# Ran for few seconds before a HV arc. QE dropped by a factor of 2.
 
# Ran for few seconds before a HV arc. QE dropped by a factor of 2.
 
# Ran again for 1.5 hours (with ion-precipitators on) before a HV arc. QE dropped by another factor of 2.
 
# Ran again for 1.5 hours (with ion-precipitators on) before a HV arc. QE dropped by another factor of 2.
 +
# [https://logbooks.jlab.org/entry/3471482 ion collectors and anode current]
 +
# The ion collector was wired incorrectly resulting in net zero E-field, assuming beam was centered perfectly:
 +
  
  

Revision as of 12:46, 1 May 2017


  • Attempts to run at 1 mA:
  1. Ran for few seconds before a HV arc. QE dropped by a factor of 2.
  2. Ran again for 1.5 hours (with ion-precipitators on) before a HV arc. QE dropped by another factor of 2.
  3. ion collectors and anode current
  4. The ion collector was wired incorrectly resulting in net zero E-field, assuming beam was centered perfectly:


  • Down Monday - Wednesday to:
  1. Degas dump with NEGS at 25% on for ion pumps to take vacuum load
  2. Replace ND filter from ND1 to ND3
  3. Re-activate photocathode with 3 mm active area
  4. Instrument wire scanner
  5. Install WiFi access station and enable JMenu on PC in GTS cave
  6. Why is Dump/FC reading -20 nA?
  7. Hi-pot VIPGT06
  8. SCAM VL frequency is not 60 Hz?