'''Ryan Bodenstein'''
 
'''Ryan Bodenstein'''
 
    
 
    
   '''Previous two weeks (Apr 12 - Apr 23)'''  
+
   '''Previous two weeks (May 10 - May 21)'''  
 
       - Attendance of 8 AM SAD meetings
 
       - Attendance of 8 AM SAD meetings
 
       - Attendance of B-Team Meetings and Procedure Development Meetings
 
       - Attendance of B-Team Meetings and Procedure Development Meetings
 
       - FFA WG meetings + IPAC paper
 
       - FFA WG meetings + IPAC paper
      - Attending various EIC meetings
+
            - The paper is submitted – will check on “green light”
       - Practicing OptiM
+
            - Poster and presentation online
       - Guidance of Isurumali’s work – meetings and review of results, etc…
+
       - Looking at some IPAC proceedings already
       - Writing and editing LDRD preliminary proposal – sent to Andrei and Mike
+
       - Guidance of Isurumali’s work – lots of editing of the paper and feedback on the poster
   '''Next two weeks (Apr 26 - May 7)'''
+
       - Writing and editing LDRD full proposal
       - Attendance of 8 AM SAD meetings
+
            - Currently looking through finer details to make a strong case
       - Attendance of B-Team Meetings and Procedure Development Meetings
+
            - Will need to re-examine budget a bit will tie Spata into this
      - FFA WG meetings + IPAC paper
+
            - Will iterate with colleagues.
              - The paper is close to finished.
+
      - Gave input into Andrew’s LDRD proposal as well.
      - Will start working on poster and presentation
+
      - ILC meeting with Andrei and Todd
      - Attending various EIC meetings
+
   '''Next two weeks (May 24 June 4)'''
      - Guidance of Isurumali’s work – input into IPAC paper
+
       - IPAC21 attendance
      - Writing and editing LDRD preliminary proposal
+
       - LDRD Proposal work – will submit on May 28th
              - Budget spreadsheet had 2 passes with finance
 
              - Uploaded to sharepoint
 
              - Looking into final edits before submission.
 
      - Covid vaccine #2 on the 30th
 
  
  
Line 367: Line 363:
 
'''LERF - Steve Benson'''  
 
'''LERF - Steve Benson'''  
 
   
 
   
     '''Previous two weeks (Apr 12 - Apr 23)
+
     '''Previous two weeks (May 10 - May 21)
       - Gave APS April meeting presentation and attended conference
+
       - Start setting up CRADA with HZDR
       - Started quarterly report for High Energy Cooling FOA
+
       - Started preparing presentation on loss control in high current ERLs
       - Got COVID-19 vaccine
+
       - Reviewed several IPAC papers and presentations
       - Developed budget for Isotope quarterly
+
      - Submitted ERL Roadmap entries
     '''Next two weeks (Apr 26 - May 7)'''
+
       - Went over FOA call for SBIRs with Michelle Shinn
       - Submit quarterly for High Energy Cooling FOA
+
      - Put together LDRD proposal
       - Submit LOI for LDRD for Photon Sources at JLab
+
     '''Next two weeks (May 24 - June 4)'''
       - Rewrite and submit the LOSP for User Lab 4
+
       - Attend IPAC
       - Study options for long bunches in the CeC ERL
+
       - Complete and present talk on Loss control in high current ERLs for SHC group
 +
       - Submit LDRD proposal
 +
       - Set up training for Drive Laser Enclosure LPSS
 
