 
        multiple RF gaps per cavity for better approximation of field maps used in TRACK. 
 
    Next two weeks (Oct 28 - Nov 8)
 
       - Participating in the DOE independent project review of LBNF/DUNE.
 
      - Continued work on ion linac simulations.
 
  
  
Line 191: Line 196:
 
'''Computational Physics - Yves Roblin'''<br>
 
'''Computational Physics - Yves Roblin'''<br>
 
Yves Roblin
 
Yves Roblin
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
 
       - CEBAF:
 
       - CEBAF:
          - RAR reports
 
 
           - Bteam preparation/meetings
 
           - Bteam preparation/meetings
           - AI meetings
+
           - Preparing and investigating alternate schemes for reduced linac gradients
           - Optics for upcoming run
+
           - Schedule and coordination for startup
          - RF Pit meeting
 
          - Walking the beam line BSY/HALLA to reconcile with CED
 
          - Group meeting
 
 
       - JLEIC:
 
       - JLEIC:
           - Beam-Beam meetings with Isurumali
+
           - FOA PI meeting at DOE
           - Preparing for PI meeting
+
          - Re-scoping of FOA
           - 4th quarter report prep for FOA       
+
          - Meeting with student every week
 +
           - Meeting with CNU prof and JLab operations for use of drones in tunnel (AI)
 +
           - Organizing committee for AI workshop   
 
       - OTHER
 
       - OTHER
           - AWP preparations
+
           - Preparing lecture for SPIN2020 school. Initial gathering and writing of agenda
          - Evaluations
 
          - SLLP meetings/prepare for presentation in november
 
 
     Next two weeks (Oct 28 - Nov 8)
 
     Next two weeks (Oct 28 - Nov 8)
       - Complete evaluations
+
       - SLLP training in Chicago
       - Prepare optics for startup CEBAF
+
       - Machine startup
      - AI workshop local organizing committee meetings
+
 
  
  
Line 217: Line 218:
 
Randi Gamage
 
Randi Gamage
  
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
 
       - Next step of the orbit correction - correcting the beta function distortion  
 
       - Next step of the orbit correction - correcting the beta function distortion  
 
       - Investigating different multipole correction schemes.
 
       - Investigating different multipole correction schemes.
 
       - Jlab contribution to the quarterly report
 
       - Jlab contribution to the quarterly report
     Next two weeks (Oct 28 - Nov 8)
+
     Next two weeks (Nov 11 - Nov 22)
      - Add ion quad data in to DA studies (from last week)
+
       - Continue to correct beta distortion
       - Continue to correct beta function distortion
+
       - Continue different multipole correction schemes
       - Continue to investigate different Multipole corrector schemes  
+
  
 
   
 
   
Line 234: Line 235:
  
 
     Previous two weeks (Oct 28 - Nov 8)
 
     Previous two weeks (Oct 28 - Nov 8)
       - Transparent Spin Projet - We completed the CASA Curve-Fitting python codes based on the least square method. Using our CASA Curve-Fitting we can obtain the numerical
+
       - Transparent Spin Projet - We completed the CASA Curve-Fitting python codes based on the least square method. Using our CASA Curve-
        results of the spin resonance-strength, the spin field directions, the phases in spin resonance process, the average spin value and the amplitude. Again, OPERA field
+
        Fitting we can obtain the numerical results of the spin resonance-strength, the spin field directions, the phases in spin resonance
        maps with snakes’ parallel (the snake currents were varied using a fitting procedure to adjust the snake axis to 0°) has been put into RHIC’s lattice. After precisely
+
        process, the average spin value and the amplitude. Again, OPERA field maps with snakes’ parallel (the snake currents were varied using a
        adjusting the total bending angle of all of the dipole magnets to sum up to 2π, we tried to realize the spin transparent in a simulation for the RHIC’s configuration:
+
        fitting procedure to adjust the snake axis to 0°) has been put into RHIC’s lattice. After precisely adjusting the total bending angle of
         all of the spin components are constant from turn to turn with a good numerical precision. The four different cases of misalignments was introduced into same RHIC  
+
        all of the dipole magnets to sum up to 2π, we tried to realize the spin transparent in a simulation for the RHIC’s configuration: all of
        lattice, the spin tracking from 1 turn to 2000 turns was carried out and the spin resonance-strength was obtained.
+
         the spin components are constant from turn to turn with a good numerical precision. The four different cases of misalignments was
       - CASA Beam-Beam package - For the case β_1x^*≫σ_1x^*,β_2x^*≫σ_2x^*,  the analytical solution of the luminosity was derived by us. This new solution has been involved in
+
        introduced into same RHIC lattice, the spin tracking from 1 turn to 2000 turns was carried out and the spin resonance-strength was  
        CASA Beam-Beam package. For JLEIC Parameters and Luminosity Performance, we did the benchmarks. The results of our analytical solution and the numerical results are
+
        obtained.
        consistent.  
+
       - CASA Beam-Beam package - For the case β_1x^*≫σ_1x^*,β_2x^*≫σ_2x^*,  the analytical solution of the luminosity was derived by us. This
 +
        new solution has been involved in CASA Beam-Beam package. For JLEIC Parameters and Luminosity Performance, we did the benchmarks. The
 +
        results of our analytical solution and the numerical results are consistent.  
 
