Difference between revisions of "GTS meeting 5 02 17"

From Ciswikidb
Jump to navigation Jump to search
Line 8: Line 8:
 
# [https://logbooks.jlab.org/entry/3471482 ion collectors and anode current]
 
# [https://logbooks.jlab.org/entry/3471482 ion collectors and anode current]
 
# [https://logbooks.jlab.org/entry/3471521 The downstream ion collector was wired incorrectly]
 
# [https://logbooks.jlab.org/entry/3471521 The downstream ion collector was wired incorrectly]
# Cornell PRAB paper on ion clearing electrodes: [[Media:Cornell ion collectors PhysRevAccelBeams.19.034201.pdf]]
+
# Cornell PRAB paper on ion clearing electrodes: [[Media:Cornell ion colelctors PhysRevAccelBeams.19.034201.pdf]]
  
  

Revision as of 14:29, 1 May 2017


  • Attempts to run at 1 mA:
  1. Ran for few seconds before a HV arc. QE dropped by a factor of 2.
  2. Ran again for 1.5 hours (with ion-precipitators on) before a HV arc. QE dropped by another factor of 2.
  3. ion collectors and anode current
  4. The downstream ion collector was wired incorrectly
  5. Cornell PRAB paper on ion clearing electrodes: Media:Cornell ion colelctors PhysRevAccelBeams.19.034201.pdf


  • Down Monday - Wednesday to:
  1. Degas dump with NEGS at 25% on for ion pumps to take vacuum load
  2. Replace ND filter from ND1 to ND3
  3. Re-activate photocathode with 3 mm active area
  4. Instrument wire scanner
  5. Install WiFi access station and enable JMenu on PC in GTS cave
  6. Why is Dump/FC reading -20 nA?
  7. Hi-pot VIPGT06
  8. SCAM VL LINE SYNC frequency is not 60 Hz?
  9. Put ND filter in front of ITVGT06 and mount camera on the floor.