Difference between revisions of "GTS meeting 3 07 17"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
* Beam to F-Cup | * Beam to F-Cup | ||
+ | |||
+ | * Plan to complete the second part of beamline in two weeks: plan for one-week down in about 2 weeks to install the second DP can, solenoid, ion precipitator and the BNNT diagnostic station. |
Revision as of 08:16, 7 March 2017
- Measured QE ~ 3.5% with -100 V Gun bias. Was about 0.4% with -1 kV bias.
- Gun vacuum improved when opeening the gate valve to beamline – beamline vacuum went higher.
- Beam to F-Cup
- Plan to complete the second part of beamline in two weeks: plan for one-week down in about 2 weeks to install the second DP can, solenoid, ion precipitator and the BNNT diagnostic station.