       - Start developing longitudinal model for CeC ERL on LiTrack
 
       - Start developing longitudinal model for CeC ERL on LiTrack
  

Revision as of 11:15, 7 June 2021

May 27, 2021 Report - May 10 - June 4 Director - Todd Satogata

Todd Satogata

  Previous two weeks (Apr 12 - Apr 23) 
     - EIC Meetings (management, RF, crab, cryo, cooling, impedance, OPC, team, R&D)
     - EIC Management Retreat (Apr 21-22)
     - EIC Planning (technical reviews, partner project scope negotiation)
     - MGMT Meetings (Leadership/Dept Heads, CASA coffee, ODU engineering)
     - ADMIN APS April Meeting (Apr 17-20)
     - ADMIN IPAC'21 planning (Wednesdays)
     - ADMIN IPACCC SPMS/Indico Task Force (Apr 20)
     - OPS Meetings (08:00 daily, BTeam, 1:30 Weds SAD)
     - ODU Lila isotopes code debugging
     - PERS COVID vaccination #2 (Apr 15), Doc appt (Apr 21)
     - VACATION Apr 16 (post-vaccination)
  Next two weeks (Apr 26 - May 7) 
     - EIC Meetings (management, RF, crab, cryo, cooling, impedance, OPC, team, R&D)
     - EIC Meetings (second IR, tech change control board Apr 26)
     - EIC Planning (technical reviews starting May 10)
     - MGMT Meetings (Leadership/Dept Heads, CASA coffee, personnel)
     - ADMIN IPAC'21 planning (Wednesdays, oral dry runs May 6)
     - ADMIN IPACCC SPMS/Indico Task Force (May 5)
     - OPS Meetings (08:00 daily, BTeam, 1:30 Weds SAD)
     - VACATION Apr 29 half-day





Alex Bogacz

  Previous two weeks (Apr 12- Apr 23) 
     - Present talk on ‘PERLE - ERL Test Facility’ at  DIS 2021 Workshop 
     - PRAB paper review
     - White Paper on future CEBAF - writeup on FFA energy doubling 
     - PERLE optics (one-on-one with Ryan) 
     - Writing IPAC paper on ‘CEBAF FFA energy doubling
  Next two weeks (Apr 26 - May 7)
     - Writing IPAC paper on ‘PERLE start-to-end simulation ’ 
     - Writing IPAC paper on ‘The LHeC ERL’
     - ERL Roadmap Panel - writeup on ‘ER@CEBAF’
     - FFA@CEBAF multi-pass linac design
     - FFA@CEBAF optics (one-on-one with Ryan)




Ryan Bodenstein

  Previous two weeks (May 10 - May 21) 
     - Attendance of 8 AM SAD meetings
     - Attendance of B-Team Meetings and Procedure Development Meetings
     - FFA WG meetings + IPAC paper
            - The paper is submitted – will check on “green light”
            - Poster and presentation online
     - Looking at some IPAC proceedings already
     - Guidance of Isurumali’s work – lots of editing of the paper and feedback on the poster
     - Writing and editing LDRD full proposal
            - Currently looking through finer details to make a strong case
            - Will need to re-examine budget a bit – will tie Spata into this
            - Will iterate with colleagues.
     - Gave input into Andrew’s LDRD proposal as well.
     - ILC meeting with Andrei and Todd 
  Next two weeks (May 24 June 4)
     - IPAC21 attendance
     - LDRD Proposal work – will submit on May 28th 





Rui Li

  Previous two weeks (Apr 12 - Apr 23)
     - 
  Next two weeks (Apr 26 - May 7) 
     - 




Edy Nissen

   Previous two weeks (Apr 12 - Apr 23)
     - Out for 3 days due to a medical procedure
     - Attended Bteam, Beam-beam, and RCS meetings
     - Finished and resubmitted DODGE paper
     - Worked on analysis of February DESIREE data
   Next two weeks (Apr 26 - May 7)
     - Out for 3 days volunteering at a vaccination site in Greensboro North Carolina
     - Wrote and submitted beam time proposal for DESIREE in the fall
     - Finish data analysis of February DESIREE data
     - Write talk for IPAC





Chris Tennant

   Previous two weeks (Apr 12 - Apr 23)
     - 
   Next two weeks (Apr 26 - May 7)
     - 






