Difference between revisions of "MOLLER PQB Meeting July 10, 2024"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "In person in MCC Conference Room and with Zoom. https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam -- '''Agenda:''' * '''Beam Study Results:''' # FFB/FF in Hal...")
 
(5 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
* '''Beam Study Results:'''  
 
* '''Beam Study Results:'''  
  
# FFB/FF in Hall A: [[media:2024April_FFBtest_Results.pdf]]
+
# FFB/FF in Hall A:
 
## Check S/H wiring of the Hall A BPMs in BSY
 
## Check S/H wiring of the Hall A BPMs in BSY
 
## Check FFB ON versus OFF in QWeak data
 
## Check FFB ON versus OFF in QWeak data
 +
## QWeak Data: [https://logbooks.jlab.org/search/site/FFB?f%5B0%5D=im_field_logbook%3A133&f%5B1%5D=is_uid%3A219]<br  />
  
  
Line 17: Line 18:
  
 
# Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
 
# Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
# No progress on Gun replacement
+
# Gun replacement will re-start tomorrow
# Four out of six MFX solenoids are fixed
+
# Four out of six MFX solenoids have been fixed, remaining two are planned next week.
  
  
* '''MOLLER needs new rack in ISB - IN03B25'''
+
* '''MOLLER new rack in ISB - IN03B25''': [[media:IMG_1695.jpeg]]

Revision as of 14:55, 10 July 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

  • Beam Study Results:
  1. FFB/FF in Hall A:
    1. Check S/H wiring of the Hall A BPMs in BSY
    2. Check FFB ON versus OFF in QWeak data
    3. QWeak Data: [1]


  • Injector Upgrade Progress:
  1. Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
  2. Gun replacement will re-start tomorrow
  3. Four out of six MFX solenoids have been fixed, remaining two are planned next week.