     Next two weeks (Nov 11 - Nov 22)
 
     Next two weeks (Nov 11 - Nov 22)
 
       - Continue working on EIC project
 
       - Continue working on EIC project
Line 250: Line 253:
 
Isurumali Neththikumara
 
Isurumali Neththikumara
  
     Previous two weeks ()
+
     Previous two weeks (Oct 28 - Nov 8)
       -  
+
       - Edited the script to output 6-D coordinates of a specific particle.
     Next two weeks ()
+
     Next two weeks (Nov 11 - Nov 22)
       -  
+
       - Calculation of Lyapunov exponent using the data obtained from BB3D simulations.
  
  
Line 260: Line 263:
 
Dennis Turner
 
Dennis Turner
  
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
       - Submitted ATLis for MultiWire testing.
+
       - I was out quite a bit due to having a loved one in the hospital.
      - qsUtility improvements.
+
       - 130keV emittance measurements.
       - Submitted ATLis for 6MeV matching.
+
       - qsUtility tweaks.
      - Completed 130keV emittance measurements.
+
       - Discussion with Chris Tennant about using ML for pathlength prediction.
       - Discussed handing some of my non-CASA software tools back to HLA with Michele.
+
       - elegant deck for Injector upgrade
       - Discussed future plans for rfHealthCheck with Clyde.
+
       - Modified the elegant 'view3dgeometry' tool to help with building the deck
       - Generated elegant layout for Injector upgrade.
+
       - Attended BTeam and AI lunch meetings.
       - Had a CED workspace created for the Injector upgrade
+
     Next two weeks (Nov 11 - Nov 22)
      - Setup computer with Keras and TensorFlow to start exploring ML.
 
       - Attended BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings.  
 
     Next two weeks (Oct 28 - Nov 8)
 
 
       - Analyze 130keV emittance measurement data.
 
       - Analyze 130keV emittance measurement data.
 +
      - Develop a separate tool for performing ansd analyzing 130keV emittance measurements
 
       - Continue work on assigned sections for the 12GeV PRAB paper.
 
       - Continue work on assigned sections for the 12GeV PRAB paper.
 
       - Configure optics for the Injector upgrade elegant deck.
 
       - Configure optics for the Injector upgrade elegant deck.
Line 279: Line 280:
 
       - Finish QTSnyder upgrade and write ATLis for testing
 
       - Finish QTSnyder upgrade and write ATLis for testing
 
       - Attend BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings.  
 
       - Attend BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings.  
 +
      - Assist with CEBAF startup as needed.
 +
 
   
 
   
  
Line 287: Line 290:
 