Accelerator R & D - Yuhong Zhang

Yuhong Zhang

  Previous two weeks (Apr 12 - Apr 23)
     - 
  Next two weeks (Apr 26 - May 7)
     - 



Max Bruker

  Previous two weeks (May 10 - May 21)
     - IPAC poster + video + paper done
     - I repeated some simulations of the emittance growth in the IMP experiment with phase dithering to make sure they all use the same, most recent tracking code. Unfortunately, the result does not agree with reality anymore! This may be something to study at a later point. For now, I left the dithering results out of the IPAC material.
     - We wanted to start beam commissioning of the CEBAF injector upgrade this week, but it was delayed by a series of unfortunate circumstances.
  Next two weeks (May 24 - June 4)
     - Start the aforementioned beam commissioning phase.




Bhawin Dhital

   Previous two weeks (Apr 12 - Apr 23)
     - I was working on IPAC2021 papers. We accepted an invitation for "Contributed Talk" from IPAC'21 on \Beam Dynamics Study in a Dual Energy Storage Ring Cooler". Papers were completed and sent it for review among the group members. After review, some corrections were made and updated almost to the final version. Papers are ready to submit at IPAC'21.
     - I was working with JSPEC (Jefferson Lab Simulation Package for Electron Cooling). I am using JSPEC in Sirepo (from Radiasoft). Cooling rates were estimated using eRHIC proton lattice parameters using both Meshkov and Parkhomchuk formula implemented in JSPEC.
     - Meshkov cooling force formula works better in dual energy storage ring. It shows good cooling rates less than an hour in both horizontal and longitudinal dimensions.
   Next two weeks (Apr 26 - May 7)
     - I will be working on IPAC'21 contributed talk presentation .
     - I will be working on IPAC'21 poster presntation.
     - I will be further working on cooling parameters calculations.





Amy Sy

   Previous two weeks (May 10 - May 21)
     - Review of student applications as part of the selection committee for MFURA awards.
     - Continued work with the Brown-Servranckx transform for round, uncoupled beam from a magnetized beam. Trying to characterize the effects of different forms of the Brown-Servranckx transform, both with and without the 2.5D space charge solver enabled. The 3D space charge solver seems to result in huge, unphysical beams, so still trying to understand this module and its implementation.
     - Laser particle counter: test apparatus has been reassembled in TL 1011. Minor modifications, including moving the vacuum pump off of the bench to the floor, may be necessary as testing resumes. The vendor has received and tested initial hardware components and plans to be on site 5/26 and 5/27, returning once per week on a continuing basis thereafter.
     - Usual biweekly meeting with Omnisensing Photonics to discuss general progress.
     - Prepared and gave a short presentation on parametric-resonance ionization cooling (PIC and Skew PIC) concepts, implementation, and challenges as part of the 1st Muon Community Meeting hosted by CERN. Presentation was part of an overall presentation on advanced muon cooling concepts.
   Next two weeks (May 24 - June 4)
     - Attending virtual IPAC2021. Following week: catching up on IPAC talks missed during on site work.
     - Laser particle counter: On site visit by vendor on 5/26 and 5/27. A 6-channel prototype was delivered instead of the 12-channel prototype expected due to hardware delays. Initial visit to familiarize ourselves with the hardware and GUI for data-taking. The current prototype can only record data from two channels simultaneously, so an obvious action item is to enable simultaneous recording of data from all six available channels. 
     - Submitted an action item list to the vendor. Vendor will return with prototype detector either 6/3 or the following week.









