Difference between revisions of "MOLLER PQB Meeting May 15, 2024"

From Ciswikidb
Jump to navigation Jump to search
(2 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
'''Agenda:'''  
 
'''Agenda:'''  
  
# '''Feed Forward Status:''' (tentatively scheduled on May 19) - [[media:Y.Roblin_FFBHALLA.pdf]]
+
* '''Beam Studies, Sunday May 19th:'''  
# '''K-Long Beam Loading:''' (tentatively scheduled on May 19)
+
 
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261]
+
# BLM calibration, 8 am - 10 am, Hall A access
## BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [https://tasklists.jlab.org/bslist/tasks/111367]
+
# FFB in Hall A, 25 uA and up, 10 am - 1 pm
## '''Other issues to look for:'''
+
# Raytrace 1 pm - 1:30 pm
### 4-channel BPMs saturation
+
# Injector tune for KLong, 1:30 pm - 5:30 pm, SRF cavity field emission test in SLinac, DAQ cal test plan, increase HV on two of the RF zones in SL.
### Dumping beam harmonics right onto one of the higher order mode frequencies
+
# BLA cal, high current push, 5:30 pm - 10:30 pm
## '''Check beam power capability May 2024''': Benesch - up to 40 μA to Hall A - [https://tasklists.jlab.org/bslist/tasks/111972]
+
# KLONG test 10:30 pm 5 am (Hall C KLong and Hall A 40 uA CW)
 +
# QTSnyder 5:am - 7:am

Revision as of 17:35, 14 May 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

  • Beam Studies, Sunday May 19th:
  1. BLM calibration, 8 am - 10 am, Hall A access
  2. FFB in Hall A, 25 uA and up, 10 am - 1 pm
  3. Raytrace 1 pm - 1:30 pm
  4. Injector tune for KLong, 1:30 pm - 5:30 pm, SRF cavity field emission test in SLinac, DAQ cal test plan, increase HV on two of the RF zones in SL.
  5. BLA cal, high current push, 5:30 pm - 10:30 pm
  6. KLONG test 10:30 pm 5 am (Hall C KLong and Hall A 40 uA CW)
  7. QTSnyder 5:am - 7:am