Difference between revisions of "PQB Meeting May 25, 2017"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
# VaTech is making the halo target | # VaTech is making the halo target | ||
# Plan to install this summer | # Plan to install this summer | ||
− | # | + | # Halo sensitivity is about 10<sup>-7</sup> |
− | 2- PQB requirements at Jefferson Lab Electron-Ion Collider (JLEIC) | + | |
+ | 2- PQB requirements at Jefferson Lab Electron-Ion Collider (JLEIC) | ||
+ | |||
+ | |||
+ | 3- Two new Beam Position monitors (BPMs) will be installed immediately after the electron gun and before the 15 degree bend. May want to connect to the Injector Parity DAQ. |
Latest revision as of 10:53, 25 May 2017
We will meet in TL 2236 Thursday May 25 at 9:00 am EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
1- Update on Hall A Halo Monitor:
- Cost is about $2k
- VaTech is making the halo target
- Plan to install this summer
- Halo sensitivity is about 10-7
2- PQB requirements at Jefferson Lab Electron-Ion Collider (JLEIC)
3- Two new Beam Position monitors (BPMs) will be installed immediately after the electron gun and before the 15 degree bend. May want to connect to the Injector Parity DAQ.