SUMMER 2015 Installation: 1) The Qweak Halo monitor system (with possible upgrades to hole diameter options). 2) Four high quality cables (similar to what we had during Qweak) running from the Qweak cavity triplet current monitor package to an electrically isolated location in the Hall A racks upstairs. For 2016 Hall A run Period: 3) Re-commissioning of the helicity magnets position feedback system at the injector region which was used during the last run of Qweak. This cannot only be used to control the position of the beam actively locked to the reversal, but as a way to modulate the beam position at the reversal rate and phase so as to measure sensitivities. 4) Possibly a set of the Big BPMs (which we are being constructed for use in Hall C). These allow monitoring and control on the beam position downstream the target. It may also be possible to use the first generation version as a transmission monitor yielding information on helicity correlated target density.