He Zhang
 
He Zhang
  
     Previous two weeks (Oct 14 - Oct 25)     
+
     Previous two weeks (Oct 28 - Nov 8)     
       - JSPEC - Updated the TWISS parameter loading function to improve the flexibility. Now the data column MUX and MUY are
+
       - JSPEC - Our colleague, Dr. Bruker, refactored the Martini model for IBS rate calculation and send a pull request to the github
        not required since they are not used in IBS calculation. TWISS parameter tables missing DY nad DPY are acceptable since
+
        repository. I doublechecked his work and revised slightly mostly for coding style. Inspired by his work, I refactored the Bjorken-
         in many cases the ring does not have vertical dispersion. I’m also adding the function of calculation and output the
+
         Mtingwa model. Since Bruker’s work is on the version before I added the IBS contribution by element feature, I implemented this again
        IBS contribution elememt by element to the UI. The other relatively large change in progress is revising the cooling
+
         after refactoring the IBS formulas.    
         rate calculation and the particle model, so that the average cooling rate for varying electron bunch can be used in the
+
       - Other - Prepared a few slides on cooling code development FOA for the DOE PI meeting.  
        particle model.  
+
     Next two weeks (Nov 11 - Nov 22)  
       - Beam beam effect - Help Yun Luo to set up and test the simulations using BB3D with high order map tracking or
+
      - Refactor electron cooling rate calculation. Revisit the particle model and the turn-by-turn model. Make sure they work well.
        symplectic tracking. Find and fixed a bug in the TPSA lib which happens when all the elements are zero in a DA vector
 
        and caused an error in symplectic tracking using the 2nd kind of generating function.
 
     Next two weeks (Oct 28 - Nov 8)  
 
 
       - Start working on JSPEC benchmarking with Lanzhou experimental data.
 
       - Start working on JSPEC benchmarking with Lanzhou experimental data.
       - Finish a few changes of JSPEC
+
       - Vacation in the second week.
  
  
Line 309: Line 309:
 
Kevin Jordan
 
Kevin Jordan
  
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
 
       -  
 
       -  
     Next two weeks (Oct 28 - Nov 8)
+
     Next two weeks (Nov 11 - Nov 22)
 
       -  
 
       -  
  
Line 319: Line 319:
 
Joe Gubeli
 
Joe Gubeli
  
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
       - Isotope Experiment – Work on completing the shielding and instrumentation for the experiment. Address items that comes
+
       - Isotope Experiment – Helped with adding diagnostic and connecting them to an EPICS controlled systems. Checked viewers needed to run to both the 1G and 1X destinations.
         out of the review
+
         Found issues with five of the thirteen viewers and emailed I&C the list.
       - Halo monitor – Finish aligning the camera/fiber optics and install it on LDRDS
+
       - Halo monitor – Had several discussions with collaborators and created an ATLis beam test plan.
     Next two weeks (Oct 28 - Nov 8)
+
      - HPWS – Repositioned the HPWS to its nominal operational angle of 45 degrees. Found that in this configuration the full travel cannot be reached due to a current limit
       -  
+
        setting. Increasing this setting can damage the linear motors. Added a pneumatic cylinder and an air regulator to the HPWS. Set the regulator to move the stage to the
 +
        center of travel. With this addition the full range of the stage can now be reached.
 +
      - AWP – Completed the AWP for two projects
 +
     Next two weeks (Nov 11 - Nov 22)
 +
       - Isotope Experiment – Prepare for a two day run to the 1G dump.
 +
      - Halo monitor – Conduct the Halo Monitor experiment in the LERF
 +
 
  
  
Line 344: Line 350:
 
LERF - Steve Benson  
 
LERF - Steve Benson  
 
   
 
   
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct. 28 - Nov. 8)
       - Submitted proposal for change of SOW for the Cooling FOA for IMP work
+
       - Finished setting up seminars for November 14, 19, 21, and Dec. 12 ( with a lot of help from Tristan)
       - Prepared quarterly report for Strong Cooling FOA project
+
       - Reviewed paper on Compton gamma ray sources for DOE review.
      - Prepared budget for isotope project quarterly and assist PI in submitting the report.
+
       - Restarted Cooler ring meetings and wrote up summary
       - Prepared and gave talk on LERF Activities at the JLAAC meeting.
+
       - Update Manouchehr Farkhondeh with budget details of SOW change for IMP experiment.
      - Set up seminars by Chris Tennant, Pavel Chevtsov, and Michael Famiano
+
       - Worked on punch list items for the Isotope ERR
       - Discussed non-beam hazards and Lock,Tag&Try issues with Laser Safety personnel.  
+
       - Prepared slides for and attended the NP Accelerator R&D PI Exchange meeting in Gaithersburg MD.  
       - Reviewed Class 3R laser status int he LERF and disabled several unused lasers.
+
     Next two weeks (Nov 11 - Nov 22)
      - Reviewed Isotope program and run plans with Operations Staff
+
      - Submit Test plans for 1G run
       - Prepared AWPs for Cooling FOA project and Isotope production program.
+
      - Review SBIR
     Next two weeks (Oct 28 - Nov 8)
+
      - Review PRAB paper
 +
      - Get kicker coils for RF merge test completed
 
       - Certify User Lab 4 in the LERF
 
       - Certify User Lab 4 in the LERF
 +
      - Complete punch list items for Isotope ERR
 
       - Submit papers for ERL workshop
 
       - Submit papers for ERL workshop
 
       - Assist in run to the 1G dump with CW beam.
 
