Difference between revisions of "GTS meeting 3 07 17"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
− | * Measured QE ~ 3.5% with -100 V Gun bias. Was about 0.4% with -1 kV bias. This is to be compared to QE ~ 3.9% | + | * Measured QE ~ 3.5% with -100 V Gun bias. Was about 0.4% with -1 kV bias. This is to be compared to QE ~ 3.9% in Prep Chamber with -280 V bias before moving the photocathode to Gun. |
* Gun vacuum improved when opening the gate valve to beamline | * Gun vacuum improved when opening the gate valve to beamline |
Latest revision as of 11:55, 7 March 2017
- Measured QE ~ 3.5% with -100 V Gun bias. Was about 0.4% with -1 kV bias. This is to be compared to QE ~ 3.9% in Prep Chamber with -280 V bias before moving the photocathode to Gun.
- Gun vacuum improved when opening the gate valve to beamline
- Beam to F-Cup
- Plan to complete the second part of beamline in two weeks. We will have one-week down in about 2 weeks to install the second DP can, solenoid, ion precipitator and the BNNT diagnostic station.