Computational Physics - Yves Roblin
Yves Roblin

   Previous two weeks (Apr 12 - Apr 23)
     - Moller beamline work
     - Moller collab. prep work
     - Spin lecture notes
     - Analytical spin transport algorithm development
     - BTeam prep
     - Procedural development/meeting
   Next two weeks (Apr 23 - May 7)
     - Moller collaboration meeting.
     - BTeam meetings, Bteam prep
     - Spin lecture notes
     - Procedural development meetings
     - Preparing Jlab talk for Hugs
     - Moller experiment work on designing the locks
     - SBS experiment status meeting






Randi Gamage

   Previous two weeks (Mar 29 - Apr 9)
     - 
   Next two weeks (Apr 12 - Apr 23)
     - 


River Huang

   Previous two weeks (Apr 12 - Apr 23)
     - Continue working on EIC Beam-Beam project. In Next 4-6 weeks, I also Plan to learn the online courses of “Winter 2021 US Particle Accelerator School” and will discuss the questions with Yuhong Zhang
   Next two weeks (Apr 26 - May 7)
     - Continue working on EIC Beam-Beam project and implementing Elegant for detail informations of SPS lattice with help of Vasiliy and Yuhong.  





Isurumali Neththikumara

   Previous two weeks (May 10 - May 21)
     - Prepared the poster, poster video and paper for IAPC’21
     - Read some materials received from USPAS Spin dynamics in Particle Accelerator class.
     - Checking outcome for 12-dimensional search problem with different constraints. 
   Next two weeks (May 24 - June 4)
     - Participate in IPAC’21.
     - Continue 12-D search and figure out the better suited constraints and try to come up with a modified objective functions.





Dennis Turner

   Previous two weeks (Apr 12 - Apr 23)
     - UITF
          - Merged final deck from the UED Optics workspace into the Ops workspace; quite a few conflicts needed to be resolved.
     - AIPINJ
          - Set final optics in CED Optics workspace and merge into Ops
          - Prepare for upcoming commissioning testplans, including a tunnel tour
     - 'HLA
          - cs2sdds bugfixes
          - Begun work on elegant to CED import in earnest
          - Met with Chris Slominski and Michele Joyce to discuss the upcoming RF HLA API.
          - Continue work on the rayTrace tools
     - Continue work on the Aperture Scan procedure
     - Attend BTeam, AIPINJ, UITF, PPB, CASA, 0800, AI FOA, and Ops Procedure Review meetings
     - Attend AI Lunch Series talks and Accelerator Seminars
   Next two weeks (Apr 26 - May 7)
     - UITF
         - Submitted spreadsheet of Optics measurments taken after last run
         - Work with Yan to measure energy spread
     - AIPINJ
          - Rematch INJ->NL->Arc1 with Injector magnet settings that will be used for upcoming commissioning run
          - Volunteered to take shifts for AIPINJ commissioning
     - HLA
          - Continued work on elegant2ced
              - Import seems to work now; more thorough testing to come
              - While testing, uncovered a bug in ced2elegant which must be addressed
          - cs2sdds bugfixes 
     - AI FOA
          - Prepare slides to present to the weekly brainstorming meeting
          - Submit abstract to ICALEPS
     - Ops
          - Continue with Aperture Scan procedure and present again
     - Attend AI Lunch Series, Accelerator Seminar, OWLE machine learning seminar
     - Attend 0800, CASA, BTeam, AIPINJ, UITF Optics, AI FOA, Ops procedure review, polarized postitron meetings




He Zhang

   Previous two weeks (May 10 - May 21)     
     - Finished IPAC slides and presentation. Finished and uploaded the IPAC paper. 
     - Participate in writing and editing an LDRD proposal.  
   Next two weeks (May 24 - June 4) 
     - IPAC’21
     - Add to TPSA lib the feature: generate a symplectic map from a given truncated map. 
     - Finish writing the tests for the TPSA lib.
     - Writing FMM paper. 