       - Assist in run to the 1G dump with CW beam.
      - Work on punch list items for the Isotope ERR
 
      - Get kicker coils for RF merge test completed
 
      - Prepare slides for and the attend the NP Accelerator R&D PI Exchange meeting in Gaithersburg MD.
 
 
  
  
Line 369: Line 373:
 
Andrew Hutton
 
Andrew Hutton
 
   
 
   
     Previous two weeks (Oct 14 - Oct 25)
+
     Previous two weeks (Oct 28 - Nov 8)
       -     
+
       - Preparing a talk on the history of JLab for the 86th Annual Meeting of the APS Southeastern Section 0n Friday, November 8, 2019 in
     Next two weeks (Oct 28 - Nov 8)
+
        Wrightsville Beach, North Carolina.  I had never done a talk like this and it took a lot of reading and preparation.  I would be happy
       -
+
        to give the talk to the members of CASA to make the effort worth while - there were only 20 people at the talk at SESAPS! 
 +
      - We are also gearing up for a 1G run with CW beam in LERF as well as finalizing the preparations for our first isotope irradiation. I
 +
        have a meeting of VNECA in Richmond tomorrow.      
 +
     Next two weeks (Nov 11 - Nov 22)
 +
       - I will be having (very) minor outpatient surgery this week so I will be out a fair bit with pre-op and post op.

Latest revision as of 11:07, 7 January 2020

Nov 7 2019 Report - Oct 28 - Nov 22 Director - Todd Satogata

Todd Satogata

  Previous two weeks (Oct 28 - Nov 8)
     - ADMIN 12 GeV PRAB paper planning
     - ADMIN FY20 AWP planning
     - ADMIN Review PRAB paper
     - ADMIN Recommendation letters (Deepsana Shahi, Mike Lafky)
     - ER@CEBAF post-JLAAC planning for summer 2020 chicane install
     - JACOW Team Meeting travel preparation
     - IPAC'20 SPC/3 Meeting travel preparation
     - ODU PHYS854 teaching (with Geoff Krafft) 
  Next two weeks (Nov 11 - Nov 22)
     - ADMIN 12 GeV PRAB paper planning/writing
     - MGMT Continue annual appraisals, evaluations; AWP updates
     - JLEIC R&D planning and organization, Michael Sullivan visit
     - JACOW Team meeting preparations, IPAC'20 SPC/3 preparations
     - OPS CEBAF startup support and planning
     - ODU PHYS854 teaching (with Geoff Krafft)



Alex Bogacz

  Previous two weeks (Oct 28 - Nov 8) 
     - Alternative lattice for the LHeC ERL
     -	Invention disclosures review
     -	Appraisals
     -	Vac
  Next two weeks (Nov 11 - Nov 22)
     - Vac
     -	SBIR proposal review 
     -	Lattice work for nuSTORM 
     -	Chapter on the LHeC ERL Optics (The LHeC Technical Design Report )



Rui Li

  Previous two weeks (Oct 28 - Nov 8)
     - Prepare and present JLEIC impedance studies at JLEIC R&D meeting
     - Participate multi-lab (LBL/SLAC/APS/NSLS-II) monthly seminar on collective effects in electron storage rings (I'm asked to present the
       next monthly seminar on collective effects in JLEIC)
     - Continue my collaboration with ALS-U and SLAC on impedance and instability
     - Literature study on feedback systems for coupled-bunch instability
     - Discuss with Frank Marhauser and Mark Wiseman on impedance progresses, and plan for the next JLEIC imepedance meeting
  Next two weeks (Nov 11 - Nov 22) 
     - Organize JLEIC impedance meeting on 11/11
     - Finish writing up the technote on spectra for uneven bunch fill
     - Continue my collaboration with ALS-U and SLAC on impedance and instability
     - Continue understanding of the feedback systems for coupled bunch instability
     - Prepare and give presentation on "Collective Effects in Electron-Ion Colliders" for the inter-lab (SLAC/LBL/APS/NSLS-II/JLAB) tele-
       seminar (focused on collective effects) on 11/22




