MOLLER PQB Meeting December 11, 2024
Jump to navigation
Jump to search
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
- Injector Beam Studies:
- Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
- MOLLER DAQ tests to 1D at 65 µA : Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.
- MOLLER Beam Studies: Wien Flip Table — media:PQB_Wien_plans.xlsx
- Fast Feedback Plans: first draft — media:FastFeedback_Plans.pdf