Diagnostic Development - Kevin Jordan

Kevin Jordan

  Previous two weeks (Apr 12 - Apr 23)
     - 
  Next two weeks (Apr 26 - May 7)
     - 



Joe Gubeli

   Previous two weeks (Apr 12 - Apr 23)
     - Isotopes –
     - ARDDOT -  
   Next two weeks (Apr 26 - May 7)
     - Isotopes – 
     - ARDDOT –


Michael Tiefenback

   Previous two weeks (Apr 12 - Apr 23)
     - 
   Next two weeks (Apr 26 - May 7)
     - 



CASA Fellows
LERF - Steve Benson

   Previous two weeks (May 10 - May 21)
     - Start setting up CRADA with HZDR
     - Started preparing presentation on loss control in high current ERLs
     - Reviewed several IPAC papers and presentations
     - Submitted ERL Roadmap entries
     - Went over FOA call for SBIRs with Michelle Shinn
     - Put together LDRD proposal
   Next two weeks (May 24 - June 4)
     - Attend IPAC
     - Complete and present talk on Loss control in high current ERLs for SHC group
     - Submit LDRD proposal
     - Set up training for Drive Laser Enclosure LPSS
     - Start developing longitudinal model for CeC ERL on LiTrack





Andrew Hutton

   Previous two weeks (Apr 12 - Apr 23) 
     - Vacation: April 10 - April 17
     - Isotopes: There is still a lot of discussion to try and lock down the results o the two irradiations.  This was partially achieved for the APS talk given by Steve, but we are still working on it.  The new FOA came out from the DOE Isotope program for training File:DE-FOA-0002508.pdf  We will discuss how best to respond on Friday.  Lila is getting to the end of her work, with assistance from Todd (thanks).           
     - ERL Roadmap: Still working with Max Klein.  No further news on PERLE, apart from an email acknowledging receipt of our marked up copy which is now in the hands of the IN2P3 lawyers (again).     
     - JJCLab: I received an invitation to be on their International Scientific Council.  
     - FCC-ee: I participated in a r review of the Injector and made several comments.  The Review closeout discussion is on Thursday.  I could not resist suggesting that they look at the LHeC electron complex as the injector (this includes the ERL design by Alex).  
     - HIPERLAC: I am continuing to follow up with Framatome and BWXT, and will be writing up an LDRD proposal.             
   Next two weeks (Apr 26 - May 7)  
     - Isotopes: The Quarterly Report has been written and is being submitted today.  We are still trying to understand the data from the irradiations.  Our best guess at the moment is that FLUKA 2020, which now calculates Copper67 production correctly, underestimates the production of Gallium67.  Since we calculate the amount of Copper67 from the ratio derived from the calibration, the crucible experimental data is a factor of ~2 greater than FLUKA.  We are continuing to investigate.  I already wrote to you about the new FOA; this was discussed at the Isotope Meeting and our UVA collaborators are on board to take the lead.   
     - ERL Roadmap: The first draft of the report is due mid may, so things are heating up.  I have started on my sections, but have a lot more to do.     
     - PERLE: Rumor has it that we are really close.  JLab has accepted the latest CNRS edits and the ICRADA has been sent to the DOE for concurrence.  In a video conference with Achille Stocchi, Director of IJCLab, and Jean-Luc Biarrotte, CNRS Directorate, Jean-Luc stated that CNRS are ready to sign this version.  So maybe we are getting there!    
     - HiPERLAC: new name, the pre-Proposal has been uploaded to the Division site and emailed to Leigh.  I have not heard back from BWXT (they have just been named as one of two proposals for micro-reactors for DOE funding and are preparing their next steps) and Framatome (it has been passed to their technical experts). 
     - VCU Engineering Department of Mechanical and Nuclear Engineering: the Industrial Advisory Board met this week.  the focus was on changing the course offerings to attract more people to the Department.  They have been losing out to computer engineering, including cyber security.  They wanted the advice of the local industries as to which courses would be best adapted for hiring, so I was not much use.  
     - VNACA: Also met this week.  There was presentation by a policy wonk as to the impact of all of the new initiatives, including the Infrastructure Bill, and the various climate initiatives.  Nuclear seems to be well integrated into this as it is now generally seen as a green energy source.  Hopefully, this will positively impact approval of HIPERLAC!