Edy Nissen

   Previous two weeks (Oct 28 - Nov 8)
     - Finished my proposal for the DESIREE experiment and submitted it, I have received confirmation that it is now with the review committee
     - Finished the decoupling system in the HEB now that a solenoid has been added
     - Wrote up a tech note about the current design of the HEB
     - Am currently working on a description of the DESIREE experiment and the details gained from it
   Next two weeks (Nov 11 - Nov 22)
     - I will be on extended medical leave



Chris Tennant

   Previous two weeks (Oct 28 - Nov 8)
     - Division seminar prep
     -	CEBAF PRAB manuscript work (verifying data with DT Manager)
     -	ML to model CEBAF pathlength (meet with Dennis T)
     -	Autonomous robot meeting
     -	Work with Gunn Tae on magnetized beam modeling
     -	"Problem of the Quarter" for AI Lunch Series
     -	BNL CeC meeting and slide prep for PI meeting in DC
   Next two weeks (Nov 11 - Nov 22)
     - BNL CeC (telecon starting up again)
     -	JLEIC CCR (next approach)
     -	Fine-tune ML models for SRF fault classifier in anticipation of fall run




Accelerator R & D - Yuhong Zhang

Yuhong Zhang

  Previous two weeks (Oct 28 - Nov 8)
     - Attend the Accelerator R&D PI Exchange Meeting 
  Next two weeks (Nov 11 - Nov 22)
     - 


Max Bruker

  Previous (Oct 28 - Nov 8)
     -	Electron cooling theory
     -	Preparation for IMP experiment, travel paperwork
     -	Cool'19 proceedings survey
     -	Learned GPT basics to see if it could substitute CST for magnetized DC beam tracking
           - Precise modeling of equipotential surfaces seems difficult, so the space charge potential is probably inaccurate
           - Seems suitable for simple checks of magnetized optics
  Next (Nov 11 - Nov 22)
     -	Look at data from previous IMP experiment
     -	Become familiar with the deficiencies of the setup



Fanglei Lin

  Previous two weeks (Oct 28 - Nov 8)
       - Worked on the storage ring cooler project, and reported the progress in the storage ring cooler meeting
       - Revisited the electron top-off injection scheme for JLEIC
       - Miscellaneous: attended the Innovative HE Cooling Project Status meeting, attended the Storage Ring Cooler meeting, attended JLEIC R&D
         meeting, discussed introducing computation of DK depolarization rate using Zgoubi with Radiasoft colleagues, attended JLEIC detector
         meeting. 
  Next two weeks (Nov 11 - Nov 22)
       - Evaluate the IR design for various electron energies
       - Work on the storage ring cooler project
       - Work on teaching material for a USPAS class



Bhawin Dhital

   Previous two weeks (Oct 28 - Nov 8)
     - Working on longitudinal dynamics and stability in two energy storage ring cooler.
     - Working with new lattice. Dr Fanglei Lin has designed new optics for two energy storage ring cooler.
     - Single and many particles tracking.
     - Understanding of bunching cavity phase and the stability based on particle tracking.
   Next two weeks (Nov 11 - Nov 22)
     - Optimization of parameters in two energy storage ring design.
     - Single and many particles tracking using new lattice.
     - Energy spread and bucket height simulation based on bunching cavity voltage.
     - Preparing a talk for Nov 22 Friday "High innovative cooler meeting".



Vasiliy Morozov

   Previous two weeks (Oct 28 - Nov 8)
     - Attended EINN'19 and gave a presentation on the JLEIC and eRHIC designs
     - Attended the PI exchange meeting and presented the status of the transparent spin test project
     - Preparation for a trip to CERN to work on analysis of the SPS crab cavity test data 
     - Optimization of the IBS rate in the JLEIC ion collider ring, meeting with V. Lebedev
     - Exploration of the chromaticity compensation options and magnet requirements in an IBS optimized ion collider ring lattice
   Next two weeks (Nov 11 - Nov 22)
     - Work at CERN on the crab cavity test data analysis
     - Continue exploration of the chromaticity compensation options and magnet requirements in an IBS optimized ion collider ring lattice 
     - Spin tracking for the transparent spin experiment
     - Preparation for the EICUG Yellow Reports - Kick-off Meeting




