Difference between revisions of "Wednesday November 6, 2013"
Jump to navigation
Jump to search
Line 45: | Line 45: | ||
- The minimum rate: | - The minimum rate: | ||
- Is determined once the background rate is known. The real event rate must be higher than the background rate. | - Is determined once the background rate is known. The real event rate must be higher than the background rate. | ||
− | - At HIGS, the background rate was caused by cosmic rays and was about 1 event/min. This cosmic-ray background is expected to be different at JLab tunnel due to earth shielding. | + | - At HIGS, the background rate was caused by cosmic rays and was about 1 event/min. This cosmic-ray background is |
+ | expected to be different at JLab tunnel due to earth shielding. |
Revision as of 12:32, 12 November 2013
We will meet in TED 2561B on Wednesday November 6 at 3:00 pm EST.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 4402297, followed by “#”
Agenda:
1- New "5 MeV" Dipole update media:new_5Mev_dipole_Oct25.pdf media:new_5Mev_dipole_Oct25.doc
2- Bubble Chamber progress at Argonne
3- Discuss the Bubble Chamber dead time: rates and systematic error. How long does it take to acquire one event?
4- Now we have an Accelerator Operations Logbook, BUBBLELOG: [1]
5- Under Accelerator Task List, ATLis, there is now Project: Bubble Chamber to assign tasks to.
6- There will be an Accelerator Seminar on Thursday December 5, 2013:
- Title: Measurement of 16O(γ,α)12C with a bubble chamber and a bremsstrahlung beam at Jefferson Lab Injector - Abstract: media:Abstract_Acc_Seminar.pdf media:Abstract_Acc_Seminar.docx
Notes from this meeting:
- New Dipole Magnet:
- We are going with Model 3 in Jay's design: with 14.6 cm wide, 10 cm long poles - For about $10K one can buy a Hall probe system with claimed accuracy 0.01% and temperature coefficient 10 ppm/C - For a 12.5 cm long magnet, the beam scrapes the beamline - Do we have the steel on-site? - Working with Shaun to complete magnet design and finalize dimensions - This new magnet will work fine up to 16 MeV/c (the maximum energy of the new upgraded Injector)
- Bubble Chamber progress:
- JLab Facility rejected our request for wall power needed for the new Chiller (Two pole, three wire 208V, NEMA 6-15 plug, 8A). They do not provide this configuration. Their normal procedures are to provide 120 V, 20 A, NEMA 5-20 receptacles or 208/120 V, 30 A, NEMA L21-30 receptacles. - Now, what to do about power for the new Chiller?
- Bubble Chamber dead time:
- There is minimum and maximum rates where within this range the bubble chamber will be able to measure the cross section reliably - The minimum rate: - Is determined once the background rate is known. The real event rate must be higher than the background rate. - At HIGS, the background rate was caused by cosmic rays and was about 1 event/min. This cosmic-ray background is expected to be different at JLab tunnel due to earth shielding.