Difference between revisions of "MOLLER PQB Meeting July 10, 2024"

From Ciswikidb
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
* '''Beam Study Results:'''  
 
* '''Beam Study Results:'''  
  
# FFB/FF in Hall A: [[media:2024April_FFBtest_Results.pdf]]
+
# FFB/FF in Hall A:
 
## Check S/H wiring of the Hall A BPMs in BSY
 
## Check S/H wiring of the Hall A BPMs in BSY
 
## Check FFB ON versus OFF in QWeak data
 
## Check FFB ON versus OFF in QWeak data
 +
## QWeak Data: [https://logbooks.jlab.org/search/site/FFB?f%5B0%5D=im_field_logbook%3A133&f%5B1%5D=is_uid%3A219]<br  />
  
  
Line 17: Line 18:
  
 
# Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
 
# Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
# No progress on Gun replacement
+
# Gun replacement will re-start tomorrow
# Four out of six MFX solenoids are fixed
+
# Four out of six MFX solenoids have been fixed, remaining two are planned next week.
  
  
* '''MOLLER new rack in ISB - IN03B25''': [[media:IMG_1695.JPG]]
+
* '''MOLLER new rack in ISB - IN03B25''': [[media:IMG_1695.jpeg]]

Latest revision as of 14:55, 10 July 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

  • Beam Study Results:
  1. FFB/FF in Hall A:
    1. Check S/H wiring of the Hall A BPMs in BSY
    2. Check FFB ON versus OFF in QWeak data
    3. QWeak Data: [1]


  • Injector Upgrade Progress:
  1. Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
  2. Gun replacement will re-start tomorrow
  3. Four out of six MFX solenoids have been fixed, remaining two are planned next week.