Amy Sy

   Previous two weeks (Oct 28 - Nov 8):
     - Participation in the DOE independent project review of LBNF/DUNE. Chaired the subcommittee reviewing the Beamline WBS. 
     - Completed final report for LBNF/DUNE review.
     - Continued work on heavy ion stripping chicane design in TRACK, particularly looking at longitudinal dynamics of stripped lead ions after
       traversing a four dipole chicane.
   Next two weeks (Nov 11 - Nov 22)
     - Continued work on linac optimization for reduced transverse emittance.
     - Continued work on heavy ion stripping chicane design in TRACK and PyORBIT.
     - Continued work on TRACK vs PyORBIT comparison for linac simulations.
     - Preparation of abstracts for IPAC20.







Computational Physics - Yves Roblin
Yves Roblin

   Previous two weeks (Oct 28 - Nov 8)
     - CEBAF:
          - Bteam preparation/meetings
          - Preparing and investigating alternate schemes for reduced linac gradients
          - Schedule and coordination for startup
     - JLEIC:
          - FOA PI meeting at DOE
          - Re-scoping of FOA
          - Meeting with student every week
          - Meeting with CNU prof and JLab operations for use of drones in tunnel (AI)
          - Organizing committee for AI workshop    
     - OTHER
          - Preparing lecture for SPIN2020 school. Initial gathering and writing of agenda
   Next two weeks (Oct 28 - Nov 8)
     - SLLP training in Chicago
     - Machine startup



Randi Gamage

   Previous two weeks (Oct 28 - Nov 8)
     - Next step of the orbit correction - correcting the beta function distortion 
     - Investigating different multipole correction schemes.
     - Jlab contribution to the quarterly report
   Next two weeks (Nov 11 - Nov 22)
     - Continue to correct beta distortion
     - Continue different multipole correction schemes




River Huang

   Previous two weeks (Oct 28 - Nov 8)
     - Transparent Spin Projet - We completed the CASA Curve-Fitting python codes based on the least square method. Using our CASA Curve-
       Fitting we can obtain the numerical results of the spin resonance-strength, the spin field directions, the phases in spin resonance
       process, the average spin value and the amplitude. Again, OPERA field maps with snakes’ parallel (the snake currents were varied using a
       fitting procedure to adjust the snake axis to 0°) has been put into RHIC’s lattice. After precisely adjusting the total bending angle of
       all of the dipole magnets to sum up to 2π, we tried to realize the spin transparent in a simulation for the RHIC’s configuration: all of
       the spin components are constant from turn to turn with a good numerical precision. The four different cases of misalignments was
       introduced into same RHIC lattice, the spin tracking from 1 turn to 2000 turns was carried out and the spin resonance-strength was 
       obtained.
     - CASA Beam-Beam package - For the case β_1x^*≫σ_1x^*,β_2x^*≫σ_2x^*,  the analytical solution of the luminosity was derived by us. This
       new solution has been involved in CASA Beam-Beam package. For JLEIC Parameters and Luminosity Performance, we did the benchmarks. The
       results of our analytical solution and the numerical results are consistent. 
   Next two weeks (Nov 11 - Nov 22)
      - Continue working on EIC project


Isurumali Neththikumara

   Previous two weeks (Oct 28 - Nov 8)
     - Edited the script to output 6-D coordinates of a specific particle.
   Next two weeks (Nov 11 - Nov 22)
     - Calculation of Lyapunov exponent using the data obtained from BB3D simulations.



Dennis Turner

   Previous two weeks (Oct 28 - Nov 8)
     - I was out quite a bit due to having a loved one in the hospital.
     - 130keV emittance measurements.
     - qsUtility tweaks.
     - Discussion with Chris Tennant about using ML for pathlength prediction.
     - elegant deck for Injector upgrade
     - Modified the elegant 'view3dgeometry' tool to help with building the deck
     - Attended BTeam and AI lunch meetings.
   Next two weeks (Nov 11 - Nov 22)
     - Analyze 130keV emittance measurement data.
     - Develop a separate tool for performing ansd analyzing 130keV emittance measurements
     - Continue work on assigned sections for the 12GeV PRAB paper.
     - Configure optics for the Injector upgrade elegant deck.
     - Start populating the Injector upgrade CED workspace.
     - Continue exploring ML with Keras and TensorFlow.
     - Finish QTSnyder upgrade and write ATLis for testing
     - Attend BTeam, 12GeV paper, Injector Upgrade, and AI lunch meetings. 
     - Assist with CEBAF startup as needed.




He Zhang

   Previous two weeks (Oct 28 - Nov 8)     
     - JSPEC - Our colleague, Dr. Bruker, refactored the Martini model for IBS rate calculation and send a pull request to the github
       repository. I doublechecked his work and revised slightly mostly for coding style. Inspired by his work, I refactored the Bjorken-
       Mtingwa model. Since Bruker’s work is on the version before I added the IBS contribution by element feature, I implemented this again
       after refactoring the IBS formulas.     
     - Other - Prepared a few slides on cooling code development FOA for the DOE PI meeting. 
   Next two weeks (Nov 11 - Nov 22) 
     - Refactor electron cooling rate calculation. Revisit the particle model and the turn-by-turn model. Make sure they work well.
     - Start working on JSPEC benchmarking with Lanzhou experimental data.
     - Vacation in the second week. 




Diagnostic Development - Kevin Jordan

Kevin Jordan

   Previous two weeks (Oct 28 - Nov 8)
     - 
   Next two weeks (Nov 11 - Nov 22)
     - 



Joe Gubeli

   Previous two weeks (Oct 28 - Nov 8)
     - Isotope Experiment – Helped with adding diagnostic and connecting them to an EPICS controlled systems. Checked viewers needed to run to both the 1G and 1X destinations.
       Found issues with five of the thirteen viewers and emailed I&C the list.
     - Halo monitor – Had several discussions with collaborators and created an ATLis beam test plan.
     - HPWS – Repositioned the HPWS to its nominal operational angle of 45 degrees. Found that in this configuration the full travel cannot be reached due to a current limit
       setting. Increasing this setting can damage the linear motors. Added a pneumatic cylinder and an air regulator to the HPWS. Set the regulator to move the stage to the
       center of travel. With this addition the full range of the stage can now be reached. 
     - AWP – Completed the AWP for two projects
   Next two weeks (Nov 11 - Nov 22)
     - Isotope Experiment – Prepare for a two day run to the 1G dump.
     - Halo monitor – Conduct the Halo Monitor experiment in the LERF




Michael Tiefenback

   Previous two weeks ()
     - 
   Next two weeks ()
     - 



CASA Fellows
LERF - Steve Benson

   Previous two weeks (Oct. 28 - Nov. 8)
     - Finished setting up seminars for November 14, 19, 21, and Dec. 12 ( with a lot of help from Tristan)
     - Reviewed paper on Compton gamma ray sources for DOE review.
     - Restarted Cooler ring meetings and wrote up summary
     - Update Manouchehr Farkhondeh with budget details of SOW change for IMP experiment.
     - Worked on punch list items for the Isotope ERR
     - Prepared slides for and attended the NP Accelerator R&D PI Exchange meeting in Gaithersburg MD. 
   Next two weeks (Nov 11 - Nov 22)
     - Submit Test plans for 1G run
     - Review SBIR
     - Review PRAB paper
     - Get kicker coils for RF merge test completed
     - Certify User Lab 4 in the LERF
     - Complete punch list items for Isotope ERR
     - Submit papers for ERL workshop
     - Assist in run to the 1G dump with CW beam.



Andrew Hutton

   Previous two weeks (Oct 28 - Nov 8)
     - Preparing a talk on the history of JLab for the 86th Annual Meeting of the APS Southeastern Section 0n Friday, November 8, 2019 in
       Wrightsville Beach, North Carolina.  I had never done a talk like this and it took a lot of reading and preparation.  I would be happy
       to give the talk to the members of CASA to make the effort worth while - there were only 20 people at the talk at SESAPS!   
     - We are also gearing up for a 1G run with CW beam in LERF as well as finalizing the preparations for our first isotope irradiation. I 
       have a meeting of VNECA in Richmond tomorrow.     
   Next two weeks (Nov 11 - Nov 22)
     - I will be having (very) minor outpatient surgery this week so I will be out a fair bit with pre-op and post op.